34 resultados para Distance Corridor Walk
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
The Federal Highway Administration (FHWA)and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct The I-35 Trade Corridor Study.
Resumo:
The Federal Highway Administration (FHWA) and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct a study of Interstate Highway 35 (I-35) from Laredo, Texas to Duluth, Minnesota. The purpose of the study was to assess the need for improved local, intrastate, interstate, and international service on I-35 and to clearly define a general feasible improvement plan to address those needs
Resumo:
The Federal Highway Administration (FHWA)and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct The I-35 Trade Corridor Study.
Resumo:
The Federal Highway Administration (FHWA)and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct The I-35 Trade Corridor Study.
Resumo:
The Federal Highway Administration (FHWA)and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct The I-35 Trade Corridor Study.
Resumo:
The Federal Highway Administration (FHWA)and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct The I-35 Trade Corridor Study.
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Hang up on long distance slamming!
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
Newsletter updating the corridor study of the Mississippi Bridge project for the states of Iowa and Illinois.
Resumo:
The I-74 Aesthetic Design Guideline (ADG) document has two primary goals: To establish and identify an overall design theme To prioritize enhancement opportunities within the framework of corridor elements The recommendations of this report have been developed based on an “unconstrained” framework for future corridor–wide enhancements. Future funding availability, along with the recommendations of this report, will guide the final design process. ADG Future Uses: This document is intended to be used as a reference to future processes in the following ways: Guidance for I-74 final design teams Reference document for future local community redevelopment initiatives Inspiration for identification and development of other I-74 corridor aesthetic enhancement opportunities Process: As illustrated in Figure 1.3, the overall process for corridor aesthetics began traditionally with inventory and identification of potential aesthetic applications. The ADG does not document all the reports and presentations related to these early design stages, but has incorporated these efforts into the design theme, guiding principles and prioritized enhancements shown on the following pages of this report. The I-74 final design phase will incorporate these recommendations into the project. The consultant design team and representatives of the DOTs have worked with the CAAT members to facilitate community input and have helped develop recommendations for improving I-74 corridor aesthetics. CAAT recommendations have been advanced to the I-74 Advisory Committee for review and endorsement. Both DOTs have reviewed the CAAT recommendations and have endorsed the contents of this report. Figure 1.4 illustrates the status of corridor aesthetic design development. As of the date of this report, aesthetic design is approximately 50% complete. Future detailed design, cost evaluation, feasibility and prioritizations all need to occur for this process to be successfully completed.