15 resultados para 341.73

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bureau of Nutrition and Health Promotion part of the Iowa Department of Public Health produces of weekly newsletter about the Iowa WIC Program for the State of Iowa citizen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research was initiated in 1991 as a part of a whitetopping project to study the effectiveness of various techniques to enhance bond strength between a new portland cement concrete (PCC) overlay and an existing asphalt cement concrete (ACC) pavement surface. A 1,676 m (5,500 ft) section of county road R16 in Dallas County was divided into 12 test sections. The various techniques used to enhance bond were power brooming, power brooming with air blast, milling, cement and water grout, and emulsion tack coat. Also, two sections were planed to a uniform cross-section, two pavement thicknesses were placed, and two different concrete mix proportions were used. Bond strength was perceived to be the key to determining an appropriate design procedure for whitetopping. If adequate bond is achieved, a bonded PCC overlay technique can be used for design. Otherwise, an unbonded overlay procedure may be more appropriate. Conclusions are as follows: (1) Bond Strength Differences - Milling increased bond strength versus no milling. Tack coat showed increased bond strength versus no tack coat. Planing, Air Blast and Grouting did not provide noticeable improvements in bond strength; nor did different PCC types or thicknesses affect bond strength significantly. (2) Structure - Structural measurements correlated strongly with the wide variation in pavement thicknesses. They did not provide enough information to determine the strength of bonding or the level of support being provided by the ACC layer. Longitudinal cracking correlated with PCC thicknesses and with planing. (3) Bond Over Time - The bond between PCC and ACC layers is degrading over time in the outside wheel path in all of the sections except tack coat (section 12). The bond strength in the section with tack coat was lower than the others, but remained relatively steady.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this investigation was to study the flexural fatigue strength of two prestressed steel I-beams which had previously been fabricated in connection with a jointly sponsored project under the auspices of the Iowa State Highway Commission. The beams were prestressed by deflecting them under the action of a concentrated load at the center of a simple span, then welding unstressed high strength steel plates to the top and bottom flanges to retain a predetermined amount of prestress. The beams were rolled sections of A36 steel and the plates were USS "T-1" steel. Each of the two test specimens were subjected to an identical repeated loading until a fatigue failure occurred. The loading was designed to produce stresses equivalent to those which would have occurred in a simulated bridge and amounted to 84 percent of a standard H-15 live load including impact. One of the beams sustained 2,469,100 repetitions of load to failure and the other sustained 2,756,100 cycles. Following the fatigue tests, an experimental study was made to determine the state of stress that had been retained in the prestressed steel beams. This information, upon which the calculated stresses of the test could be superimposed, provided a method of correlating the fatigue strength of the beams with the fatigue information available on the two steels involved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The coarse aggregates used for Portland Cement concrete in southwest Iowa have exhibited a poor serviceability. This early failure is attributed to a characteristic commonly referred as "D" cracking. "D" line cracking is a discolored area of concrete caused by many fine, parallel hairline cracks. "D" line cracking is primarily caused by the movement of water in and through coarse aggregate with a unique pore structure. The presence of the water in the aggregates at the time of freezing causes the "D" cracking to occur and early failure. By making the pore structure less permeable to moisture, it is thought the durability factor of the concrete should increase. By drying the aggregate before mixing and then mixing with the cement, the particles of cement should enter the outer pore structure, and upon hydration make the pore structure less permeable to moisture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A quarterly journal of Iowa authors and their works produced by State Historical Society of Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A quarterly journal of Iowa authors and their works produced by State Historical Society of Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A quarterly journal of Iowa authors and their works produced by State Historical Society of Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A quarterly journal of Iowa authors and their works produced by State Historical Society of Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research was initiated in 1991 as a part of a whitetopping project to study the effectiveness of various techniques to enhance bond strength between a new Portland cement concrete (PCC) overlay and an existing asphalt cement concrete (ACC) pavement surface. A 1,676 m (5,500 ft) section of county road R16 in Dallas County, Iowa was divided into 12 test sections. The various techniques used to enhance bond were power brooming, power brooming with air blast, milling, cement and water grout, and emulsion tack coat. As a part of these bonding techniques, two pavement thicknesses were placed; two different concrete proportions were used; and two sections were planed to a uniform cross-slope.