11 resultados para CLEAR amide resin
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
At one time, Clear Creek lived up to its name. Originally set among the prairie and oak savannah of the Iowa River valley, legend has it that early settler and Johnson County sheriff Samuel Trowbridge gave the creek its name because of its pristine waters. However, the stream’s natural protections began to weaken as more settlers moved into Iowa. Over time, the prairie disappeared, livestock trampled streambanks, the creek was dredged and straightened, wetlands were drained and urban areas began to take their toll.
Resumo:
This monthly report from the Iowa Department of Natural Resources is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
In urban communities, there are often limited amounts of right-of-way available for establishing a large setback distance from the curb for fixed objects. Urban communities must constantly weigh the cost of purchasing additional right-of-way for clear zones against the risk of fixed object crashes. From 2004 to 2006, this type of crash on curbed roads represented 15% of all fatal crashes and 3% of all crashes in the state of Iowa. Many states have kept the current minimum AASHTO recommendations as their minimum clear zone standards; however, other states have decided that these recommendations are insufficient and have increased the required minimum clear zone distance to better suit the judgment of local designers. This report presents research on the effects of the clear zone on urban curbed streets. The research was conducted in two phases. The first phase involved a synthesis of practice that included a literature review and a survey of practices in jurisdictions that have developmental and historical patterns similar to those of Iowa. The second phase involved investigating the benefits of a 10 ft clear zone, which included examining urban corridors in Iowa that meet or do not meet the 10 ft clear zone goal. The results of this study indicate that a consistent fixed object offset results in a reduction in the number of fixed object crashes, a 5 ft clear zone is most effective when the goal is to minimize the number of fixed object c ashes, and a 3 ft clear zone is most effective when the goal is to minimize the cost of fixed object crashes.
Resumo:
Research funds were approved for the purchase of equipment designed to proportion and inject epoxy resins into delaminated areas of bridge decks. Through investigation and refining of this process, it was anticipated that a maintenance procedure would be developed to delay spalling of bridge decks by "gluing down" delaminated areas before spalling occurred.
Resumo:
This document reflects the ability of private and public sectors in Iowa working together for the benefit of the entire state. It showcases Iowa's assets towards businesses and assists them in evaluating locations in Iowa.
Resumo:
The current study was initiated to quantify the stresses induced in critical details on the reinforcing jacket and the tower itself through the use of field instrumentation, load testing, and long-term monitoring. Strain gages were installed on the both the tower and the reinforcing jacket. Additional strain gages were installed on two anchor rods. Tests were conducted with and without the reinforcing jacket installed. Data were collected from all strain gages during static load testing and were used to study the stress distribution of the tower caused by known loads, both with and without the reinforcing jacket. The tower was tested dynamically by first applying a static load, and then quickly releasing the load causing the tower to vibrate freely. Furthermore, the tower was monitored over a period of over 1 year to obtain stress range histograms at the critical details to be used for a fatigue evaluation. Also during the long-term monitoring, triggered time-history data were recorded to study the wind loading phenomena that excite the tower.
Resumo:
Little Clear Lake is a 162 acre natural lake located in the western part of Pocahontas County. The lake has a 375 acre watershed that is gently rolling with nearly 84% of the watershed in row crop production. The lake is listed on the Iowa DNR’s impaired waters list due to nutrients, siltation and exotic species (purple loosestrife). These impairments have been verified with in-lake monitoring and landowner conversations as well as watershed modeling. The watershed models estimates that the average sheet and rill erosion is 1.74 tons/acre/year and sediment delivery is .12 tons/acre/year with a total of 44 tons/year being delivered to Little Clear Lake. The goal of the Little Clear Lake Watershed Protection Plan is to (1) reduce sediment delivery to Little Clear Lake by 60%, or 26.5 tons annually, by installing best management practices within the watershed. Doing this will control nearly 100% of the of the lake’s drainage area; and (2) initiate an information and education campaign for residents within the Little Clear Lake watershed which will ultimately prepare the residents and landowners for future project implementation. In an effort to control sediment and nutrient loading the Little Clear Lake Watershed Protection Plan has included 3 sediment catch basin sites and 5 grade stabilization structures, which function to stabilize concentrated flow areas.
Resumo:
Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.
Resumo:
The Iowa County Soil and Water Conservation District is applying on behalf of the unincorporated community of Conroy to construct a wastewater collection and treatment system to assist in the cleanup and protection of the Clear Creek Watershed. Conroy sits at the headwaters of Clear Creek. Monitoring of the watershed has shown consistently high levels of E.coli bacteria and chloride near the upper end of the creek. In addition, toilet paper and fecal material have been observed on numerous occasions. These are obvious health threats to the residents of the watershed. The monitoring of the watershed, coupled with lab analysis, suggest septic inputs are negatively impacting the headwaters of Clear Creek. A new sewer system for the community of Conroy will eliminate illegal discharges into the creek and be the first step in the overall protection of the watershed and the water quality therein.
Resumo:
Clear Lake, Iowa's third largest natural lake, is located in Cerro Gordo County in north-central Iowa. The lake is a premier natural resource and popular recreational destination in north central Iowa, providing more than $40 million dollars annually to the local economy. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full recreational potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. There are over 68 storm water outlet points in the Clear Lake watershed that allow untreated urban runoff to empty directly into Clear Lake. Local governments have been very active in installing storm water Best Management Practices (BMPs) at as many of the outlets that current funding allows. To date, 11 of the 68 sites (16%) have been protected. These improvements have been very effective in reducing contaminants in the storm water runoff, but the remaining outlets still need protection. The first phase of this grant request is for an investigation of 10 storm water outlet sites to determine the most cost effective BMP for each site. The second phase of the grant request is to implement the BMPs deemed most cost effective at 5 of the 10 sites investigated. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.
Resumo:
Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's Draft 2010 303(d) Impaired Waters List for algae, bacteria, and turbidity. Many restoration practices have been implemented to treat the algae and turbidity impairment, but few practices have been installed to treat bacteria. Reducing beach bacteria levels is a priority of the lake restoration partners. Federal, State, and local partners have invested more than $20 million in lake and watershed restoration efforts to improve water clarity and quality. These partners have a strong desire to ensure high bacteria levels at public swim beaches do not undermine the other water quality improvements. Recent bacteria source tracking completed by the State Hygienic Laboratory indicates that Canada Geese are a major contributor of bacteria loading to the Clear Lake swim beaches. Other potential sources include unpermitted septic systems in the watershed. The grant request proposes to reduce bacteria levels at Clear Lake's three public swim beaches by utilizing beach cleaner machines to remove goose waste, installing goose deterrents at the swim beaches, and continuing a septic system update grant program. These practices began to be implemented in 2011 and recent bacteria samples in 2012 are showing they can be effective if the effort is continued.