13 resultados para Duty to mitigate the loss
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Mass production of prestressed concrete beams is facilitated by the accelerated curing of the concrete. The ·method most commonly used for this purpose is steam curing at atmospheric pressure. This requires concrete temperatures as high as 150°F. during the curing period. Prestressing facilities in Iowa are located out of doors. This means that during the winter season the forms are set and the steel cables are stressed at temperatures as low as 0°F. The thermal expansion of the prestressing cables should result in a reduction of the stress which was placed in them at the lower temperature. If the stress is reduced in the cables, then the amount of prestress ultimately transferred to the concrete may be less than the amount for which the beam was designed. Research project HR-62 was undertaken to measure and explain the difference between the initial stress placed in the cables and the actual stress which is eventually transferred to the concrete. The project was assigned to the Materials Department Laboratory under the general supervision of the Testing Engineer, Mr. James W. Johnson. A small stress bed complete with steam curing facilities was set up in the laboratory, and prestressed concrete beams were fabricated under closely controlled conditions. Measurements were made to determine the initial stress in the steel and the final stress in the concrete. The results of these tests indicate that there is a general loss of prestressing force in excess of that caused by elastic shortening of the concrete. The exact amount of the loss and the identification of the factors involved could not be determined from this limited investigation.
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.
Resumo:
A multifaceted investigation was undertaken to develop recommendations for methods to stabilize granular road shoulders with the goal of mitigating edge ruts. Included was reconnaissance of problematic shoulder locations, a laboratory study to develop a method to test for changes in granular material stability when stabilizing agents are used, and the construction of three sets of test sections under traffic at locations with problematic granular shoulders. Full results of this investigation are included in this report and its appendices. This report also presents conclusions and recommendations based on the study results.
Resumo:
Iowa legislation required the state’s Water Resources Coordinating Council (WRCC) to submit policy and make recommendations that promote a watershed management approach to reduce the adverse impact of future flooding on this state’s residents, businesses, communities, and soil and water quality.
Resumo:
There is a nationwide need for a safe, efficient and cost effective transportation system. An essential component of this system is the bridges. Local agencies perhaps have an even greater task than federal and state agencies in maintaining the low volume road (LVR) bridge system due to lack of sufficient resources and funding. The primary focus of this study was to review the various aspects of off-system bridge design, rehabilitation, and replacement. Specifically, a reference report was developed to address common problems in LVR bridges. The source of information included both Iowa and national agencies. This report is intended to be a “user manual” or “tool box” of information, procedures and choices for county engineers to employ in the management of their bridge inventory plus identify areas and problems that need to be researched
Resumo:
Load transfer across transverse joints has always been a factor contributing to the useful life of concrete pavements. For many years, round steel dowels have been the conventional load transfer mechanism. Many problems have been associated with the round steel dowels. The most detrimental effect of the steel dowel is corrosion. Repeated loading over time also damages joints. When a dowel is repeatedly loaded over a long period of time, the high bearing stresses found at the top and bottom edge of a bar erode the surrounding concrete. This oblonging creates multiple problems in the joint. Over the past decade, Iowa State University has performed extensive research on new dowel shapes and materials to mitigate the effects of oblonging and corrosion. This report evaluates the bearing stress performance of six different dowel bar types subjected to two different shear load laboratory test methods. The first load test is the AASHTO T253 method. The second procedure is an experimental cantilevered dowel test. The major objective was to investigate and improve the current AASHTO T253 test method for determining the modulus of dowel support, k0. The modified AASHTO test procedure was examined alongside an experimental cantilever dowel test. The modified AASHTO specimens were also subjected to a small-scale fatigue test in order to simulate long-term dowel behavior with respect to concrete joint damage. Loss on ignition tests were also performed on the GFRP dowel specimens to determine the resin content percentage. The study concluded that all of the tested dowel bar shapes and materials were adequate with respect to performance under shear loading. The modified AASHTO method yielded more desirable results than the ones obtained from the cantilever test. The investigators determined that the experimental cantilever test was not a satisfactory test method to replace or verify the AASHTO T253 method.
Resumo:
The Iowa Department of Corrections recently entered into a data sharing agreement with Iowa Workforce Development (IWD), the purpose of which is to better ascertain the effect of prison education on postprison employment. This study is important because the DOC partners with community colleges to provide prison-based education, with a goal of increasing the numbers of inmates completing GEDs. We are demonstrating success toward that goal, but what we lack is empirical evidence showing the level of success that Iowa prison education programs have on Iowa offenders’ employment success upon their return to communities here in the state.
Resumo:
Research project HR-234A was sponsored by the Iowa Highway Research Board and the Iowa Department of Transportation. In the preparation of this compilation of highway and street laws of Iowa, an attempt has been made to include those sections of the Iowa Code Annotated and Iowa Digest to which reference is frequently required by the Department of Transportation, counties, cities and towns in their conduct of highway and street administration, construction and maintenance. This publication is offered with the hope and belief that it will prove to be of value and assistance to those concerned with the problems of establishing, maintaining and administering a highway and street program. Because of the broad scope of highway and street work and the many interrelated provisions of Iowa law, and usable size, some Code provision which are insignificant to the principal subject were omitted out of necessity; others were omitted to avoid repetition. A general index is provided at the end of the text of this volume. Each major topic is divided into subtopics and is accompanied by appropriate Code sections. Specific section numbers as they appear in the Code are in.
Resumo:
This is the Report of the Code Commissioners to the Twenty-fifth General Assembly of the State of Iowa
Resumo:
The first phase of this research involved an effort to identify the issues relevant to gaining a better understanding of the County Engineering profession. A related objective was to develop strategies to attract responsible, motivated and committed professionals to pursue County Engineering positions. In an era where a large percentage of County Engineers are reaching retirement age, the shrinking employment pool may eventually jeopardize the quality of secondary road systems not only in Iowa, but nationwide. As we move toward the 21st century, in an era of declining resources, it is likely that professional staff members in charge of secondary roads will find themselves working with less flexible budgets for the construction and maintenance of roads and bridges. It was important to understand the challenges presented to them, and the degree to which those challenges will demand greater expertise in prioritizing resource allocations for the rehabilitation and maintenance of the 10 million miles of county roads nationwide. Only after understanding what a county engineer is and what this person does will it become feasible for the profession to begin "selling itself", i.e., attracting a new generation of County Engineers. Reaching this objective involved examining the responsibilities, goals, and, sometimes, the frustrations experienced by those persons in charge of secondary road systems in the nine states that agreed to participate in the study. The second phase of this research involved addressing ways to counter the problems associated with the exodus of County Engineers who are reaching retirement age. Many of the questions asked of participants asked them to compare the advantages and disadvantages of public sector work with the private sector. Based on interviews with nearly 50 County Engineers and feedback from 268 who returned surveys for the research, issues relevant to the profession were analyzed and recommendations were made to the profession as it prepares to attract a new generation. It was concluded that both State and Regional Associations for County Engineers, and the National Association of County Engineers are most well-situated to present opportunities for continued professional development. This factor is appealing for those who are interested in competitive advantages as professionals. While salaries in the public sector may not be able to effectively compete with those offered by the private sector, it was concluded that this is only one factor of concern to those who are in the business of "public service". It was concluded, however, that Boards of Supervisors and their equivalents in other states will need to more clearly understand the value of the contributions made by County Engineers. Then the selling points the profession can hope to capitalize on can focus on the strength of state organizations and a strong national organization that act as clearinghouses of information and advocates for the profession, as well as anchors that provide opportunities for staying current on issues and technologies.
Resumo:
In an earlier research project, HR-204, the magnitude and nature of highway related tort claims against counties in Iowa were investigated. However, virtually all of the claims identified in that research resulted from incidents that occurred in areas with predominantly agricultural land use. With recent increases in the rural non-farm population, many traditionally urban problems are also appearing in built-up areas under county jurisdiction. This trend is expected to continue so that counties must anticipate a change in the nature of the tort claims they will encounter. Problems that heretofore have been unique to cities may become commonplace in areas for which counties are responsible. The research reported here has been directed toward an investigation of those problems in rural subdivisions that lead to claims growing out of the provision of highway services by counties. Lacking a sufficient database among counties for the types of tort claims of interest in this research, a survey was sent to 259 cities in Iowa in order to identify highway related problems leading to those claims. The survey covered claims during a five year period from 1975 to 1980. Over one-third of the claims reported were based on alleged street defects. Another 34 percent of the claims contained allegations of damages due to backup of sanitary sewers or defects in sidewalks. By expanding the sample from the 164 cities that responded to the survey, it was estimated that a total of $49,000,000 in claims had been submitted to all 259 cities. Over 34% of this amount resulted from alleged defects in the use of traffic signs, signals, and markings. Another 42% arose from claims of defects in streets and sidewalks. Payments in settlement of claims were about 13.4% of the amount asked for those claims closed during the period covered by the survey. About $9,000,000 in claims was pending on June 30, 1980 according to the information furnished. Officials from 23 cities were interviewed to provide information on measures to overcome the problems leading to tort claims. On the basis of this information, actions have been proposed that can be undertaken by counties to reduce the potential for highway-related claims resulting from their responsibilities in rural subdivisions and unincorporated communities. Suggested actions include the eight recommendations contained in the final report for the previous research under HR-204. In addition, six recommendations resulted from this research, as follows: 1. Counties should adopt county subdivision ordinances. 2. A reasonable policy concerning sidewalks should be adopted. 3. Counties should establish and implement a system for setting road maintenance priorities. 4. Counties should establish and implement a procedure for controlling construction or maintenance activities within the highway right of way. 5. Counties should establish and implement a system to record complaints that are received relating to highway maintenance and to assure timely correction of defective conditions leading to such complaints. 6. Counties should establish and implement a procedure to ensure timely advice of highway defects for which notice is not otherwise received.
Resumo:
This brief discusses several important factors that should be considered when comparing health insurance plans in the health insurance marketplaces across geographic areas.
Resumo:
The MIT Scan T2 device has been implemented in Iowa as a new method for determining PCC pavement thickness compliance. The T2 device utilizes a magnetic pulse induction technology to measure the distance from a sensor to a metal target. The objective of this project was to conduct an interlaboratory study (ASTM C802) to determine the precision of the test.Fifteen MIT Scan T2 gauges and fifteen operators performed testing on three reference platforms and nine pavement locations of varying thicknesses. The testing was conducted on October 29, 2014 at two sites near Ames, Iowa. Usable data was obtained from every operator at all locations.