21 resultados para Azuki -- Handling.

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Investigative report produced by Iowa Citizens' Aide/Ombudsman

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This booklet has been prepared by the Division of Workers’ Compensation to provide information and guidelines in handling Iowa workers’ compensation claims. For more detailed information, reference should be made to Iowa Code chapters 85 through 87, 17A and chapter 876 of the Iowa Administrative Code.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This booklet has been prepared by the Division of Workers’ Compensation to provide information and guidelines in handling Iowa workers’ compensation claims. For more detailed informaton, reference should be made to Iowa Code chapters 85 through 87, 17A and chapter 876 of the Iowa Administrative Code.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This booklet has been prepared by the Division of Workers’ Compensation to provide information and guidelines in handling Iowa workers’ compensation claims. For more detailed informaton, reference should be made to Iowa Code chapters 85 through 87, 17A and chapter 876 of the Iowa Administrative Code.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This booklet has been prepared by the Division of Workers’ Compensation to provide information and guidelines in handling Iowa workers’ compensation claims. For more detailed informaton, reference should be made to Iowa Code chapters 85 through 87, 17A and chapter 876 of the Iowa Administrative Code.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This booklet has been prepared by the Division of Workers’ Compensation to provide information and guidelines in handling Iowa workers’ compensation claims. For more detailed information, reference should be made to Iowa Code chapters 85 through 87, 17A and chapter 876 of the Iowa Administrative Code.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Advance planning, proper species selection, site preparation, careful handling of tree seedlings, and a good weed control program will help assure a successful tree planting. A commitment to plant with care, is an important first step that leads to successful establishment of tree and shrub seedlings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This fact sheets summarizes, in brief form, the compliance requirements for transportation, storage, handling and use of propane. It is not intended to provide comprehensive guidance on regulatory compliance for those dealing with propane, but to highlight those requirements and to assist those who may be affected by the various requirements to obtain detailed information when needed. Information about requirements which apply to the use of propane as a motor fuel is not included.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A report of a one year assessment of Iowa's Juvenile Courts handling of Child in Need of Assistance cases and a plan for improvement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A plan for improvement of Iowa's Juvenile Courts handling of Child in Need of Assistance cases. A brief report focusing on just the plan for improvement pulled from the main report: A Study of Iowa's Court Performance in Child Abuse and Neglect Cases and Plan for Improvement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This fact sheets summarizes, in brief form, the compliance requirements for transportation, storage, handling and use of propane. It is not intended to provide comprehensive guidance on regulatory compliance for those dealing with propane, but to highlight those requirements and to assist those who may be affected by the various requirements to obtain detailed information when needed. Information about requirements which apply to the use of propane as a motor fuel is not included.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the amount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims appeared to have occurred randomly. However, using data from a sub sample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of warning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an example of such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the anount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims hppeared to have occurred randomly. However, using data from a subsample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of wcirning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an examples such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Please note the following process describes handling employment, public accommodation, credit, or education cases. The process for housing complaints differs, from timelines to opportunities to seek judicial remedies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.