10 resultados para Allocation problems

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Highway maintenance engineers and administrators are often confronted with a number of problems related to highway maintenance work programs. One of these problems is concerned with determining the optimum number and locations of highway maintenance garages in a given area. Serious decline in highway revenues and a high inflation rate have made it necessary to examine existing maintenance practices and to allocate reduced financial resources more effectively and efficiently. Searching for and providing of reasonable solutions to these problems is the focus of this research project. The methodology used is to identify and modify for use (if necessary) those models which have already been developed. Models which could give optimum number and locations of highway maintenance garages were found to be too theoretical and/or practically infeasible. Consequently, research focus was shifted from these models to other models that could compare alternatives and select the best among these alternatives. Three such models -- the Alabama model, California model, and Louisiana model, were identified and studied.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past century, public health has been credited with adding 25 years to life expectancy by contributing to the decline in illness and injury. Progress has been made, for example, in smoking reduction, infectious disease, and motor vehicle and workplace injuries. Besides its focus on traditional concerns such as clean water and safe food, public health is adapting to meet emerging health problems. Particular troublesome are health threats to youth: teenage pregnancies, violence, substance abuse, sexually transmitted diseases, and other conditions associated with high-risk behaviors. These threats add to burgeoning health care costs. A conservative estimate of $69 billion in medical spending could be averted through the impact of public health strategies aimed at heart disease, stroke, fatal and nonfatal occupational injuries, motor vehicle-related injuries, low birth weight, and violence. These strategies require the collaboration of many groups in the public and private sectors. Collaboration is the bedrock of public health and Healthy Iowans planning. At the core of Healthy Iowans 2000 and its successor, Healthy Iowans 2010, is the idea that all Iowans benefit when stakeholders decide on disease prevention and health promotion strategies and agree to work together on them. These strategies can improve the quality of life and hold down health care costs. The payoff for health promotion and disease prevention is not immediate, but it has long-lasting benefits. The Iowa plan is a companion to the national plan, Healthy People 2010. An initiative to improve the health of Americans, the national plan is the driving force for federal resource allocation for disease prevention and health promotion. The state plan is used in the same way. Both plans have received broad support from Republican and Democratic administrations. Community planners are using the state plan to help assess health needs and craft health improvement plans. Healthy Iowans 2010 was written at an unusual point in history – a new decade, a new century, a new millennium. The introduction was optimistic. “The 21st century,” it says, “promises to add life as well as years through improved health habits coupled with medical advances. Scientists have suggested that if these changes occur, the definition of adulthood will also change. An extraordinary number of people will live fuller, more active lives beyond that expected in the late 20th century.” At the same time, the country has spawned a new generation of health hazards. According to Dr. William Dietz of the Centers for Disease Control and Prevention (CDC), it has replaced “the diseases of deficiency with diseases of excess” (Newsweek, August 2, 1999). New threats, such as childhood overweight, can reverse progress made in the last century. This demands concerted action.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To ensure that high-quality materials are used in concrete mixing, all materials delivered to the site should be inspected to ensure that they meet specification requirements. All materials should be delivered with the proper certifications, invoices, or bill of lading. These records should indicate when the shipment arrived, the amount and identification of material delivered, and the laboratory report certification number, invoice number, and ticket number.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is an overview of the United States Commission on Civil Rights and the duties of the Iowa State Advisory Committee. It contains a report concerning problems of the Spanish surnamed and migrant population in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The programs included in this Discussion Paper no. 17 are Distance, Unravel, Retrench and Alloc 6B that deal with location-allocation analyses first published in 1973 by the Department of Geography, The University of Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is formatted to independently present four individual investigations related to similar web gap fatigue problems. Multiple steel girder bridges commonly exhibit fatigue cracking due to out-of-plane displacement of the web near the diaphragm connections. This fatigue-prone web gap area is typically located in negative moment regions of the girders where the diaphragm stiffener is not attached to the top flange. In the past, the Iowa Department of Transportation has attempted to stop fatigue crack propagation in these steel girder bridges by drilling holes at the crack tips. Other nondestructive retrofits have been tried; in a particular case on a two-girder bridge with floor beams, angles were bolted between the stiffener and top flange. The bolted angle retrofit has failed in the past and may not be a viable solution for diaphragm bridges. The drilled hole retrofit is often only a temporary solution, so a more permanent and effective retrofit is required. A new field retrofit has been developed that involves loosening the bolts in the connection between the diaphragm and the girders. Research on the retrofit has been initiated; however, no long-term studies of the effects of bolt loosening have been performed. The intent of this research is to study the short-term effects of the bolt loosening retrofit on I-beam and channel diaphragm bridges. The research also addressed the development of a continuous remote monitoring system to investigate the bolt loosening retrofit on an X-type diaphragm bridge over a number of months, ensuring that the measured strain and displacement reductions are not affected by time and continuous traffic loading on the bridge. The testing for the first three investigations is based on instrumentation of web gaps in a negative moment region on Iowa Department of Transportation bridges with I-beam, channel, and X-type diaphragms. One bridge of each type was instrumented with strain gages and deflection transducers. Field tests, using loaded trucks of known weight and configuration, were conducted on the bridges with the bolts in the tight condition and after implementing the bolt loosening retrofit to measure the effects of loosening the diaphragm bolts. Long-term data were also collected on the X-diaphragm bridge by a data acquisition system that collected the data continuously under ambient truck loading. The collected data were retrievable by an off-site modem connection to the remote data acquisition system. The data collection features and ruggedness of this system for remote bridge monitoring make it viable as a pilot system for future monitoring projects in Iowa. Results indicate that loosening the diaphragm bolts reduces strain and out-of-plane displacement in the web gap, and that the reduction is not affected over time by traffic or environmental loading on the bridge. Reducing the strain in the web gap allows the bridge to support more cycles of loading before experiencing fatigue, thus increase the service life of the bridge. Two-girder floor beam bridges may also exhibit fatigue cracking in girder webs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design of satisfactory supporting and expansion devices for highway bridges is a problem which has concerned bridge design engineers for many years. The problems associated with these devices have been emphasized by the large number of short span bridges required by the current expanded highway program of expressways and interstate highways. The initial objectives of this investigation were: (1) To review and make a field study of devices used for the support of bridge superstructures and for provision of floor expansion; (2) To analyze the forces or factors which influence the design and behavior of supporting devices and floor expansion systems; and (3) To ascertain the need for future research particularly on the problems of obtaining more economical and efficient supporting and expansion devices, and determining maximum allowable distance between such devices. The experimental portion was conducted to evaluate one of the possible simple and economical solutions to the problems observed in the initial portion. The investigation reported herein is divided into four major parts or phases as follows: (1) A review of literature; (2) A survey by questionnaire of design practice of a number of state highway departments and consulting firms; (3) Field observation of existing bridges; and, (4) An experimental comparison of the dynamic behavior of rigid and elastomeric bearings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa Department of Natural Resources commitment to improving the management of both the quantity and quality of water resources, a committee was formed to assess the current policies and practices regarding water rights and allocation, and to make recommendations that would assist the state in moving toward a sustainable future. Water allocation concerns have been raised again in the past few years as increases in the demand for water are projected due to ethanol production, geothermal heating-cooling, and potential irrigation expansion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.