11 resultados para Competitive capacity
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Information on the Promising Transition Practices shared at the September 28, 2007 Capacity Building Forum sponsored by Improving Transition Outcomes with Iowa Vocational Rehabilitation Services.
Resumo:
Iowa’s infrastructure is at a crossroads. A stalwart collection of Iowans dared to consider Iowa’s future economy, the way ahead for future generations, and what infrastructure will be required – and what will not be required – for Iowa to excel. The findings are full of opportunity and challenge. The Infrastructure Plan for Iowa’s Future Economy: A Strategic Direction tells the story and points the way to a strong economy and quality of life for our children and our children’s children. This plan is different from most in that the motivation for its development came not from a requirement to comply or achieve a particular milestone, but, rather, from a recognition that infrastructure, in order to ensure a globally-competitive future economy, must transform from that of past generations. It is not news that all infrastructure – from our rich soil to our bridges – is a challenge to maintain. Prior to the natural disasters of 2008 and the national economic crisis, Iowa was tested in its capacity to sustain not only the infrastructure, but to anticipate future needs. It is imperative that wise investments and planning guide Iowa’s infrastructure development. This plan reflects Iowa’s collective assessment of its infrastructure– buildings, energy, natural resources, telecommunications, and transportation – as, literally, interdependent building blocks of our future. Over the months of planning, more than 200 Iowans participated as part of committees, a task force, or in community meetings. The plan is for all of Iowa, reflected in private, nonprofit, and public interests and involvement throughout the process. Iowa’s success depends on all of Iowa, in all sectors and interests, to engage in its implementation. The Infrastructure Plan for Iowa’s Future Economy: A Strategic Direction sets a clear and bold direction for all stakeholders, making it clear all have a responsibility and an opportunity to contribute to Iowa’s success.
Resumo:
Summary table of bed capacity recommendations by Durrant, in association with Pulitzer-Bogard & Associates and Criminal Justice Institute.
Resumo:
The focus of this report is a capacity analysis of two long-term urban freeway Work Zones. Work Zone #1 tapered four mainline lanes to two, using two separate tapers; Work Zone #2 tapered two mainline lanes to one. Work Zone throughput was analyzed throughout the day over multiple days and traffic operations conditions were analyzed up to a distance of five miles upstream of the Work Zone entrance. Historical data from pavement-embedded detectors were used to analyze traffic conditions. The database consisted of five-minute volume, speed and occupancy data collected from 78 detectors for a total of 50 days. Congestion during each analyzed Work Zone existed for more than fourteen hours each day; Work Zone impacts adversely affected freeway operations over distances of 3.7 to 4.2 miles. Speed and occupancy conditions further upstream were, however, not affected, or even improved due to significant trip diversion. Work Zone capacity was defined based on the maximum traffic flows observed over a one-hour period; throughput values were also compiled over longer periods of time when traffic was within 90% of the maximum observed one-hour flows, as well as over the multi-hour mid-day period. The Highway Capacity Manual freeway capacity definition based on the maximum observed 15-min period was not used, since it would have no practical application in estimating Work Zone throughput when congested conditions prevail for the majority of the hours of the day. Certain noteworthy changes took place for the duration of the analyzed Work Zones: per-lane throughput dropped; morning peak periods started earlier, evening peak periods ended later and lasted longer; mid-day volumes dropped accompanied by the highest occupancies of the day. Trip diversion was evident in lower volumes entering the analyzed freeway corridor, higher volumes using off-ramps and lower volumes using onramps upstream of the Work Zones. The majority of diverted traffic comprised smaller vehicles (vehicles up to 21 feet in length); combination truck volumes increased and their use of the median lane increased, contrary to smaller vehicles that shifted toward a heavier use of the shoulder lane.
Resumo:
This report presents the results of work zone field data analyzed on interstate highways in Missouri to determine the mean breakdown and queue-discharge flow rates as measures of capacity. Several days of traffic data collected at a work zone near Pacific, Missouri with a speed limit of 50 mph were analyzed in both the eastbound and westbound directions. As a result, a total of eleven breakdown events were identified using average speed profiles. The traffic flows prior to and after the onset of congestion were studied. Breakdown flow rates ranged between 1194 to 1404 vphpl, with an average of 1295 vphpl, and a mean queue discharge rate of 1072 vphpl was determined. Mean queue discharge, as used by the Highway Capacity Manual 2000 (HCM), in terms of pcphpl was found to be 1199, well below the HCM’s average capacity of 1600 pcphpl. This reduced capacity found at the site is attributable mainly to narrower lane width and higher percentage of heavy vehicles, around 25%, in the traffic stream. The difference found between mean breakdown flow (1295 vphpl) and queue-discharge flow (1072 vphpl) has been observed widely, and is due to reduced traffic flow once traffic breaks down and queues start to form. The Missouri DOT currently uses a spreadsheet for work zone planning applications that assumes the same values of breakdown and mean queue discharge flow rates. This study proposes that breakdown flow rates should be used to forecast the onset of congestion, whereas mean queue discharge flow rates should be used to estimate delays under congested conditions. Hence, it is recommended that the spreadsheet be refined accordingly.
Resumo:
Audit report on the American Recovery and Reinvestment Act (ARRA) - Program of Competitive Grants for Worker Training and Placement in High Growth and Emerging Industry Sectors program for the Iowa Green Renewable Electrical Energy Network Inc. (IGREEN) for the year ended June 30, 2012
Resumo:
Capacity is affected by construction type and its intensity on adjacent open traffic lanes. The effect on capacity is a function of vehicles moving in and out of the closed lanes of the work zone, and the presence of heavy construction vehicles. Construction activity and its intensity, however, are not commonly considered in estimating capacity of a highway lane. The main purpose of this project was to attempt to quantify the effects of construction type and intensity (e.g. maintenance, rehabilitation, reconstruction, and milling) on work zone capacity. The objective of this project is to quantify the effects of construction type and its intensity on work zone capacity and to develop guidelines for MoDOT to estimate the specific operation type and intensity that will improve the traffic flow by reducing the traffic flow and queue length commonly associated with work zones. Despite the effort put into field data collection, the data collected did not show a full speed-flow chart therefore extracting a reliable capacity value was difficult. A statistical comparison between the capacity values found in this study using either methodologies indicates that there is an effect of construction activity on the values work zone capacity. It was found that the heavy construction activity reduces the capacity. It is very beneficial to conduct similar studies on the capacity of work zone with different lane closure barriers, which is also directly related to the type of work zone being short-term or long-term work zones. Also, the effect of different geometric and environmental characteristics of the roadway should be considered in future studies.
Resumo:
This issue review provides information on the Department of Corrections current and projected offender population, facility capacity, construction update and impact on the general fund.
Resumo:
Although extensive research has been conducted on urban freeway capacity estimation methods, minimal research has been carried out for rural highway sections, especially sections within work zones. This study attempted to fill that void for rural highways in Kansas, by estimating capacity of rural highway work zones in Kansas. Six work zone locations were selected for data collection and further analysis. An average of six days’ worth of field data was collected, from mid-October 2013 to late November 2013, at each of these work zone sites. Two capacity estimation methods were utilized, including the Maximum Observed 15-minute Flow Rate Method and the Platooning Method divided into 15-minute intervals. The Maximum Observed 15-minute Flow Rate Method provided an average capacity of 1469 passenger cars per hour per lane (pcphpl) with a standard deviation of 141 pcphpl, while the Platooning Method provided a maximum average capacity of 1195 pcphpl and a standard deviation of 28 pcphpl. Based on observed data and analysis carried out in this study, the suggested maximum capacity can be considered as 1500 pcphpl when designing work zones for rural highways in Kansas. This proposed standard value of rural highway work zone capacity could be utilized by engineers and planners so that they can effectively mitigate congestion at or near work zones that would have otherwise occurred due to construction/maintenance.
Resumo:
Iowa's first field application of synthetic engineering fabrics was on research project HR-158, "Prevention of Reflective Cracking in Asphalt Overlays". This research placed in September 1971 used three different engineering fabrics. A final report concluding generally favorable performance was distributed in May 1977. There have been a number of Iowa engineering fabric installations since that initial project.
Resumo:
“Capacity” and “competency” are terms that are often used interchangeably. However, under Iowa law and specifically within the context of an individual’s rights to make his/ her own decisions, there is a very important difference between the two words. An understanding of the difference between “capacity” and “competency” (as explained on this fact sheet) is essential to determine whether an individual’s consent is valid.