16 resultados para Art 1 Ley 222 de 1995
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Delegates the authority and responsibility for the Job Training Partnership Act to the Workforce Development Department(WDD). Replaces and rescinds Executive Order #24.
Resumo:
Iowa Ag Review is a quarterly newsletter published by the Center for Agricultural and Rural Development (CARD). This publication presents summarized results that emphasize the implications of ongoing agricultural policy analysis, analysis of the near-term agricultural situation, and discussion of agricultural policies currently under consideration.
Resumo:
Iowa Ag Review is a quarterly newsletter published by the Center for Agricultural and Rural Development (CARD). This publication presents summarized results that emphasize the implications of ongoing agricultural policy analysis, analysis of the near-term agricultural situation, and discussion of agricultural policies currently under consideration.
Resumo:
Iowa Ag Review is a quarterly newsletter published by the Center for Agricultural and Rural Development (CARD). This publication presents summarized results that emphasize the implications of ongoing agricultural policy analysis, analysis of the near-term agricultural situation, and discussion of agricultural policies currently under consideration.
Resumo:
Iowa Ag Review is a quarterly newsletter published by the Center for Agricultural and Rural Development (CARD). This publication presents summarized results that emphasize the implications of ongoing agricultural policy analysis, analysis of the near-term agricultural situation, and discussion of agricultural policies currently under consideration.
Resumo:
Appoints the Des Moines resident-in-charge for the U.S. Drug Enforcement Adminstration as a nonvoting ex-officio member of the Iowa Law Enforcement Academy Council.
Resumo:
Replaces and rescinds Executive Order #37.
Resumo:
Directs Department of Personnel to develop policy that will assist in continuing efforts to maintain a violence-free workplace.
Resumo:
Newsletter for Department of Natural Resources, Waste Management Division
Potential-Scour Assessments and Estimates of Maximum Scour at Selected Bridges in Iowa, HR-344, 1995
Resumo:
This report presents the results of potential-scour assessments at 130 bridges and estimates of maximum scour at 10 bridges, in Iowa. All of the bridges evaluated in the study are constructed bridges (not culverts) that are sites of active or discontinued streamflow-gaging stations and peak-stage measurement sites. The period of the study was from October 1991 to September 1994. The potential-scour assessments were made using a potential-scour index developed by the U.S. Geological Survey for a study in Tennessee. Higher values of the index suggest a greater likelihood of scour-related problems occurring at a bridge. The estimates of maximum scour were made using scour equations recommended by the Federal Highway Administration. In this study, the long term aggradation or degradation that occurred during the period of streamflow data collection at each site was evaluated. Although the abutment-scour equation predicted deep scour holes at many of the sites, the only significant abutment scour that was measured was erosion of the embankment at the left abutment at one bridge after a flood.
Resumo:
This research evaluated the concrete strength of two mixes which were used in the Polk County project NHS-500-1(3)--10-77 and were developed to meet a contract requirement of 900 psi third-point 28-day flexural strength. Two concrete mixes, the Proposed Mix and the Enhanced Mix, were tested for strength. Based on the experimental results, it was found that the addition of 50 lb of cementitious materials did not significantly increase concrete strength. The requirement of 900 psi 28-day third-point flexural strength (MOR-TPL) was not achieved by this amount of addition of cementitious materials.
Resumo:
"Certainly no one person or state was the sole impetus for something as monumental as the Highway Research Board. Yet Iowa boasts of having provided many of the key people whose vision and energies literally created and sustained the HRB during its first critical years: Anson Marston, Thomas Agg, Thomas MacDonald, and Roy Crum." -- from page 2
Resumo:
This summary of legislation enacted by the General Assembly has been prepared for the use of legislators and other interested parties. The summary of each legislative enactment has been assigned to a major subject category. This compilation provides interested persons with quick reference to legislation enacted in specific areas and generally informs persons of the contents and effective date of the legislation. NOTE: This is a large file and may take a few minutes to load.
Resumo:
Report on a special investigation of the City of Halbur for the period July 1, 1995 through June 30, 2008
Resumo:
The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.