Four Iowa DOT asphalt concrete pavement crack sealing projects were selected to evaluate the benefits of heat lance crack preparation. Two, one-half mile sections, both with and without heat lance preparation, were constructed in Story, Monroe, Clinton and Wayne Counties in 1991 and 1992. They were visually evaluated annually from 1992 through 1996. The heat lance preparation did not yield improved seal performance or extended longevity. There was no perceivable difference between crack sealing with and without heat lance preparation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This manual summarizes the roadside tree and brush control methods used by all of Iowa's 99 counties. It is based on interviews conducted in Spring 2002 with county engineers, roadside managers and others. The target audience of this manual is the novice county engineer or roadside manager. Iowa law is nearly silent on roadside tree and brush control, so individual counties have been left to decide on the level of control they want to achieve and maintain. Different solutions have been developed but the goal of every county remains the same: to provide safe roads for the traveling public. Counties in eastern and southern Iowa appear to face the greatest brush control challenge. Most control efforts can be divided into two categories: mechanical and chemical. Mechanical control includes cutting tools and supporting equipment. A chain saw is the most widely used cutting tool. Tractor mounted boom mowers and brush cutters are used to prune miles of brush but have significant safety and aesthetic limitations and boom mowers are easily broken by inexperienced operators. The advent of tree shears and hydraulic thumbs offer unprecedented versatility. Bulldozers are often considered a method of last resort since they reduce large areas to bare ground. Any chipper that violently grabs brush should not be used. Chemical control is the application of herbicide to different parts of a plant: foliar spray is applied to leaves; basal bark spray is applied to the tree trunk; a cut stump treatment is applied to the cambium ring of a cut surface. There is reluctance by many to apply herbicide into the air due to drift concerns. One-third of Iowa counties do not use foliar spray. By contrast, several accepted control methods are directed toward the ground. Freshly cut stumps should be treated to prevent resprouting. Basal bark spray is highly effective in sensitive areas such as near houses. Interest in chemical control is slowly increasing as herbicides and application methods are refined. Fall burning, a third, distinctly separate technique is underused as a brush control method and can be effective if timed correctly. In all, control methods tend to reflect agricultural patterns in a county. The use of chain saws and foliar sprays tends to increase in counties where row crops predominate, and boom mowing tends to increase in counties where grassland predominates. For counties with light to moderate roadside brush, rotational maintenance is the key to effective control. The most comprehensive approach to control is to implement an integrated roadside vegetation management (IRVM) program. An IRVM program is usually directed by a Roadside Manager whose duties may be shared with another position. Funding for control programs comes from the Rural Services Basic portion of a county's budget. The average annual county brush control budget is about $76,000. That figure is thought not to include shared expenses such as fuel and buildings. Start up costs for an IRVM program are less if an existing control program is converted. In addition, IRVM budgets from three different northeastern Iowa counties are offered for comparison in this manual. The manual also includes a chapter on temporary traffic control in rural work zones, a summary of the Iowa Code as it relates to brush control, and rules on avoiding seasonal disturbance of the endangered Indiana bat. Appendices summarize survey and forest cover data, an equipment inventory, sample forms for record keeping, a sample brush control policy, a few legal opinions, a literature search, and a glossary.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Two objectives were involved in this recycling project: To determine if the asphalt concrete surfacing from an existing roadway could be removed, the existing portland cement concrete pavement broken, removed, crushed to 1-1/2 inch minus, proportioned through a conventional central mix proportioning plant with the addition of concrete sand, and placed with a conventional slipform paver; and to determine if a two course, composite pavement, each course of different mix proportions, could be placed monolithically with conventional slipform equipment after being proportioned and mixed in a conventional central mix plant. The project was completed with no major problem. The objectives were satisfactorily met. The project was a success to the degree that the Iowa D.O.T. is proceeding with at least two projects for the 1977 construction season that will utilize the old pavement as appregate for the new pavement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report provides details of IADOT's experience removing and crushing asphaltic concrete and portland cement concrete for recycling. The recycled material was used on interstate highways for the subbase and shoulders. The major problem IADOT encountered on this project was the removal of reinforcing steel from the broken concrete. The contractor used hydraulic powered shears to clip off all protruding steel during the removal and loading of the concrete on the grade. This project took place in 1977.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The interrelation of curing time, curing temperature, strength, and reactions in lime-bentonite-water mixtures was examined. Samples were molded at constant density and moisture content and then cured for periods of from 1 to 56 days at constant temperatures that ranged from 5C to 60C. After the appropriate curing time the samples were tested for unconfined compressive strength. The broken samples were then analyzed by x-ray diffractometer and spectrophotometer to determine the identity of the reaction products present after each curing period. It was found that the strength gain of lime-clay mixtures cured at different temperatures is due to different phases of the complex reaction, lime & clay to CSH(gel) to CSH(II) to CSH(I) to tobermorite. The farther the reaction proceeds, the higher the strength. There was also evidence of lattice substitutions in the structure of the calcium silicate hydrates at curing temperatures of 50C and higher. No consistent relationship between time, temperature, strength, and the S/A ration of reaction products existed, but in order to achieve high strengths the apparent C/S ration had to be less than two. The curing temperature had an effect on the strength developed by a given amount of reacted silica in the cured lime-clay mixture, but at a given curing temperature the cured sample that had the largest amount of reacted silica gave the highest strength. Evidence was found to indicate that during the clay reaction some calcium is indeed adsorbed onto the clay structure rather than entering into a pozzolanic reaction. Finally, it was determined that it is possible to determine the amount of silica and alumina in lime-clay reaction products by spectrophotometric analysis with sufficient accuracy for comparison purposes. The spectrophotometric analysis techniques used during the investigation were simple and were not time consuming.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Effective winter maintenance makes use of freezing-point-depressant chemicals (also known as ice-control products) to prevent the formation of the bond between snow and ice and the highway pavement. In performing such winter maintenance, the selection of appropriate ice-control products for the bond prevention task involves consideration of a number of factors, as indicated in Nixon and Williams (2001). The factors are in essence performance measurements of the ice-control products, and as such can be easily incorporated into a specification document to allow for selection of the best ice-control products for a given agency to use in its winter maintenance activities. Once performance measures for de-icing or anti-icing chemicals have been specified, this allows the creation of a quality control program for the acceptance of those chemicals. This study presents a series of performance measurement tests for ice-control products, and discusses the role that they can play in such a quality control program. Some tests are simple and rapid enough that they can be performed on every load of icecontrol products received, while for others, a sampling technique must be used. An appropriate sampling technique is presented. Further, each test is categorized as to whether it should be applied to every load of ice-control products or on a sampling basis. The study includes a detailed literature review that considers the performance of ice-control products in three areas: temperature related performance, product consistency, and negative side effects. The negative side effects are further broken down into three areas, namely operational side effects (such as chemical slipperiness), environmental side effects, and infrastructural side effects (such as corrosion of vehicles and damage to concrete). The review indicated that in the area of side effects the field performance of ice-control products is currently so difficult to model in the laboratory that no particular specification tests can be recommended at this time. A study of the impact of ice-control products on concrete was performed by Professor Wang of Iowa State University as a sub-contract to this study, and has been presented to the Iowa Highway Research Board prior to this report.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A targeted approach is being used in the Iowa Great Lakes Watershed with a keystone project featured within this project application in the heavily urbanized Center Lake Watershed. As identified in the Iowa Great Lakes Watershed Management Plan, urban runoff is the only remaining watershed concern in the Center Lake Watershed as the map in the attachments clearly shows. Fully one third of the watershed concerns of Center Lake will be treated through the installation of 7 keystone urban practices and will remove 63 pounds of phosphorous from entering the lake annually. Due to the interconnectedness of the Iowa Great Lakes (IGL), the watershed has been broken down into sub units called Resource Management Areas (RMA's) for priority practice implementation. This project will mesh with the existing Iowa Great Lakes Watershed Management Plan by reducing pollutant loads from the highest priority RMA's which are resulting in impaired water bodies. The majority of the funding needed for the specific practices specified in this proposal has already been secured through the Iowa DNR Section 319 and Lake Restoration Programs, The Water Quality Commission and the City of Spirit Lake. This funding request will simply bring the overall cost of these keystone practices into the range of affordability for the committed funders and the City of Spirit Lake

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Data tables describing the length and vehicle-miles of travel on Iowa's 1975 proposed interstate system, broken down by interstate. No text is available.