3 resultados para 775

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

10.00% 10.00%

Publicador:

Resumo:

A century ago, the majority of workers were employed near their homes—on farms or in cities and towns. As industrialization increased and suburbs surrounded central cities, commuting meant going from homes in suburbs to jobs in cities. Today, there is a growing trend of workers commuting between suburbs. On any given day, 61,775 workers commute to jobs in Iowa counties other than the one in which they live. The most important reason for increased commuting has been employment growth. Rising incomes and the growth of suburbs have also been factors. In the past, the increased employment of women added to the number of commuters. Commuting patterns are a key consideration in transportation planning. In more urban states than Iowa, there is concern that the use of mass transit continues to decline. In Iowa, where so much of our commuting is between counties, private vehicles are often the only practical means of getting to and from work. On any given day, 1,155,008 single-occupancy vehicles are driven to and from jobs somewhere in Iowa. At the same time, an additional158,699 workers share rides by participating in carpools.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Food products are a specialization, an industry of excellence, and thelargest sector of manufacturing employment in the state of Iowa. All ofthe top five food companies have operations in Iowa. According to Harris Info Source, manufacturing of foods and ingredients in Iowa employs 58,826 people at 775 plants. Processing and value adding enterprises are fed by nation-leading agriculture. Iowa is the top producer of corn, soybeans, hogs and eggs in the United States.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.