10 resultados para 333.82
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Bureau of Nutrition and Health Promotion part of the Iowa Department of Public Health produces of weekly newsletter about the Iowa WIC Program for the State of Iowa citizen.
Resumo:
The Federal Highway Administration (FHWA) and the Iowa and Illinois Departments of Transportation (Iowa DOT and IDOT) have identified the Selected Alternative for improving Interstate 74 (I-74) from its southern terminus at Avenue of the Cities (23rd Avenue) in Moline, Illinois to its northern terminus one mile north of the I-74 interchange with 53rd Street in Davenport, Iowa. The Selected Alternative identified and discussed in this Record of Decision is the preferred alternative identified in the Final Environmental Impact Statement (FEIS). The purpose of the proposed improvements is to improve capacity, travel reliability, and safety along I-74 between its termini, and provide consistency with local land use planning goals. The need for the proposed improvements to the I-74 corridor is based on a combination of factors related to providing better transportation service and sustaining economic development.
Resumo:
The need to upgrade understrength bridges in the United States has been well documented in the literature. The concept of strengthening steel stringer bridges in Iowa has been developed through several Iowa DOT projects. The objective of the project described in this report was to investigate the use of one such strengthening system on a three-span continuous steel stringer bridge in the field. In addition, a design methodology was developed to assist bridge engineers with designing a strengthening system to obtain the desired stress reductions. The bridge selected for strengthening was in Cerro Gordo County near Mason City, Iowa on County Road B65. The strengthening system was designed to remove overstresses that occurred when the bridge was subjected to Iowa legal loads. A two part strengthening system was used: post-tensioning the positive moment regions of all the stringers and superimposed trusses in the negative moment regions of the two exterior stringers at the two piers. The strengthening system was installed in the summers of 1992 and 1993. In the summer of 1993, the bridge was load tested before and after the strengthening system was activated. The load test results indicate that the strengthening system was effective in reducing the overstress in both the negative and positive regions of the stringers. The design methodology that was developed includes a procedure for determining the magnitude of post-tensioning and truss forces required to strengthen a given bridge. This method utilizes moment and force fractions to determine the distribution of strengthening axial forces and moments throughout the bridge. Finite element analysis and experimental results were used in the formulation and calibration of the methodology. A spreadsheet was developed to facilitate the calculation of these required strengthening forces.
Resumo:
The need for upgrading a large number of understrength bridges in the United States has been well documented in the literature. This manual presents two methods for strengthening continuous-span composite bridges: post-tensioning of the positive moment regions of the bridge stringers and the addition of superimposed trusses at the piers. The use of these two systems is an efficient method of reducing flexural overstresses in undercapacity bridges. Before strengthening a given bridge however, other deficiencies (inadequate shear connection, fatigue problems, extensive corrosion) should be addressed. Since continuous-span composite bridges are indeterminant structures, there is longitudinal and transverse distribution of the strengthening axial forces and moments. This manual basically provides the engineer with a procedure for determining the distribution of strengthening forces and moments throughout the bridge. As a result of the longitudinal and transverse force distribution, the design methodology presented in this manual for continuous-span composite bridges is extremely complex. To simplify the procedure, a spreadsheet has been developed for use by practicing engineers. This design aid greatly simplifies the design of a strengthening system for a given bridge in that it eliminates numerous tedious hand calculations, computes the required force and moment fractions, and performs the necessary iterations for determining the required strengthening forces. The force and moment distribution fraction formulas developed in this manual are primarily for the Iowa DOT V12 and V14 three-span four-stringer bridges. These formulas may be used on other bridges if they are within the limits stated in this manual. Use of the distribution fraction formulas for bridges not within the stated limits is not recommended.
Comparison of Various Commercial Hydrated Limes for Reducing Soil Plasticity, HR-82 and HR-106, 1964
Resumo:
Atterberg limits tests were performed on mixtures of gumbotil soil and the various chief chemical compounds found in hydrated limes. The results were then checked with commercial hydrated limes of varying chemical compositions. Results indicate that among the major constituents of hydrated limes Ca(OH)2 is most effective in reducing soil plasticity. MgO shows a moderate effect, but Mg(OH)2 and CaCO3 show practically no effect. There is, however, practically no difference between different types or between the same type of commercial hydrated limes for the reduction of soil plasticity. The choice of lime for soil-lime stabilization should, therefore, be dictated by the relative price and pozzolanic strength characteristics of the lime.
Resumo:
Des Moines River Plat Maps.
Resumo:
Des Moines River Plat Maps.
Resumo:
Des Moines River Plat Maps.
Resumo:
The Iowa D.O.T. specifications do not require 100 percent of 50 blow Marshall density (generally 94%) for field compaction. However, stabilities are determined in the Laboratory on specimens compacted to 100 percent of Marshall density. The purpose of this study is to determine the stabilities of specimens compacted to various densities which are below 100 percent of the 50 blow Marshall density.
Resumo:
It has been observed in the Laboratory that an increase in oven heating time of relatively short duration between mixing and compaction of asphaltic concrete hot mixes can have an effect on the Marshall stability results obtained. The purpose of this short investigation is to determine the effect of oven heating time on the density and stability of hot mixes.