Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1996, the Iowa Division of Criminal and Juvenile Justice Planning was asked by the Governor’s Alliance on Substance Abuse (GASA) to examine the five Youthful Offender Programs (YOPs) that were in operation at that time. The focus of the original study was to describe the programs, their clientele, and two outcome measures (program completion and recidivism). One section of the report provided a detailed description of each of the five programs in operation at the time of the original study and the findings for each. Another section of the report highlighted program completion rates and recidivism rates. The Youthful Offender Programs were designed to operate as part of a partnership with a number of different agencies (county attorneys, the district departments of correctional services, and a variety of different treatment agencies) to provide a holistic approach in the rehabilitation of youthful offenders. These programs were designed specifically for offenders between the ages of 16 and 21 who had committed first time felonies or aggravated misdemeanors as an alternative to incarceration or in response to non-compliant probationer behaviors. Offenders who were 16 and 17 years of age had to have been waived to the adult court to be eligible for entry to the program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The air void analyzer (AVA) with its independent isolation base can be used to accurately evaluate the air void system—including volume of entrained air, size of air voids, and distribution of air voids—of fresh portland cement concrete (PCC) on the jobsite. With this information, quality control adjustments in concrete batching can be made in real time to improve the air void system and thus increase freeze-thaw durability. This technology offers many advantages over current practices for evaluating air in concrete.