19 resultados para CIRCUMSTANCES
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
America’s roadways are in serious need of repair. According to the American Society of Civil Engineers (ASCE), one-third of the nation’s roads are in poor or mediocre condition. ASCE has estimated that under these circumstances American drivers will sacrifice $5.8 billion and as many as 13,800 fatalities a year from 1999 to 2001 ( 1). A large factor in the deterioration of these roads is a result of how well the steel reinforcement transfers loads across the concrete slabs. Fabricating this reinforcement using a shape conducive to transferring these loads will help to aid in minimizing roadway damage. Load transfer within a series of concrete slabs takes place across the joints. For a typical concrete paved road, these joints are approximately 1/8-inch gaps between two adjacent slabs. Dowel bars are located at these joints and used to transfer load from one slab to its adjacent slabs. As long as the dowel bar is completely surrounded by concrete no problems will occur. However, when the hole starts to oblong a void space is created and difficulties can arise. This void space is formed due to a stress concentration where the dowel contacts the concrete. Over time, the repeated process of traffic traveling over the joint crushes the concrete surrounding the dowel bar and causes a void in the concrete. This void inhibits the dowel’s ability to effectively transfer load across the joint. Furthermore, this void gives water and other particles a place to collect that will eventually corrode and potentially bind or lock the joint so that no thermal expansion is allowed. Once there is no longer load transferred across the joint, the load is transferred to the foundation and differential settlement of the adjacent slabs will occur.
Resumo:
Stability berms are commonly constructed where roadway embankments cross soft or unstable ground conditions. Under certain circumstances, the construction of stability berms cause unfavorable environmental impacts, either directly or indirectly, through their effect on wetlands, endangered species habitat, stream channelization, longer culvert lengths, larger right-of-way purchases, and construction access limits. Due to an ever more restrictive regulatory environment, these impacts are problematic. The result is the loss of valuable natural resources to the public, lengthy permitting review processes for the department of transportation and permitting agencies, and the additional expenditures of time and money for all parties. The purpose of this project was to review existing stability berm alternatives for potential use in environmentally sensitive areas. The project also evaluates how stabilization technologies are made feasible, desirable, and cost-effective for transportation projects and determines which alternatives afford practical solutions for avoiding and minimizing impacts to environmentally sensitive areas. An online survey of engineers at state departments of transportation was also conducted to assess the frequency and cost effectiveness of the various stabilization technologies. Geotechnical engineers that responded to the survey overwhelmingly use geosynthetic reinforcement as a suitable and cost-effective solution for stabilizing embankments and cut slopes. Alternatively, chemical stabilization and installation of lime/cement columns is rarely a remediation measure employed by state departments of transportation.
Resumo:
Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.
Resumo:
America’s roadways are in serious need of repair. According to the American Society of Civil Engineers (ASCE), one-third of the nation’s roads are in poor or mediocre condition (1). ASCE has estimated that under these circumstances American drivers will sacrifice $5.8 billion and as many as 13,800 fatalities a year from 1999 to 2001 ( 1). A large factor in the deterioration of these roads is a result of how well the steel reinforcement transfers loads across the concrete slabs. Fabricating this reinforcement using a shape conducive to transferring these loads will help to aid in minimizing roadway damage. Load transfer within a series of concrete slabs takes place across the joints. For a typical concrete paved road, these joints are approximately 1/8-inch gaps between two adjacent slabs. Dowel bars are located at these joints and used to transfer load from one slab to its adjacent slabs. As long as the dowel bar is completely surrounded by concrete no problems will occur. However, when the hole starts to oblong a void space is created and difficulties can arise. This void space is formed due to a stress concentration where the dowel contacts the concrete. Over time, the repeated process of traffic traveling over the joint crushes the concrete surrounding the dowel bar and causes a void in the concrete. This void inhibits the dowel’s ability to effectively transfer load across the joint. Furthermore, this void gives water and other particles a place to collect that will eventually corrode and potentially bind or lock the joint so that no thermal expansion is allowed. Once there is no longer load transferred across the joint, the load is transferred to the foundation and differential settlement of the adjacent slabs will occur.
Resumo:
This paper examines the incentive of atomistic agricultural producers within a specific geographical region to differentiate and collectively market products. We develop a model that allows us to analyze the market and welfare effects of the main types of real-world producer organizations, using it to derive economic insights regarding the circumstances under which these organizations will evolve, and describing implications of the results obtained in the context of an ongoing debate between the European Union and United States. As the anticipated fixed costs of development and marketing increase and the anticipated size of the market falls, it becomes essential to increase the ability of the producer organization to control supply in order to ensure the coverage of fixed costs. Whenever a collective organization allows a market (with a new product) to exist that otherwise would not have existed there is an increase in societal welfare. Counterintuitively, stronger property right protection for producer organizations may be welfare enhancing even after a differentiated product has been developed. The reason for this somewhat paradoxical result is that legislation aimed at curtailing the market power of producer organizations may induce large technological distortions.
Resumo:
Transportation is an important health care issue. The majority of the population here in Iowa have ready access and typically use private automobiles to access health care and other community services. There is also a significant segment of the population that either does not have access to a personal automobile or is not currently capable of driving. This can potentially limit their access to health care, but it has greater health implications because it can also limit access to nutrition and other community services, as well as involvement in social activities. For people unable to drive themselves, the alternatives generally include reliance on family, friends, volunteer groups, and public transit. Many choose transit because it gives them a degree of independence. Public transit is often used to supplement other options even when they are available. It becomes critical in circumstances where the other options don’t exist. In many cases there may be no family available or they may not always be able to get off work when travel needs arise during the workday. Friends may be in similar circumstances and volunteer groups may be either unavailable or overwhelmed. The fact that many patients depend on public transit to get to and from health care appointments makes it beneficial for health care professionals to get to know more about public transit and how it operates here in Iowa.
Resumo:
How people choose to live depends on a variety of social and economic circumstances. Single family dwellings, extended family compounds, and communal apartment blocks are all forms of residential architecture that have ancient roots and occur in every culture. Each form both reflects and affects the living styles of the people who reside there. The double house, which shelters two families in units separated by a wall or floor, balances the convenience of an apartment with the psychological comforts of a home. During the mid to late nineteenth and early twentieth centuries in the United States, the double house was hugely popular in some cities, such as Minneapolis and Milwaukee, but only a minimal presence in Des Moines
Resumo:
Public Works is pleased to present the following Iowa Efficiency Review Report to Governor Chet Culver and Lieutenant Governor Patty Judge. This report is the product of a collaboration between our consulting team and very dedicated Iowa state employees who worked with us to share ideas and cost‐saving proposals under very difficult circumstances caused by the national financial crisis that is affecting state budgets throughout the country. For example, during the course of this review, Iowa departments were also asked to develop across‐the‐board cuts to achieve immediate reductions in state spending. It is a credit to Iowa state government that departmental staff continued to work on this Efficiency Review Report despite these challenges of also having to develop across‐the‐board budget cuts to achieve a balanced budget. We hope that these ideas will set the stage for further future budget improvements from achieving efficiencies, eliminating outdated practices, increasing the use of information technology solutions and finding new sources of non‐tax funding. The Efficiency Review Team faced a second challenge. Statewide Efficiency Reviews usually take from nine to 12 months to complete. In Iowa, we worked with dedicated department staff to complete our work in less than 4 months. The Governor challenged all of us to work intensely and to give him our best thinking on efficiency proposals so that he could act as quickly as possible to position state government for success over the next several years.
Resumo:
This booklet is designed to assist those who have been appointed as an attorney-in-fact, those who are considering the need for a power of attorney, or those who have an interest in the subject. This is a general overview of the laws governing powers of attorney and, like most general overviews it will apply in most situations, but not all. Small differences and individual circumstances can be very important in resolving legal problems and the general guidance provided by this booklet cannot take such differences into account. Keep in mind that the laws continually change and information in this booklet is not designed to take the place of legal counsel.
Resumo:
One of the challenges that faces the winter maintainer is how much chemical to apply to the road under given conditions. Insufficient chemical can lead to the road surface becoming slick, and the road thus becoming unsafe. In all likelihood, additional applications will have to be made, requiring additional effort and use of resources. However, too much chemical can also be bad. While an excess of chemical will ensure (in most circumstances) that a safe road condition is achieved, it may also result in a substantial waste of chemical (with associated costs for this waste) and in ancillary damage to the road itself and to the surrounding environment. Ideally, one should apply what might be termed the “goldilocks” amount of chemical to the road: Not too much, and not too little, but just right. Of course the reality of winter maintenance makes achieving the “goldilocks” application rate somewhat of a fairy tale. In the midst of a severe storm, when conditions are poor and getting worse, the last thing on a plow operator’s mind is a minute adjustment in the amount of chemical being applied to the road. However, there may be considerable benefit and substantial savings to be achieved if chemical applications can be optimized to some degree, so that wastage is minimized without compromising safety. The goal of this study was to begin to develop such information through a series of laboratory studies in which the force needed to scrape ice from concrete blocks was measured, under a variety of chemical application conditions.
Resumo:
Underbody plows can be very useful tools in winter maintenance, especially when compacted snow or hard ice must be removed from the roadway. By the application of significant down-force, and the use of an appropriate cutting edge angle, compacted snow and ice can be removed very effectively by such plows, with much greater efficiency than any other tool under those circumstances. However, the successful operation of an underbody plow requires considerable skill. If too little down pressure is applied to the plow, then it will not cut the ice or compacted snow. However, if too much force is applied, then either the cutting edge may gouge the road surface, causing significant damage often to both the road surface and the plow, or the plow may ride up on the cutting edge so that it is no longer controllable by the operator. Spinning of the truck in such situations is easily accomplished. Further, excessive down force will result in rapid wear of the cutting edge. Given this need for a high level of operator skill, the operation of an underbody plow is a candidate for automation. In order to successfully automate the operation of an underbody plow, a control system must be developed that follows a set of rules that represent appropriate operation of such a plow. These rules have been developed, based upon earlier work in which operational underbody plows were instrumented to determine the loading upon them (both vertical and horizontal) and the angle at which the blade was operating.These rules have been successfully coded into two different computer programs, both using the MatLab® software. In the first program, various load and angle inputs are analyzed to determine when, whether, and how they violate the rules of operation. This program is essentially deterministic in nature. In the second program, the Simulink® package in the MatLab® software system was used to implement these rules using fuzzy logic. Fuzzy logic essentially replaces a fixed and constant rule with one that varies in such a way as to improve operational control. The development of the fuzzy logic in this simulation was achieved simply by using appropriate routines in the computer software, rather than being developed directly. The results of the computer testing and simulation indicate that a fully automated, computer controlled underbody plow is indeed possible. The issue of whether the next steps toward full automation should be taken (and by whom) has also been considered, and the possibility of some sort of joint venture between a Department of Transportation and a vendor has been suggested.
Resumo:
We received a complaint in late September 2011 that an Earlham School District employee had borrowed a school vehicle for her personal use for one month, with the Superintendent’s permission. The school board had discussed the circumstances of the borrowed district vehicle in closed session. The complainant believed this was contrary to Iowa law and also believed no action had been taken against the school employee who borrowed the vehicle or the superintendent who allowed the personal use of the vehicle. He was aware the school district’s attorney reviewed the matter and determined the employee and superintendent violated no law or district policies. Since the school board discussed the matter only in closed session, it was unknown what, if any, discipline was taken against the employees and whether such actions were condoned by the district. We agreed to investigate to determine if the actions of school officials or employees violated Iowa law and if the response from the school board was appropriate.
Resumo:
The twenty-first century Iowa State Capitol contains state-of-the-art fire protection. Sprinklers and smoke detectors are located in every room and all public hallways are equipped with nearby hydrants. The Des Moines Fire Department is able to fight fires at nearly any height. However, on Monday morning, January 4, 1904, the circumstances were much different. By the beginning of 1904, the Capitol Improvement Commission had been working in the Capitol for about two years. The commissioners were in charge of decorating the public areas of the building, installing the artwork in the public areas, installing a new copper roof, re-gilding the dome, replacing windows, and connecting electrical lines throughout. Electrician H. Frazer had been working that morning in Committee Room Number Five behind the House Chamber, drilling into the walls to run electrical wires and using a candle to light his way. The investigating committee determined that Frazer had left his work area and had neglected to extinguish his candle. The initial fire alarm sounded at approximately 10 a.m. Many citizen volunteers came to help the fire department. Capitol employees and state officials also assisted in fighting the fire, including Governor Albert Cummins. The fire was finally brought under control around 6 p.m., although some newspaper accounts at the time reported that the fire continued smoldering for several days. Crampton Linley was the engineer working with the Capitol Improvement Commission. He was in the building at the time of the fire and was credited with saving the building. Linley crawled through attic areas to close doors separating wings of the Capitol, an action which smothered the flames and brought the fire under control. Sadly, Linley did not live long enough to be recognized for his heroism. The day after the fire, while examining the damage, Linley fell through the ceiling of the House Chamber and died instantly from severe head injuries. The flames had burned through the ceiling and caused much of it to collapse to the floor below, while the lower areas of the building had been damaged by smoke and water. Elmer Garnsey was the artist hired by the Capitol Improvement Commission to decorate the public areas of the building. Therefore, he seemed the logical candidate to be given the additional responsibility of redecorating the areas damaged by the fire. Garnsey had a very different vision for the decoration, which is why the House Chamber, the old Supreme Court Room, and the old Agriculture offices directly below the House Chamber have a design that is very different from the areas of the building untouched by the fire.
Resumo:
In the last decade, Intelligent Transportation Systems (ITS) have increasingly been deployed in work zones by state departments of transportation. Also known as smart work zone systems they improve traffic operations and safety by providing real-time information to travelers, monitoring traffic conditions, and managing incidents. Although there have been numerous ITS deployments in work zones, a framework for evaluating the effectiveness of these deployments does not exist. To justify the continued development and implementation of smart work zone systems, this study developed a framework to determine ITS effectiveness for specific work zone projects. The framework recommends using one or more of five performance measures: diversion rate, delay time, queue length, crash frequency, and speed. The monetary benefits and costs of ITS deployment in a work zone can then be computed using the performance measure values. Such ITS computations include additional considerations that are typically not present in standard benefit-cost computations. The proposed framework will allow for consistency in performance measures across different ITS studies thus allowing for comparisons across studies or for meta analysis. In addition, guidance on the circumstances under which ITS deployment is recommended for a work zone is provided. The framework was illustrated using two case studies: one urban work zone on I-70 and one rural work zone on I-44, in Missouri. The goals of the two ITS deployments were different – the I-70 ITS deployment was targeted at improving mobility whereas the I-44 deployment was targeted at improving safety. For the I-70 site, only permanent ITS equipment that was already in place was used for the project and no temporary ITS equipment was deployed. The permanent DMS equipment serves multiple purposes, and it is arguable whether that cost should be attributed to the work zone project. The data collection effort for the I-70 site was very significant as portable surveillance captured the actual diversion flows to alternative routes. The benefit-cost ratio for the I-70 site was 2.1 to 1 if adjusted equipment costs were included and 6.9 to 1 without equipment costs. The safety-focused I-44 ITS deployment had an estimated benefit-cost ratio of 3.2 to 1.
Resumo:
Iowa's county road system serves many critical functions in a changing environment. Many counties with very different social, economic, and demographic circumstances do not have adequate resources to provide the desired level of service on their secondary road systems. How the state's Road Use Tax Fund (RUTF) is distributed among counties is therefore of great importance. This report presents the results of a year-long study of how to distribute RUTF resources among Iowa's 99 counties. The project was undertaken at the request of county engineers who wish to replace the current method of allocation with one that is more stable, comprehensible, and predictable. This report describes the current allocation method, examines how other states distribute road funds to counties, and discusses potential allocation factors that could be included in a revised procedure. The process undertaken to narrow the range of possible formulas and determine the one to recommend is summarized. Finally, the report presents the allocation formula recommended by the project advisory committee, along with how it would operate.