4 resultados para Electric contracting

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The West Liberty Foods turkey cooperative was formed in 1996 to purchase the assets and assume operations of Louis Rich Foods (an investor-owned processing rm), which, at the time, announced the imminent shutdown of its West Liberty, Iowa, processing facility. We study the creation and performance of this �new generation� cooperative using eld interviews with grower members and company management. We describe changes, before and after the buyout, in the contractual apparatus used for procuring live turkeys, and in the communication requirements, work expectations, and nancial positions of growers. During the private ownership period, most of the inputs (except labor and facilities) were provided by the rm; there was substantial supervision of the growers' actions; growers faced little price and production risk; and growers' equity was due largely to ownership of land and other farm assets. Our interviews reveal that, after cooperative formation, growers were exposed to considerable additional risk; monitoring of growers by the rm was less intensive; grower time and effort commitments to turkey production increased substantially; and a signicant fraction of rm (cooperative) equity came from growers' willingness to leverage their farm and personal assets (and hence indirectly their existing relationships with local lenders). We argue that some of these changes are consistent with a nancial contract where asset pledging and its corollary risk generate higher work effort by growers and a reduction in agency rents. These economies likely compensate for an organizational deadweight loss traditionally associated with cooperative governance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the City of Ames Electric Department for the period July 1, 2003 through January 7, 2008

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.