5 resultados para AVERAGES

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Overview of the Passenger Service Connects Iowa City, Quad Cities and Chicago, 219.5 miles Twice‐daily service each way, 4 hours and 15 minutes travel time 246,800 passengers first year (676 per day) Project construction cost $310 million (80% federal, 14.5% Illinois, 5.4% Iowa) On‐time performance 90% or better (trains arrive within 10 minutes of schedule) Competitive passenger rail service operator selection Iowa’s annual share of operating cost support averages $3 million

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Efforts to eliminate rutting on the Interstate system have resulted in 3/4 in. aggregate mixes, with 75 blow Marshall, 85% crushed aggregate mix designs. On a few of these projects paved in 1988-1989, water has appeared on the surfaces. Some conclusions have been reached by visual on-sight investigations that the water is coming from surface water, rain and melting snow gaining entry into the surface asphalt mixture, then coming back out in selected areas. Cores were taken from several Interstate projects and tested for permeability to investigate the surface water theory that supposedly happens with only the 3/4 in. mixtures. All cores were of asphalt overlays over portland cement concrete, except for the Clarke County project which is full depth AC. The testing consisted of densities, permeabilities, voids by high pressure airmeter (HPAM), extraction, gradations, AC content, and film thicknesses. Resilient modulus, indirect tensile and retained strengths after freeze/thaw were also done. All of the test results are about as expected. Permeabilities, the main reason for testing, ranged from 0.00 to 2.67 ft per day and averages less than 1/2 ft per day if the following two tests are disregarded. One test on each binder course came out to 15.24 ft/day, and a surface course at 13.78 ft/day but these are not out of supposedly problem projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Since 1987, the Iowa Department of Transportation has based control of hot asphalt concrete mixes on cold feed gradations. This report presents results of comparisons between cold feed gradations and gradations of aggregate from the same material after it has been processed through the plant and laydown machine. Results are categorized based on mix type, plant type, and method of dust control, in an effort to quantify and identify the factors contributing to those changes. Results of the report are: 1. From the 390 sample comparisons made, aggregate degradation due to asphalt plant processing was demonstrated by an average increase of +0.7% passing the #200 sieve and an average increase in surface area of +1.8 sq. ft. per pound of aggregate. 2. Categories with Type A Mix or Recycling as a sorting criteria generally produced greater degradation than categories containing Type B Mixes and/or plants with scrubbers. 3. None of the averages calculated for the categories should be considered unacceptably high, however, it is information that should be considered when making mix changes in the field, selecting asphalt contents for borderline mix designs, or when evaluating potential mix gradation specification or design criteria changes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the main report concerning the role that magnesium may have in highway concrete aggregate, over 20,000 electron microprobe data were obtained, primarily from automated scans, or traverses, across dolomite aggregate grains and the adjacent cement paste. Representative traverses were shown in figures and averages of the data were presented in Table II. In this Appendix, detailed representative and selected analyses of carbonate aggregate only are presented. These analyses were not presented in the main report because they would be interesting to only a few specialists in dolomite· rocks. In this Appendix, individual point analyses of mineral compositions in the paste have been omitted along with dolomite compositions at grain boundaries and cracks. Clay minerals and quartz inclusions in the aggregate are also not included. In the analyses, the first three column headings from left to right show line number, x-axis, and y-axis (Line number is an artifact of the computer print-out for each new traverse. Consecutive line numbers indicate a continuous traverse with distances between each point of 1.5 to a few μ-m. X-axis and y-axis are coordinates on the electron microscope stage). The next columns present weight percent oxide content of FeO, K20, CaO, Si02, Al203, MgO, SrO, BaO, MnO, Na20, and C02 (calculated assuming the number of moles of C02 is equal to the sum of moles of oxides, chiefly CaO and MgO), TOTAL (the sum of all oxides), and total (sum of all oxides excluding COi). In many of the analyses total is omitted.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Quality Management Earthwork (QM-E) special provision was implemented on a pilot project to evaluate quality control (QC) and quality assurance (QA) testing in predominately unsuitable soils. Control limits implemented on this pilot project included the following: 95% relative compaction, moisture content not exceeding +/- 2% of optimum moisture content, soil strength not exceeding a dynamic cone penetrometer (DCP) index of 70 mm/blow, vertical uniformity not exceeding a variation in DCP index of 40 mm/blow, and lift thickness not exceeding depth determined through construction of control strips. Four-point moving averages were used to allow for some variability in the measured parameter values. Management of the QC/QA data proved to be one of the most challenging aspects of the pilot project. Implementing use of the G-RAD data collection system has considerable potential to reduce the time required to develop and maintain QC/QA records for projects using the QM-E special provision. In many cases, results of a single Proctor test were used to establish control limits that were used for several months without retesting. While the data collected for the pilot project indicated that the DCP index control limits could be set more tightly, there is not enough evidence to support making a change. In situ borings, sampling, and testing in natural unsuitable cut material and compacted fill material revealed that the compacted fill had similar strength characteristics to that of the natural cut material after less than three months from the start of construction.