11 resultados para Divisor of Zero
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Much of the current research in portland cement concrete (PCC) pavements deals with the analysis of early pavement life failures and seeks to find ways to prevent those from reoccurring. The Long Term Pavement Performance (LTPP) portion of the Strategic Highway Research Program (SHRP) has identified some of the key factors in designing and building new PCC pavements. This statement will build on the Iowa Highway Research Board (IHRB) project TR-463, Field Performance Study of Past Iowa Pavement Research: A Look Back. In Iowa and across the nation, there are multiple pavements that were built more than 20 years ago that have been and are continuing to provide very good service to the public. They are found on both state and local routes and in both low and high traffic volume areas. There is a need to learn what went into those pavements, from the subgrade through the surface, that makes them perform so well. The purpose of this research project was to conduct a scoping study that could be used to evaluate the need for additional research to study the attributes of well-performing concrete pavements. The concept of zero-maintenance jointed plain concrete pavements” was iterated in this study for long-lasting, well-performing portland cement concrete pavement sections. The scope of the study was limited to a brief literature survey, pavement performance data collection from many counties, cities, and primary and interstate roads in Iowa, field visits to many selected pavement sites, and analysis of the collected data. No laboratory orfield testing was conducted for this phase of the project. A problem statement with a research plan was created that could be used to guide the second phase of the project.
Resumo:
This study evaluated the use of electromagnetic gauges to determine the adjusted densities of HMA pavements. Field measurements were taken with two electromagnetic gauges, the Pavement Quality Indicator (PQI) 301 and the Pavetracker Plus 2701B. Seven projects were included in the study with 3 to 5 consecutive paving days. For each day/lot 20 randomly selected locations were tested along with seven core locations. The analysis of PaveTracker and PQI density consisted of determining which factors are statistically significant, and core density residuals and a regression analysis of core as a function of PaveTracker and PQI readings. The following key conclusions can be stated: 1. Core density, traffic and binder content were all found to be significant for both electromagnetic gauges studied, 2. Core density residuals are normally distributed and centered at zero for both electromagnetic gauges, 3. For PaveTracker readings, statistically one third of the lots do not have an intercept that is zero and two thirds of the lots do not rule out a scaler correction factor of zero, 4. For PQI readings, statistically the 95% confidence interval rules out the intercept being zero for all seven projects and six of the seven projects do not rule out the scaler correction factor being zero, 5. The PQI 301 gauge should not be used for quality control or quality assurance, and 6. The Pavetracker 2701B gauge can be used for quality control but not quality assurance. This study has found that with the limited sample size, the adjusted density equations for both electromagnetic gauges were determined to be inadequate. The PaveTracker Plus 2701B was determined to be better than the PQI 301. The PaveTracker 2701B could still be applicable for quality assurance if the number of core locations per day is reduced and supplemented with additional PaveTracker 2701B readings. Further research should be done to determine the minimum number of core locations to calibrate the gauges each day/lot and the number of additional PaveTracker 2701B readings required.
Resumo:
The key goals in winter maintenance operations are preserving the safety and mobility of the traveling public. To do this, it is in general necessary to try to increase the friction of the road surface above the typical friction levels found on a snow or ice covered roadway. Because of prior work on the performance of abrasives (discussed in greater detail in chapter 2) a key concern when using abrasives has become how to ensure the greatest increase in pavement friction when using abrasives for the longest period of time. There are a number of ways in which the usage of abrasives can be optimized, and these methods are discussed and compared in this report. In addition, results of an Iowa DOT test of zero-velocity spreaders are presented. Additionally in this study the results of field studies conducted in Johnson County Iowa on the road surface friction of pavements treated with abrasive applications using different modes of delivery are presented. The experiments were not able to determine any significant difference in material placement performance between a standard delivery system and a chute based delivery system. The report makes a number of recommendations based upon the reviews and the experiments.
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.
Resumo:
Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: ""Zero-Percent Financing" Can Cost You Plenty!
Resumo:
Previous Iowa DOT sponsored research has shown that some Class C fly ashes are ementitious (because calcium is combined as calcium aluminates) while other Class C ashes containing similar amounts of elemental calcium are not (1). Fly ashes from modern power plants in Iowa contain significant amounts of calcium in their glassy phases, regardless of their cementitious properties. The present research was based on these findings and on the hyphothesis that: attack of the amorphous phase of high calcium fly ash could be initiated with trace additives, thus making calcium available for formation of useful calcium-silicate cements. Phase I research was devoted to finding potential additives through a screening process; the likely chemicals were tested with fly ashes representative of the cementitious and non-cementitious ashes available in the state. Ammonium phosphate, a fertilizer, was found to produce 3,600 psi cement with cementitious Neal #4 fly ash; this strength is roughly equivalent to that of portland cement, but at about one-third the cost. Neal #2 fly ash, a slightly cementitious Class C, was found to respond best with ammonium nitrate; through the additive, a near-zero strength material was transformed into a 1,200 psi cement. The second research phase was directed to optimimizing trace additive concentrations, defining the behavior of the resulting cements, evaluating more comprehensively the fly ashes available in Iowa, and explaining the cement formation mechanisms of the most promising trace additives. X-ray diffraction data demonstrate that both amorphous and crystalline hydrates of chemically enhanced fly ash differ from those of unaltered fly ash hydrates. Calciumaluminum- silicate hydrates were formed, rather than the expected (and hypothesized) calcium-silicate hydrates. These new reaction products explain the observed strength enhancement. The final phase concentrated on laboratory application of the chemically-enhanced fly ash cements to road base stabilization. Emphasis was placed on use of marginal aggregates, such as limestone crusher fines and unprocessed blow sand. The nature of the chemically modified fly ash cements led to an evaluation of fine grained soil stabilization where a wide range of materials, defined by plasticity index, could be stabilized. Parameters used for evaluation included strength, compaction requirements, set time, and frost resistance.
Resumo:
Roller compacted concrete (RCC) is a zero slump portland cement concrete mixture that has been used since the early 1970's in massive concrete structures. Iowa Highway Research Board project HR-300 was established to determine if this type mix could be used to pave roads on the Iowa road system. Manatt's Inc. of Brooklyn, Iowa agreed to pave an 800 ft. x 22 ft. x 10 in. section of RCC pavement in their Ames construction yard. This report discusses the construction of the test slab and interprets test results conducted during and after construction. It was observed that RCC can be placed with conventional asphalt paving equipment. However, there are several problems with RCC paving which must be resolved before RCC can become a viable paving alternative on Iowa's roadway system.
Resumo:
Triaxial compression tests of two crushed limestones of differing highway service records indicate a fundamental difference in their shear strength -- void ratio relationship. Analyses were based on stress parameters at minimum sample volume, i.e., before there was significant sample dilation due to shear. The better service record sample compacted to higher density, and had a high effective angle of internal friction and zero effective cohesion. The other sample compacted to lower density and had a lower friction angle, but gained significant stability from effective cohesion. Repeated loading-unloading cycles reduced the cohesion, apparently due to modification of the sample structure. Extrapolations of the results to zero void ratio agree with sliding friction data reported on calcite, or with triaxial parameters reported on carbonate rocks.
Resumo:
The Consolid System by American Consolid Inc. is a three product system that, according to product literature, "enables any soil, found anywhere, to be upgraded to achieve better characteristics necessary in improving road life and quality". Consolid was evaluated along with mixes of cement-fly ash and hydrated lime on two soils. The soils were an A-2-4(0) with zero plasticity index and an A-7-8(18) with a 31 plasticity index. American Consolid Inc. recommended an application rate of 0.10% Consolid 444 and 1.00% Conservex by dry soil weight. The application rate chosen for cement-fly ash was 5% cement and 15% fly ash and for hydrated lime it was 6.5%. Testing involved triaxial testing of specimens after water soaking, unconfined compressive strength of specimens before and after water soaking, and freeze and thaw testing of specimens after water soaking. All specimens were compacted to standard proctor at optimum moisture. The cement-fly ash treated mixes had the highest strength and durability followed by the hydrated lime treated mixes.
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.