18 resultados para Crack-seal
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Four Iowa DOT asphalt concrete pavement crack sealing projects were selected to evaluate the benefits of heat lance crack preparation. Two, one-half mile sections, both with and without heat lance preparation, were constructed in Story, Monroe, Clinton and Wayne Counties in 1991 and 1992. They were visually evaluated annually from 1992 through 1996. The heat lance preparation did not yield improved seal performance or extended longevity. There was no perceivable difference between crack sealing with and without heat lance preparation.
Resumo:
Final report produced by DOT on development of manual crack quantification and automatic crack measurment system.
Resumo:
Deterioration in portland cement concrete (PCC) pavements can occur due to distresses caused by a combination of traffic loads and weather conditions. Hot mix asphalt (HMA) overlay is the most commonly used rehabilitation technique for such deteriorated PCC pavements. However, the performance of these HMA overlaid pavements is hindered due to the occurrence of reflective cracking, resulting in significant reduction of pavement serviceability. Various fractured slab techniques, including rubblization, crack and seat, and break and seat are used to minimize reflective cracking by reducing the slab action. However, the design of structural overlay thickness for cracked and seated and rubblized pavements is difficult as the resulting structure is neither a “true” rigid pavement nor a “true” flexible pavement. Existing design methodologies use the empirical procedures based on the AASHO Road Test conducted in 1961. But, the AASHO Road Test did not employ any fractured slab technique, and there are numerous limitations associated with extrapolating its results to HMA overlay thickness design for fractured PCC pavements. The main objective of this project is to develop a mechanistic-empirical (ME) design approach for the HMA overlay thickness design for fractured PCC pavements. In this design procedure, failure criteria such as the tensile strain at the bottom of HMA layer and the vertical compressive strain on the surface of subgrade are used to consider HMA fatigue and subgrade rutting, respectively. The developed ME design system is also implemented in a Visual Basic computer program. A partial validation of the design method with reference to an instrumented trial project (IA-141, Polk County) in Iowa is provided in this report. Tensile strain values at the bottom of the HMA layer collected from the FWD testing at this project site are in agreement with the results obtained from the developed computer program.
Resumo:
Extensive programmed laboratory tests involving some 400 asphalt emulsion slurry seals (AESS) were conducted. Thirteen aggregates including nine Iowa sources, a quartzite, a synthetic aggregate (Haydite), a limestone stone from Nebraska, and a Chat aggregate from Kansas were tested in combination with four emulsions and two mineral fillers, resulting in a total of 40 material combinations. A number of meetings were held with the Iowa DOT engineers and 12 state highway departments that have had successful slurry seal experiences and records, and several slurry seal contractors and material and equipment suppliers were contacted. Asphalt emulsion slurry seal development, uses, characteristics, tests, and design methods were thoroughly reviewed in conjunction with Iowa's experiences through these meetings and discussions and through a literature search (covering some 140 articles and 12 state highway department specifications). It was found that, while asphalt emulsion slurry seals (when properly designed and constructed) can economically improve the quality and extend the life of existing pavement surface, experiences with them had been mixed due to the many material, slurry, and construction variables that affect their design, construction, and performance. The report discusses those variables identified during the course of the project and makes recommendations concerning design procedures, design criteria, specifications and the means of evaluating them.
Resumo:
This research was initiated to identify methods of reducing the occurrence of transverse cracking. Eight (four repetitive) research sections were established to study three variations in the asphalt concrete pavement. The first variation was the comparison of low- and high-temperature-susceptible asphalt cement (AC) from two different sources. The second variable was to saw and seal transverse joints at spacings varying from 40 to 100 ft. The third variable was to increase the AC content in the asphalt treated base by 1 percent. The research sections were constructed with relatively few problems. Crack and joint surveys have been conducted on all research sections at intervals of less than 1 year since construction. No cracking was identified after the first winter season. The sawed joints also remained sealed through the first winter. At an age of approximately 1 1/2 years there was substantial cracking of the high-temperature-susceptible AC sections and substantial failure of the sealant material in the sawed joints. After almost 4 years, the asphalt pavement constructed with the high-temperature-susceptible AC produced a crack interval of 35 ft, the low-temperature-susceptible AC yielded an interval of 170 ft, and the low-temperature-susceptible AC with an increased AC content yielded an interval of 528 ft. The Pen-Vis number is an effective measure of temperature susceptibility of asphalt cements. The frequency of transverse cracking is affected by the temperature susceptibility of the AC. An increased AC content also reduces the frequency of transverse cracking.
Resumo:
Seal coat and chip seal treatments are commonly used as an economical treatment to provide a new surface to an old asphalt roadway. To be successful, the aggregate or chips must be held in place on the roadway by the asphalt binder over a long period of time. It is common, over time, that the binder becomes aged and brittle and loses its ability to be flexible and hold the aggregate in place. Modifiers have been introduced to extend the life and adhesion characteristics of asphaltic binders.
Resumo:
The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.
Resumo:
Asphalt concrete resurfacing is the most commonly utilized rehabilitation practice used by the Iowa Department of Transportation. The major problem with asphalt concrete resurfacing is the reflective cracking from underlying cracks and joints in the portland cement concrete (PCC) pavement. Cracking and seating the PCC prior to an asphalt overlay was the construction method evaluated in this project. There was cracking and seating on portions of the project and portions were overlaid without this process. There were also different overlay thicknesses used. Comparisons of crack and seating to the normal overlay method and the different depths are compared in this report. Cracking and seating results in some structural loss, but does reduce the problem of reflection cracking.
Resumo:
In 1980, a Vanguard High Pressure Water Blaster capable of providing 10 gallons of water per minute at 2000 psi was purchased to evaluate water blasting as a crack cleaning method prior to crack filling on asphalt concrete pavements. Afer some iniital trials demonstrated its effectiveness of removing dirt, debris and vegetation, it was included in joint and crack maintenance research on Iowa 7 in Webster County. The objective of the research was to evaluate six crack preparation methods and seven "sealant" materials. The cleaning and sealing was performed in the spring of 1983. Visual evaluations of the performance were made in the fall of 1983 and spring of 1985. Compressed air and/or high pressure water did not adequately prepare cracks less than 3/8 inch wide. Routing or sawing was necessary to provide a sealant reservoir. The water blaster was more effective than compressed air in removing dirt, debris and vegetation but this did not yield significant improvement in sealant adhesion or longevity. Periodic crack filling is necessary on ACC surfaces throughout the remaining life of the pavement.
Resumo:
Bridge deck cracking occasionally occurs during construction for any number of reasons. Improper design, concrete placement or deck curing can result in cracks. One contributing factor toward cracking may be dead load deflections induced during concrete placement. For both continuous and non-continuous bridges, specific placement sequences are required to minimize harmful deflections in previously placed sections. Set retarding admixtures are also used to keep previously placed concrete plastic until the pour is completed. The problem is--at what point does movement of the concrete cause permanent damage to the deck. The study evaluated the time to crack formation relationship for mixes with low and high dosages of set retarding admixtures currently approved for use in Iowa state and county projects.
Resumo:
The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the control sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. A final report for research project HR-165, based upon overall performance evaluation was published in December 1978.
Resumo:
For the past several year Kossuth County has had a scheduled maintenance program of bituminous seal coating. This program has been used to maintain the 467 miles of asphaltic concrete surfaced roads in Kossuth County. Since most of the experience that Kossuth County had in seal coating was with cutback asphalt, it was decided to include the use of emulsified asphalt in Kossuth County's 1980 seal coat program. Federal Demonstration Project Funds were requested from the Federal Highway Administration to study the use of emulsified asphalt and funding was granted under Demonstration Project No. 55,:Asphalt Emulsions for Highway Construction." Items studied were design and construction procedure cost of alternate material, energy consumption and environmental considerations. A construction contract was awarded to Everds Brothers, Inc. of Algona, Iowa, on July 1, 1980. There were four bidders on the 54.5 miles of seal coating that was let. A map showing the location of the seal coating projects is shown in Appendix A, and a copy of the contract is shown in Appendix B. The contractor started the project on July 11, 1980 and completed the project on August 1, 1980. Construction inspection and follow-up inspections of the project were conducted by personnel of the Kossuth County Engineer's Office and testing of the materials, friction testing and road rater testing were conducted by the Material's Department of the Iowa Department of Transportation.
Resumo:
A mechanical gauge was developed to monitor the movement of crack or joint openings in portland cement concrete structures, in general, and portland cement concrete pavements in particular. Designed to be inexpensive and simple to operate, this gauge is capable of recording maximum, minimum, and instantaneous crack or joint openings. Specific recommendations were made for recording minimum and maximum pavement temperature over the monitoring period. The report was written as a set of guidelines for design, fabrication, installation, and operation of the gauge as well as the temperature measuring device.
Resumo:
The Iowa DOT has been using the AASHTO Present Serviceability Index (PSI) rating procedure since 1968 to rate the condition of pavement sections. A ride factor and a cracking and patching factor make up the PSI value. Crack and patch surveys have been done by sending crews out to measure and record the distress. Advances in video equipment and computers make it practical to videotape roads and do the crack and patch measurements in the office. The objective of the study was to determine the feasibility of converting the crack and patch survey operation to a video recording system with manual post processing. The summary and conclusions are as follows: Video crack and patch surveying is a feasible alternative to the current crack and patch procedure. The cost per mile should be about 25 percent less than the current procedure. More importantly, the risk of accidents is reduced by getting the people and vehicles off the roadway and shoulder. Another benefit is the elimination of the negative public perceptions of the survey crew on the shoulder.
Resumo:
This Phase II follow-up study of IHRB Project TR-473 focused on the performance evaluation of rubblized pavements in Iowa. The primary objective of this study was to evaluate the structural condition of existing rubblized concrete pavements across Iowa through Falling Weight Deflectometer (FWD) tests, Dynamic Cone Penetrometer (DCP) tests, visual pavement distress surveys, etc. Through backcalculation of FWD deflection data using the Iowa State University's advanced layer moduli backcalculation program, the rubblized layer moduli were determined for various projects and compared with each other for correlating with the long-term pavement performance. The AASHTO structural layer coefficient for rubblized layer was also calculated using the rubblized layer moduli. To validate the mechanistic-empirical (M-E) hot mix asphalt (HMA) overlay thickness design procedure developed during the Phase I study, the actual HMA overlay thicknesses from the rubblization projects were compared with the predicted thicknesses obtained from the design software. The results of this study show that rubblization is a valid option to use in Iowa in the rehabilitation of portland cement concrete pavements provided the foundation is strong enough to support construction operations during the rubblization process. The M-E structural design methodology developed during Phase I can estimate the HMA overlay thickness reasonably well to achieve long-lasting performance of HMA pavements. The rehabilitation strategy is recommended for continued use in Iowa under those conditions conducive for rubblization.