Bureau of Nutrition and Health Promotion part of the Iowa Department of Public Health produces of weekly newsletter about the Iowa WIC Program for the State of Iowa citizen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1986, a 0.34 mile experimental section of polymerized asphalt cement (PAC30) concrete was placed in the westbound driving lane of Interstate 80 in western Iowa. It was used in a 2" asphalt concrete inlay using 20% recycled asphalt pavement. The virgin aggregate included 41% crushed gravel, 25% crushed quartzite and 14% natural sand. The evaluation of the project was severely limited when a 1987 reconstruction project extended into the experimental section leaving only 395 feet. Rut depths under a 4-foot gage were taken for a period of two years. No significant rutting occurred in the experimental polymerized section. The frequency of transverse cracking in the polymerized AC section was the same as that of the comparative AC-20 section. The asphalt paving mixture made with polymerized AC cost 120% of the cost of the conventional mix.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new machine, the ROTO-MILL Profiler, became available in early 1976. This machine, manufactured by CMI Corporation of Oklahoma City, Oklahoma provides pavement surface Scarification at a much higher production rate than was previously possible. Iowa had the opportunity to observe and evaluate this machine on two separate sections of primary portland cement concrete pavement in October, 1976. The marked improvement in the profile index and the skid resistance indicates this machine may be considered a viable method for improving rideability and skid resistance of a roadway that is otherwise reasonably sound.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pavements constructed in Iowa during the period of the 1920's through the late 1940's were built with an integral curb. The purpose of the curb was to control drainage of water from the pavement surface in areas where runoff took place at a very rapid rate. It is for this reason that curbing is found on pavements constructed during this period. The curbing led the water flowing on the pavement surface to drainage outlets; this helped reduce erosion along the edge of the slab. The curbs have satisfactorily performed the job for which they were intended. The advent of bigger and faster vehicles has created a demand for changes in the design of pavements. Current designs provide wider driving surfaces with reduced grades which can better accommodate the wider cars and trucks. By present day design standards the narrow highways are inadequate and are being replaced or improved. The normal improvement procedure is to widen to 24 feet by providing additional driving surface at each edge of the pavement. Curbing is removed from the pavement so that the surface of the widening can be placed at the same level as that of the slab.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An initial feasibility study indicated that the "Purdue Accelerated Polishing Method" gave repeatable results when testing the skid resistance of laboratory specimens. The results also showed a rough correlation with the field performance of the same aggregate sources. The research was then expanded to include all available asphalt aggregates. The results of the expanded study indicated that the method is not presently capable of developing and measuring the full skid potential of the various aggregate sources. Further research in the area of polishing times and/or pressures is needed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this project was to assess the predictive accuracy of flood frequency estimation for small Iowa streams based on the Rational Method, the NRCS curve number approach, and the Iowa Runoff Chart. The evaluation was based on comparisons of flood frequency estimates at sites with sufficiently long streamgage records in the Midwest, and selected urban sites throughout the United States. The predictive accuracy and systematic biases (under- or over-estimation) of the approaches was evaluated based on forty-six Midwest sites and twenty-one urban sites. The sensitivity of several watershed characteristics such as soil properties, slope, and land use classification was also explored. Recommendations on needed changes or refinements for applications to Iowa streams are made.