3 resultados para Coli Nitrate Reductase
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Part of the Department of Natural Resources' Water Fact Sheet Series. This one is about Nitrate in Iowa's rivers and streams.
Resumo:
Iowa agriculture depends on anhydrous ammonia as a low-cost form of nitrogen fertilizer on 61 percent of Iowa’s 12.4 million acres of corn. Now we find a threat to that source of nutrient—the theft of anhydrous ammonia for use in making a powerful, illegal narcotic called methamphetamine. Naturally, the fertilizer industry is outraged by the illegal and illicit use of our products. We want to play a role in preventing abuse in the future. By raising awareness, knowing how to respond and using the Meth Inhibitor, fertilizer dealers can assist law enforcement in combating this illicit use of a product important to Iowa farmers.
Resumo:
Dry Run Creek Watershed was designated an impaired waterbody by DNR in 2002, following an assessment of the biota in the stream by DNR Biologist, Tom Wilton. Subsequent studies by IOWATER Snapshot effort in 2003, found e-coli bacteria concentrations and high nitrate readings in excess of the State of Iowa limits for recreational streams. The Dry Run Creek Watershed Improvement Project is comprised of five major components. Three components will feature demonstrations of structural best management practices (BMPs) to protect water quality in Dry Run Creek. The fourth is an educational workshop to "kick-off" the initiative and background the stakeholders of the watershed in new stormwater management strategies for water quality protection. The fifth is a monitoring program that will provide data on the effectiveness of the practices to be demonstrated. Measurable outcomes from these projects include monitoring to document the effectiveness of infiltration based BMPs to reduce pollutant loading in urban stormwater runoff and reducing the volume of stormwater discharged directly into Dry Run Creek via storm sewer flows. Understanding of and social acceptance of new stormwater strategies and practices will also be monitored by surveys of watershed stakeholders and compared to findings of a survey done before the start of the project.