This study was designed to provide background information on asphaltic concrete mixtures peculiar to northwest Iowa. This background is necessary to provide the basis for future specifications. There were several projects let in 1967 involving l", 3/4" and 3/8" mixes of Type "B'' asphaltic concrete which specified in part, II Not less than 40% of the material passing the No. 200 sieve shall be pulverized limestone or mineral filler, but in no case shall the per cent of pulverized limestone or mineral filler passing the No. 200 sieve be less than 2%. No credit will be allowed for limestone in gravel - II Northwest Iowa has no suitable limestone or mineral filler locally available. As a result, this material has to be imported, raising the cost of the mix approximately twenty-five cents per ton. The purpose of this study, therefore, was designed to compare some original job mix samples with alternate mixes from the same local material, but without the addition of pulverized limestone or mineral filler. Since the filler from the crushed gravel does not have the same crushing characteristics or sieve analysis as the pulverized limestone or mineral filler, they could not be compared on an equal percentage basis. Therefore, the alternate mixes were made to conform to the following proposed specification, "No less than 40% of the material passing No. 200 sieve shall be pulverized limestone or mineral filler or a 100% crushed gravel, but in no case shall the per cent of pulverized limestone or mineral filler or a 100% crushed gravel passing the No. 200 sieve be less than 2%."

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This investigation was initiated to determine the causes of a rutting problem that occurred on Interstate 80 in Adair County. 1-80 from Iowa 25 to the Dallas County line was opened to traffic in November, 1960. The original pavement consisted of 4-1/2" of asphalt cement concrete over 12" of rolled stone base and 12" of granular subbase. A 5-1/2" overlay of asphalt cement concrete was placed in 1964. In 1970-1972, the roadway was resurfaced with 3" of asphalt cement concrete. In 1982, an asphalt cement concrete inlay, designed for a 10-year life, was placed in the eastbound lane. The mix designs for all courses met or exceeded all current criteria being used to formulate job mixes. Field construction reports indicate .that asphalt usage, densities, field voids and filler bitumen determinations were well within specification limits on a very consistent basis. Field laboratory reports indicate that laboratory voids for the base courses were within the prescribed limits for the base course and below the prescribed limits for the surface course. Instructional memorandums do indicate that extreme caution should be exercised when the voids are at or near the lower limits and traffic is not minimal. There is also a provision that provides for field voids controlling when there is a conflict between laboratory voids and field voids. It appears that contract documents do not adequately address the directions that must be taken when this conflict arises since it can readily be shown that laboratory voids must be in the very low or dangerous range if field voids are to be kept below the maximum limit under the current density specifications. A rut depth survey of January, 1983, identified little or no rutting on this section of roadway. Cross sections obtained in October, 1983, identified rutting which ranged from 0 to 0.9" with a general trend of the rutting to increase from a value of approximately 0.3" at MP 88 to a rut depth of 0.7" at MP 98. No areas of significant rutting were identified in the inside lane. Structural evaluation with the Road Rater indicated adequate structural capacity and also indicated that the longitudinal subdrains were functioning properly to provide adequate soil support values. Two pavement sections taken from the driving lane indicated very little distortion in the lower 7" base course. Essentially all of the distortion had occurred in the upper 2" base course and the 1..;1/2" surface course. Analysis of cores taken from this section of Interstate 80 indicated very little densification of either the surface or the upper or lower base courses. The asphalt cement content of both the Type B base courses and the Type A surface course were substantially higher than the intended asphalt cement content. The only explanation for this is that the salvaged material contained a greater percent of asphalt cement than initial extractions indicated. The penetration and viscosity of the blend of new asphalt cement and the asphalt cement recovered from the salvaged material were relatively close to that intended for this project. The 1983 ambient temperatures were extremely high from June 20 through September 10. The rutting is a result of a combination of adverse factors including, (1) high asphalt content, (2) the difference between laboratory and field voids, (3) lack of intermediate sized crushed particles, (4) high ambient temperatures. The high asphalt content in the 2" upper base course produced an asphalt concrete mix that did not exhibit satisfactory resistance to deformation from heavy loading. The majority of the rutting resulted from distortion of the 2" upper base lift. Heater planing is recommended as an interim corrective action. Further recommendation is to design for a 20-year alternative by removing 2-1/2" of material from the driving lane by milling and replacing with 2-1/2" of asphalt concrete with improved stability. This would be .followed by placing 1-1/2" of high quality resurfacing on the entire roadway. Other recommendations include improved density and stability requirements for asphalt concrete on high traffic roadways.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research project HR-231, "Special Surface Preparation Prior to Bituminous Overlay", was initiated in 1982 to study the effectiveness of three different crack fillers in extending pavement life. In particular, this project was designed to determine if any of the fillers could substantially reduce the rate of subsurface deterioration and general deterioration of an asphalt pavement at crack locations. This project also sought to determine the effects of the various crack filling procedures on different thicknesses of bituminous overlays. The three fillers, a fly ash slurry, an emulsion, and a rubberized asphalt mixture, were used along with a control section with no crack filler material on a 2.5 mile section of Cerro Gordo Trunk Route S-25 south of the town of Thornton. This report discusses the construction and performance of each filler material and makes recommendations concerning future use of any of the materials used.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Methods of improving highway safety are of major concern to everyone who is involved in the planning, development and construction of improvements of our vast highway network. Other major concerns are the conservation of our rapidly disappearing sources of energy and quality building materials. This research is devoted to further exploration of a process which will: 1. help preserve higher quality aggregates; and, 2. improve the frictional characteristics and surface texture of asphalt pavement surfaces. Sprinkle treatment of asphalt concrete pavement surfaces with a non-polishing aggregate, a procedure which was developed in Europe, is one method which has shown promise in accomplishing the above listed objectives. This research seeks to explore the feasibility and cost effectiveness of using standard asphalt mixtures of local, less expensive aggregates for surface courses followed by a surface sprinkle treatment of a hard, durable, non-polishing layer of precoated chips to produce a durable, non-skid pavement surface for safe highway travel. Three standard mixture types are being evaluated for aggregate retention characteristics and six sprinkle aggregates are being evaluated for durability, polishing and friction characteristics. In addition, measurements of the surface texture by the silicone putty method are being made. Another feature of this research is the evaluation of a rubberized asphalt material called Overflex MS as a crack filler. It has been reported that the material could be beneficial in reducing reflective cracking. The project was begun in July of 1978 and was completed in August. A review made in the spring of 1979 indicates very satisfactory performance. It was determined from slide photos taken after construction and again in the spring that aggregate retention was very good. However, many cracks had reflected indicating that the Overflex MS had not been effective. Follow up friction test results and texture analysis were also very good. The results of these tests are shown in Appendix A.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Currently, hydraulic cement grouts are approved for Iowa Department of Transportation projects on the basis of a pullout test. However, other properties of the grouts should be evaluated. Therefore, this research was initiated to develop criteria to better evaluate hydraulic cement grouts. Fourteen grouts were tested for compressive strength, time of set, durability, consistency and shrinkage. Tested grouts all yielded compressive strengths higher than 3000 psi at 7 days and durability factors were well above 70. Time of set and consistency was adequate. The testing showed most grouts tested shrank, even though tested grouts were labeled non-shrink grouts. For many applications of grouts such as setting in anchor bolts and as a filler, minor shrinkage is not a problem. However, for some critical applications, shrinkage cannot be tolerated. The proposed Instructional Memorandum will identify those grouts which do not excessively shrink or expand in the tests used. Based on test results, criteria for evaluation of hydraulic cement grouts have been recommended. Evaluation consists of tests for compressive strength, time of set, durability, consistency, shrinkage and pullout test.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fly ash, a by-product of coal-fired electricity generating plants, has for years been promoted as a material suitable for highway construction. Disposal of the large quantities of fly ash produced is expensive and creates environmental concerns. The pozzolanic properties make it promotable as a partial Portland cement replacement in pc concrete, a stabilizer for soil and aggregate in embankments and road bases, and a filler material in grout. Stabilizing soils and aggregates for road construction has the potential of using large quantities of fly ash. Iowa Highway Research Board Project HR-194, "Mission-Oriented Dust Control and Surface Improvement Processes for Unpaved Roads", included short test sections of cement, fly ash, and salvaged granular road material mixed for a base in western Iowa. The research showed that cement fly ash aggregate (CFA) has promise as a stabilizing agent in Iowa. There are several sources of sand that when mixed with fly ash may attain strengths much greater than fly ash mixed with salvaged granular road material at little additional cost