10 resultados para CONVENIENCE
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
As an expansion of SF2088, the Department of Administrative Services-Information Technology Enterprise (DAS-ITE) was asked to further analyze the potential costs and savings if the current practice of charging credit card and overhead fees (“value-added fees”) were to be eliminated. Value-added fees reflect the costs an agency incurs while providing online services, and those costs will always exist.. DAS-ITE researched these costs and identified ways of making the associated fees less burdensome to the citizens of Iowa. The three alternatives provide different ways in which agencies can recover those costs; they could be borne by either an annual appropriation or adjustment of the online service “price” to include the fees within the cost of the online transaction. An additional alternative is presented to leave the current value-added fee practices in place. Recognition must also be made of the fact that traditional forms of conducting business with the State of Iowa, face-to-face and paper-based transactions, are inherently more costly. These delivery channels are effectively subsidized by the agency as a “cost of doing business” and the associated expense of the transactions is not passed on to the customer.
Resumo:
This Voter Guide is intended to help all eligible Iowans, regardless of health or physical disability, to register and vote on election day. This guide contains information on voter registration, voting accessibility, absentee voting and important election dates and deadlines. The Iowa Department for the Blind has an audio cassette version of this Voter Guide available for your convenience. NOTE: THIS VOTER GUIDE WAS VALID THROUGH 2003. IF YOU WANT THE CURRENT VOTER INFORMATION INCLUDING THE ABSENTEE BALLOT REQUEST FORM GO TO: http://www.sos.state.ia.us/elections/index.html
Resumo:
How people choose to live depends on a variety of social and economic circumstances. Single family dwellings, extended family compounds, and communal apartment blocks are all forms of residential architecture that have ancient roots and occur in every culture. Each form both reflects and affects the living styles of the people who reside there. The double house, which shelters two families in units separated by a wall or floor, balances the convenience of an apartment with the psychological comforts of a home. During the mid to late nineteenth and early twentieth centuries in the United States, the double house was hugely popular in some cities, such as Minneapolis and Milwaukee, but only a minimal presence in Des Moines
Resumo:
House File 2754, relating to renewable fuel and energy, was enacted on May 30, 2006. The Act established goals and incentives for the use of renewable fuel, including E85 gasoline (85 percent ethanol and 15 percent gasoline). Section 33 of the Act states: Sec. 33. DEPARTMENTAL STUDY – E85 GASOLINE AVAILABILITY. The state department of transportation and the department of natural resources shall cooperate to conduct a study to provide methods to inform persons of the availability of E85 gasoline offered for sale and distribution by retail dealers of motor fuel in this state, including the location of each retail motor fuel site where a retail dealer offers E85 gasoline for sale and distribution. The department's study shall include methods for identifying those locations for the convenience of the traveling public including but not limited to the identification of those locations on roadside signs and on the official Iowa map published pursuant to section 307.14. The departments shall jointly prepare and deliver a report to the governor and general assembly, which includes findings and recommendations, not later than January 10, 2007.
Resumo:
The authors have post-tensioned and monitored two Iowa bridges and have field tested the post-tensioning of a composite bridge in Florida. In order to provide the practical post-tensioning distribution factors given in this manual, the authors developed a finite element model of a composite bridge and checked the model against a one-half scale laboratory bridge and two actual composite bridges, one of which had a 45 deg skew. Following a brief discussion of this background research, this manual explains the use of elastic, composite beam and bridge section properties, the distribution fractions for symmetrically post-tensioned exterior beams, and a method for computing the strength of a post-tensioned beam. Also included is a design example for a typical, 51.25-ft (15.62-m) span, four-beam composite bridge. Moments for Iowa Department of Transportation rating trucks, H 20 and HS 20 trucks, have been tabulated for design convenience and are included in the appendix.
Resumo:
The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.
Resumo:
Soils consist largely of mineral particles in a wide range of sizes. It is advantageous to assign names, such as "sand", etc., to describe particles which lie between certain size limits. These names are convenient to use and give more information than merely stating that the particles fit certain size limitations. Many systems of particle-size limits have been proposed and used, and have many discrepancies. For example, depending on the system used, a term such as "sand" may designate very different materials. Since no clear-cut divisions can be made between members of a continuous series all particle-size limit schemes are arbitrary. The originators of the various systems were influenced by many factors: convenience of investigation, methods and equipment available for analysis, ease of presenting data, convenience for statistical analysis, previous work, and systems in use. The complications were further compounded because of widely varying fields of endeavor with varying background, outlook, and goals. For example, many inconsistencies are found in engineering depending on whether the size limits are used to differentiate soils, or characterize aggregates for concrete. Some of the investigators have tried to place limits to correspond with the various properties of the soil components; others were more interested in the ease and convenience of obtaining and presenting data. The purpose of this paper is to review many of the systems which have been proposed and used, and if possible, to suggest what may have been the reasons for the selection of the particle-size limits.
Resumo:
The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.
Resumo:
This report contains an estimate of the cost of highway resurfacing necessitated by damage from studded tires. The total is $95,620,000 for the twenty-five years from 1971 to 1996. This total includes $51,937,000 to resurface pavements and bridges on Interstate routes and $43,683,000 for other Primary highways. The estimate for Interstate routes includes those sections now open to traffic and those planned for completion by November 1974. The estimate for other Primary routes includes rural and municipal sections open to traffic as of November 1970. The estimate was prepared by computing the cost of expected pavement and bridge resurfacing costs for the twenty-five year period assuming continued use of studded tires, then subtracting from this the expected resurfacing ) cost for the same period assuming that the use of' studded tires is prohibited. The total figure, $95,620,000, should be regarded as a conservative estimate of the cost which may be avoided by prohibiting the use of studded tires in Iowa. The conservative nature of the estimate may be demonstrated by the following examples of the guidelines used iri its preparation. 1. Only mainline pavements were included in the cost estimate for the Interstate routes. The connecting loops, exit ramps and entrance ramps at Interstate interchanges contain many additional miles of pavement subject to wear by studded tires. This pavement was omitted from the estimate because reliable ' information about the rate of pavement wear at such locations is not available. As a result, the Interstate resurfacing costs are underestimated. 2. Several other costs were also omitted from the estimate because of a lack of sufficient information. These include the cost of repairing damage caused by studded tires to city streets other than those designated as Primary routes, the damage to pavements and bridges on the more-heavily travelled Secondary roads, and the damage to pavement traffic markings on all highway systems. Experience indicates that portland cement concrete pavements in Iowa have a normal service life of twenty-five years before resurfacing becomes necessary. The service life for asphalt pavements is thirteen years. In making this cost estimate, the need for resurfacing was attributed to wear from studded tires only when the normal service life of the pavement was shortened by that wear. Consequently, this cost estimate does not account for the reduced safety and convenience to Iowa motorists during the time when pavement wear caused by studded tires is significant but less than the critical amount.
Resumo:
This report summarizes Iowa results of a five year, Pooled Fund study involving the Wisconsin, Iowa, and Minnesota Departments of Transportation (DOTs) designed to 1) assess the public's perceptions of the DOTs' pavement improvement strategies and 2) develop customer-based thresholds of satisfaction with pavements on rural two lane highways in each state as related to the DOTs' physical indices, such as pavement ride and condition. The primary objective was to seek systematic customer input to improve the DOTs' pavement improvement policies by 1) determining how drivers perceive the DOTs' pavements in terms of comfort and convenience but also in terms of other tradeoffs the DOTs had not previously considered, 2) determining relationships between perceptions and measured pavement condition thresholds (including a general level of tolerance of winter ride conditions in two of the states), and 3) identifying important attributes and issues that may not have been considered in the past. Secondary objectives were 1) to provide a tool for systematic customer input in the future and 2) to provide information which can help structure public information programs. A University of Wisconsin-Extension survey lab conducted the surveys under the direction of a multi-disciplinary team from Marquette University. Approximately 4500 drivers in the 3 states participated in the 3 phases of the project. Researchers conducted 6 focus groups in each state, approximately 400 statewide telephone interviews in each state and 700-800 targeted telephone interviews in each state. Approximately 400 winter ride interviews were conducted in Wisconsin and Minnesota. A summary of the method for each survey is included. In Phase I, focus groups were conducted with drivers to get an initial indication of what the driving public believes in regards to pavements and to frame issues for inclusion in the more representative statewide surveys of drivers conducted in Phase II. Phase II interviews gathered information about improvement policy tradeoff issues and about preliminary thresholds of improvement in terms of physical pavement indices. In Phase III, a two step recruitment and post-drive interview procedure yielded thresholds of ride and condition index summarized for each state. Results show that, in general, the driving public wants longer lasting pavements and are willing to pay for them. They want to minimize construction delay, improve entire sections of highway at one time but they dislike detours, and prefer construction under traffic even if it stretches out construction time. Satisfaction with pavements does not correlate directly to a high degree with physical pavement indices, but was found instead to be a complex, multi-faceted phenomenon. A psychological model was applied to explain satisfaction to a respectable degree for the social sciences. Results also indicate a high degree of trust in the 3 DOTs which is enhanced when the public is asked for input on specific highway segments. Conclusions and recommendations include a 3-step methodology for other state studies.