70 resultados para CONSENSUS DEVELOPMENT PROJECT
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.
Resumo:
Final report produced by DOT on development of manual crack quantification and automatic crack measurment system.
Resumo:
The research presented in this report provides the basis for the development of a new procedure to be used by the Iowa DOT and cities and counties in the state to deal with detours. Even though the project initially focused on investigating new tools to determine condition and compensation, the focus was shifted to traffic and the gas tax method to set the basis for the new procedure. It was concluded that the condition-based approach, even though accurate and consistent condition evaluations can be achieved, is not feasible or cost effective because of the current practices of data collection (two-year cycle) and also the logistics of the procedure (before and after determination). The gas tax method provides for a simple, easy to implement, and consistent approach to dealing with compensation for use of detours. It removes the subjectivity out of the current procedures and provides for a more realistic (traffic based) approach to the compensation determination.
Resumo:
Report on the Unemployment Insurance Tax Redesign Project administered by Iowa Workforce Development for the period July 1, 2002 through June 30, 2009
Resumo:
A laboratory study has been conducted with two aims in mind. The first goal was to develop a description of how a cutting edge scrapes ice from the road surface. The second goal was to investigate the extent, if any, to which serrated blades were better than un-serrated or "classical" blades at ice removal. The tests were conducted in the Ice Research Laboratory at the Iowa Institute of Hydraulic Research of the University of Iowa. A specialized testing machine, with a hydraulic ram capable of attaining scraping velocities of up to 30 m.p.h. was used in the testing. In order to determine the ice scraping process, the effects of scraping velocity, ice thickness, and blade geometry on the ice scraping forces were determined. Higher ice thickness lead to greater ice chipping (as opposed to pulverization at lower thicknesses) and thus lower loads. S~milabr ehavior was observed at higher velocities. The study of blade geometry included the effect of rake angle, clearance angle, and flat width. The latter were found to be particularly important in developing a clear picture of the scraping process. As clearance angle decreases and flat width increases, the scraping loads show a marked increase, due to the need to re-compress pulverized ice fragments. The effect of serrations was to decrease the scraping forces. However, for the coarsest serrated blades (with the widest teeth and gaps) the quantity of ice removed was significantly less than for a classical blade. Finer serrations appear to be able to match the ice removal of classical blades at lower scraping loads. Thus, one of the recommendations of this study is to examine the use of serrated blades in the field. Preliminary work (by Nixon and Potter, 1996) suggests such work will be fruitful. A second and perhaps more challenging result of the study is that chipping of ice is more preferable to pulverization of the ice. How such chipping can be forced to occur is at present an open question.
Resumo:
Supplementary cementitious materials (SCM) have become common parts of modern concrete practice. The blending of two or three cementitious materials to optimize durability, strength, or economics provides owners, engineers, materials suppliers, and contractors with substantial advantages over mixtures containing only portland cement. However, these advances in concrete technology and engineering have not always been adequately captured in specifications for concrete. Users need specific guidance to assist them in defining the performance requirements for a concrete application and the selection of optimal proportions of the cementitious materials needed to produce the required durable concrete. The fact that blended cements are currently available in many regions increases options for mixtures and thus can complicate the selection process. Both Portland and blended cements have already been optimized by the manufacturer to provide specific properties (such as setting time, shrinkage, and strength gain). The addition of SCMs (as binary, ternary, or even more complex mixtures) can alter these properties, and therefore has the potential to impact the overall performance and applications of concrete. This report is the final of a series of publications describing a project aimed at addressing effective use of ternary systems. The work was conducted in several stages and individual reports have been published at the end of each stage.
Resumo:
In August, 1994, the Office of Local Systems, Project Development Division, Iowa Department of Transportation established a Quality Improvement Team to review and improve upon the federal-aid project development process. The mission was to communicate federal-aid project development procedures to local agencies, beginning with the approval of the Statewide Transportation Improvement Program (STIP) and ending with obligation of federal funds by the Federal Highway Administration (FHWA). In January 1997, another Team (Make it Better) began meeting to clarify, update, and streamline the federal-aid project process. This Project Development Packet is a compilation of these efforts. The packet includes Project Development timelines, flow charts, guidelines, design criteria, Instructional Memorandums and forms to assist in the federal-aid project development process. The main (fold out) flow chart directs to other sections of the packet when appropriate.
Resumo:
This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to incorporate a greater focus on project management in their project development process. A technical advisory committee (TAC) was assembled to accomplish this effort. The TAC took into consideration the current status of project management with the Iowa DOT, their experience during the demonstration workshop held in Iowa as part of the implementation assistance they received, the project management peer exchange hosted by the Iowa DOT, and additional examples of project management that were presented. With this basis, the TAC participated in a number of discussions to develop draft guidance for the foundation of a Project Management Office (PMO) within the Iowa DOT. The final report describes the process that was used in establishing this guidance. The report details the decisions and decision process that the TAC employed in this endeavor and provides additional thoughts and insight into the draft guidance. Appendix A includes the draft guidance in the form of PMO function details and detailed lists of project management roles and responsibilities. Appendix B includes a starter list of project management resources for the PMO.
Resumo:
Several superstructure design methodologies have been developed for low volume road bridges by the Iowa State University Bridge Engineering Center. However, to date no standard abutment designs have been developed. Thus, there was a need to establish an easy to use design methodology in addition to generating generic abutment standards and other design aids for the more common substructure systems used in Iowa. The final report for this project consists of three volumes. The first volume (this volume) summarizes the research completed in this project. A survey of the Iowa County Engineers was conducted from which it was determined that while most counties use similar types of abutments, only 17 percent use some type of standard abutment designs or plans. A literature review revealed several possible alternative abutment systems for future use on low volume road bridges in addition to two separate substructure lateral load analysis methods. These consisted of a linear and a non-linear method. The linear analysis method was used for this project due to its relative simplicity and the relative accuracy of the maximum pile moment when compared to values obtained from the more complex non-linear analysis method. The resulting design methodology was developed for single span stub abutments supported on steel or timber piles with a bridge span length ranging from 20 to 90 ft and roadway widths of 24 and 30 ft. However, other roadway widths can be designed using the foundation design template provided. The backwall height is limited to a range of 6 to 12 ft, and the soil type is classified as cohesive or cohesionless. The design methodology was developed using the guidelines specified by the American Association of State Highway Transportation Officials Standard Specifications, the Iowa Department of Transportation Bridge Design Manual, and the National Design Specifications for Wood Construction. The second volume introduces and outlines the use of the various design aids developed for this project. Charts for determining dead and live gravity loads based on the roadway width, span length, and superstructure type are provided. A foundation design template was developed in which the engineer can check a substructure design by inputting basic bridge site information. Tables published by the Iowa Department of Transportation that provide values for estimating pile friction and end bearing for different combinations of soils and pile types are also included. Generic standard abutment plans were developed for which the engineer can provide necessary bridge site information in the spaces provided. These tools enable engineers to design and detail county bridge substructures more efficiently. The third volume provides two sets of calculations that demonstrate the application of the substructure design methodology developed in this project. These calculations also verify the accuracy of the foundation design template. The printouts from the foundation design template are provided at the end of each example. Also several tables provide various foundation details for a pre-cast double tee superstructure with different combinations of soil type, backwall height, and pile type.
Resumo:
Several superstructure design methodologies have been developed for low volume road bridges by the Iowa State University Bridge Engineering Center. However, to date no standard abutment designs have been developed. Thus, there was a need to establish an easy to use design methodology in addition to generating generic abutment standards and other design aids for the more common substructure systems used in Iowa. The final report for this project consists of three volumes. The first volume summarizes the research completed in this project. A survey of the Iowa County Engineers was conducted from which it was determined that while most counties use similar types of abutments, only 17 percent use some type of standard abutment designs or plans. A literature review revealed several possible alternative abutment systems for future use on low volume road bridges in addition to two separate substructure lateral load analysis methods. These consisted of a linear and a non-linear method. The linear analysis method was used for this project due to its relative simplicity and the relative accuracy of the maximum pile moment when compared to values obtained from the more complex non-linear analysis method. The resulting design methodology was developed for single span stub abutments supported on steel or timber piles with a bridge span length ranging from 20 to 90 ft and roadway widths of 24 and 30 ft. However, other roadway widths can be designed using the foundation design template provided. The backwall height is limited to a range of 6 to 12 ft, and the soil type is classified as cohesive or cohesionless. The design methodology was developed using the guidelines specified by the American Association of State Highway Transportation Officials Standard Specifications, the Iowa Department of Transportation Bridge Design Manual, and the National Design Specifications for Wood Construction. The second volume introduces and outlines the use of the various design aids developed for this project. Charts for determining dead and live gravity loads based on the roadway width, span length, and superstructure type are provided. A foundation design template was developed in which the engineer can check a substructure design by inputting basic bridge site information. Tables published by the Iowa Department of Transportation that provide values for estimating pile friction and end bearing for different combinations of soils and pile types are also included. Generic standard abutment plans were developed for which the engineer can provide necessary bridge site information in the spaces provided. These tools enable engineers to design and detail county bridge substructures more efficiently. The third volume (this volume) provides two sets of calculations that demonstrate the application of the substructure design methodology developed in this project. These calculations also verify the accuracy of the foundation design template. The printouts from the foundation design template are provided at the end of each example. Also several tables provide various foundation details for a pre-cast double tee superstructure with different combinations of soil type, backwall height, and pile type.
Resumo:
Several superstructure design methodologies have been developed for low volume road bridges by the Iowa State University Bridge Engineering Center. However, to date no standard abutment designs have been developed. Thus, there was a need to establish an easy to use design methodology in addition to generating generic abutment standards and other design aids for the more common substructure systems used in Iowa. The final report for this project consists of three volumes. The first volume summarizes the research completed in this project. A survey of the Iowa County Engineers was conducted from which it was determined that while most counties use similar types of abutments, only 17 percent use some type of standard abutment designs or plans. A literature review revealed several possible alternative abutment systems for future use on low volume road bridges in addition to two separate substructure lateral load analysis methods. These consisted of a linear and a non-linear method. The linear analysis method was used for this project due to its relative simplicity and the relative accuracy of the maximum pile moment when compared to values obtained from the more complex non-linear analysis method. The resulting design methodology was developed for single span stub abutments supported on steel or timber piles with a bridge span length ranging from 20 to 90 ft and roadway widths of 24 and 30 ft. However, other roadway widths can be designed using the foundation design template provided. The backwall height is limited to a range of 6 to 12 ft, and the soil type is classified as cohesive or cohesionless. The design methodology was developed using the guidelines specified by the American Association of State Highway Transportation Officials Standard Specifications, the Iowa Department of Transportation Bridge Design Manual, and the National Design Specifications for Wood Construction. The second volume (this volume) introduces and outlines the use of the various design aids developed for this project. Charts for determining dead and live gravity loads based on the roadway width, span length, and superstructure type are provided. A foundation design template was developed in which the engineer can check a substructure design by inputting basic bridge site information. Tables published by the Iowa Department of Transportation that provide values for estimating pile friction and end bearing for different combinations of soils and pile types are also included. Generic standard abutment plans were developed for which the engineer can provide necessary bridge site information in the spaces provided. These tools enable engineers to design and detail county bridge substructures more efficiently. The third volume provides two sets of calculations that demonstrate the application of the substructure design methodology developed in this project. These calculations also verify the accuracy of the foundation design template. The printouts from the foundation design template are provided at the end of each example. Also several tables provide various foundation details for a pre-cast double tee superstructure with different combinations of soil type, backwall height, and pile type.
Resumo:
Pozzolans and slag extend the market for concrete products by improving specific properties of the products, which allows the products to be constructed with materials or placed in environments that would have precluded the use of portland cement alone. In properly formulated concrete mixes, pozzolans and slag have been shown to enhance long-term strength, decrease permeability, increase durability, reduce thermal cracking of mass concrete, minimize or eliminate cracking related to alkali-silica reaction (ASR), and minimize or eliminate cracking related to sulfate attack. The purpose of this research project was to conduct a scoping study that could be used to evaluate the need for additional research in the area of supplementary cementitious materials (SCMs) that are used in concrete for highway applications. Special emphasis was given to the concept of using two or more SCMs in a single concrete mixture. The scope of the study was limited to a literature survey and panel discussions concerning issues relevant to the project. No laboratory work was conducted for this project. A problem statement with research plan was created that could be used to guide a pooled fund project.
Resumo:
Governor Vilsack and Lt. Governor Pederson are encouraging the development of a strategic community plan to encourage a smooth transition for bringing skilled workers and their families to Iowa from other countries. Skilled workers from other countries can provide a valuable resource to Iowa employers and can add cultural richness and diversity to Iowa's communities. New Iowans can help Iowa's communities, businesses, and economy grow
Resumo:
Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.
Resumo:
Traffic volume increases and an aging infrastructure create the need for reconstruction, rehabilitation, and maintenance of existing facilities. As more motorists feel that delays should be minimal during highway renewal projects, lane closures that reduce capacity through the work zone should not create unreasonable delays. In order to facilitate the determination of when a lane closure is permitted during the day, some state transportation agencies (STAs) have developed lane closure policies, or strategies, that they use as guidance in determining daily permitted lane closure times. Permitted lane closure times define what times of the day, week, or season a lane closure is allowed on a facility and at a specific location or segment. This research addresses the lane closure policies of several STAs that were reputed to have good lane closures policies or strategies and that were selected by the project advisory committee for further research.