34 resultados para Clean practices
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Crooping practices produced by Iowa Departmment of Agriculture and Land Stewardship
Resumo:
City Audit Report
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
This guidebook has been published by the University of Northern Iowa New Iowans Program to assist employers, managers and supervisors with the unique challenges associated with hiring, training and integrating immigrant and refugee workers. Its purpose is to promote proactive engagement of newcomer workers to assure the vitality of Iowa businesses. Successful integration of immigrants and refugees in our workplaces and communities is essential to insure Iowa’s long-term economic and social health. This book provides essential information for human resource directors, trainers, supervisors and others as they meet the challenges and rewards of hiring immigrants and refugees. Of course, no guidebook can provide simple solutions to complex issues in a great variety if workplaces. This is not a “cookbook” with recipes that provide easy answers to challenges facing every company and worker. All employers are unique and approach problems differently. What works in one company might not work as well in another.
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
Task Force members formulated these principles and practices as a way to promote good management practices, ethical conduct, and public accountability. By compiling the information in this guide, we hope to provide a valuable tool for organizations and individuals as they go about the work of building better Iowa communities.
Resumo:
One of the most important issues in portland cement concrete pavement research today is surface characteristics. The issue is one of balancing surface texture construction with the need for durability, skid resistance, and noise reduction. The National Concrete Pavement Technology Center at Iowa State University, in conjunction with the Federal Highway Administration, American Concrete Pavement Association, International Grinding and Grooving Association, Iowa Highway Research Board, and other states, have entered into a three-part National Surface Characteristics Program to resolve the balancing problem. As a portion of Part 2, this report documents the construction of 18 separate pavement surfaces for use in the first level of testing for the national project. It identifies the testing to be done and the limitations observed in the construction process. The results of the actual tests will be included in the subsequent national study reports.
Resumo:
According to the 1972 Clean Water Act, the Environmental Protection Agency (EPA) established a set of regulations for the National Pollutant Discharge Elimination System (NPDES). The purpose of these regulations is to reduce pollution of the nation’s waterways. In addition to other pollutants, the NPDES regulates stormwater discharges associated with industrial activities, municipal storm sewer systems, and construction sites. Phase II of the NPDES stormwater regulations, which went into effect in Iowa in 2003, applies to construction activities that disturb more than one acre of ground. The regulations also require certain communities with Municipal Separate Storm Sewer Systems (MS4) to perform education, inspection, and regulation activities to reduce stormwater pollution within their communities. Iowa does not currently have a resource to provide guidance on the stormwater regulations to contractors, designers, engineers, and municipal staff. The Statewide Urban Design and Specifications (SUDAS) manuals are widely accepted as the statewide standard for public improvements. The SUDAS Design manual currently contains a brief chapter (Chapter 7) on erosion and sediment control; however, it is outdated, and Phase II of the NPDES stormwater regulations is not discussed. In response to the need for guidance, this chapter was completely rewritten. It now escribes the need for erosion and sediment control and explains the NPDES stormwater regulations. It provides information for the development and completion of Stormwater Pollution Prevention Plans (SWPPPs) that comply with the stormwater regulations, as well as the proper design and implementation of 28 different erosion and sediment control practices. In addition to the design chapter, this project also updated a section in the SUDAS Specifications manual (Section 9040), which describes the proper materials and methods of construction for the erosion and sediment control practices.
Resumo:
Audit report on the Iowa Water Pollution Control Works Financing Program (Clean Water Program) and the Iowa Drinking Water Facilities Financing Program (Drinking Water Program), joint programs of the Iowa Finance Authority and the Iowa Department of Natural Resources, for the year ended June 30, 2006
Resumo:
Summary of the Promising Transition Practices implemented under the Improving Transition Outcomes with Iowa Vocational Rehabilitation Services grant.
Resumo:
Information on the Promising Transition Practices shared at the September 28, 2007 Capacity Building Forum sponsored by Improving Transition Outcomes with Iowa Vocational Rehabilitation Services.
Resumo:
The cost to Iowa taxpayers is over $13.5 million per year for cleaning up littering and illegal dumping by others. It is estimated that the cost to the private sector is at least this high. Over thirteen million of this cost is spent on clean up efforts; less than $300,000 is spent on prevention. To have success in combating illegal dumping and littering, more effort, time, and money must be paid to prevention. The following is a summary the most recent research and work on beautification and the litter and illegal dumping problem
Resumo:
The State of Iowa and the Hiring Practices Working Group commissioned this review of the State’s hiring practices in response to recent concerns about these practices involving racial discrimination claims against the Departments of Human Services, Transportation, and Iowa Workforce Development. The State of Iowa should be commended for undertaking this review. The State has a longstanding Affirmative Action Program and commitment to diversity – they instituted their Affirmative Action Program in 1973, and continue their commitment to its success by making the changes necessary to ensure the program is viable and sustainable. Iowa Department of Administrative Services In July 2003, the State created the Iowa Department of Administrative Services (DAS) as a way to manage and coordinate the major resources of state government. DAS provides human resource services through an entrepreneurial management model. Entrepreneurial management is a customer-focused approach to delivering services. The customer departments have input about what services and products they want from DAS and in turn DAS is funded by the customer departments through purchases of DAS services and products. DAS looks to offer new and additional services (for example recruitment support and coordination) to various customers on a fee-for-service basis. A customer council is charged with approving the DAS business plan, establishing the rate for services, and reviewing service delivery and complaints. Under this entrepreneurial model, human resource services are provided by DAS-HRE (Human Resources Enterprise) central staff, 12 DAS-HRE Personnel Officers located at the customer departments, and customer agency staff. The majority of the recruitment and hiring functions are done by the customer (hiring) departments and their staff. Applications for employment are submitted using the BrassRing system with applicants being qualified by DAS-HRE employees. Since the creation of Human Resources Enterprise, DAS-HRE has strived to provide human resource tools to the departments. The Screening Manual and the Supervisor’s Manual are just two examples of the resources created for the hiring departments. They also provide Supervisor Training for newly appointed supervisors. Larger departments have dedicated staff assigned to human resource activities. The staff at the departmental level may or may not have a human resources background. Iowa Population and Workforce The 2000 U.S. Census indicated that Iowa’s population was 2,926,324. According to this census, 92.6 percent of Iowa’s population identified their race as white (alone). The nonwhite alone or minority population (including Black or African American, Asian, Native Hawaiian or Pacific Islander, Hispanic or Latino, American Indian or Alaska Native, two or more races, or some other race) was 7.4 percent.
Resumo:
Audit report on the Iowa Water Pollution Control Works Financing Program (Clean Water Program) and the Iowa Drinking Water Facilities Financing Program (Drinking Water Program), joint programs of the Iowa Finance Authority and the Iowa Department of Natural Resources for the year ended June 30, 2009
Resumo:
Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the amount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims appeared to have occurred randomly. However, using data from a sub sample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of warning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an example of such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.