2 resultados para Blackboard drawing.
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
With the rapid growth in China’s dairy industry, a number of recent papers have addressed either the supply or the demand trends for dairy products in China. None, however, presents a systematic explanation for the recent growth in both the supply and demand for dairy products. The goal of this paper is to sketch a more comprehensive picture of China’s dairy sector and to assess the nature of the sector’s development in the coming decades. Drawing upon several empirical studies, we examine the trends in dairy product consumption to create a composite picture of the factors underlying the recent growth. We also empirically investigate the sources of production gains in milk supply and assess the relative importance of expanding herd size, changes in the nature of production, technological change, and improvements in efficiency to the overall growth of milk production.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.