17 resultados para 227.85

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

I list of E-85 Refuling Sites in Iowa, produced by Iowa Department of Natural Resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bureau of Nutrition and Health Promotion part of the Iowa Department of Public Health produces of weekly newsletter about the Iowa WIC Program for the State of Iowa citizen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this project was to determine the optimal hole pattern needed for undersealing work, and also to determine if it is feasible to underseal a roadway with existing longitudinal subdrains without plugging the subdrain system. At the test site the hole pattern had little effect on the grout distribution. It was found that the hole pattern, to be effective, must locate existing voids and that holes must extend at least 2 in. (5 cm) below the underside of the pavement. It appeared that pavements can be undersealed without significant damage to the existing subdrains, but special care is needed to assure that excess grout is not injected into the drainage system. Recommendations are made concerning the hole pattern, grout efflux time, and procedures for minimizing the risk of plugging the subdrains with grout.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The highway departments of all fifty states were contacted to find the extent of application of integral abutment bridges, to survey the different guidelines used for analysis and design of integral abutment bridges, and to assess the performance of such bridges through the years. The variation in design assumptions and length limitations among the various states in their approach to the use of integral abutments is discussed. The problems associated with lateral displacements at the abutment, and the solutions developed by the different states for most of the ill effects of abutment movements are summarized in the report. An algorithm based on a state-of-the-art nonlinear finite element procedure was developed and used to study piling stresses and pile-soil interaction in integral abutment bridges. The finite element idealization consists of beam-column elements with geometric and material nonlinearities for the pile and nonlinear springs for the soil. An idealized soil model (modified Ramberg-Osgood model) was introduced in this investigation to obtain the tangent stiffness of the nonlinear spring elements. Several numerical examples are presented in order to establish the reliability of the finite element model and the computer software developed. Three problems with analytical solutions were first solved and compared with theoretical solutions. A 40 ft H pile (HP 10 X 42) in six typical Iowa soils was then analyzed by first applying a horizontal displacement (to simulate bridge motion) and no rotation at the top and then applying a vertical load V incrementally until failure occurred. Based on the numerical results, the failure mechanisms were generalized to be of two types: (a) lateral type failure and (b) vertical type failure. It appears that most piles in Iowa soils (sand, soft clay and stiff clay) failed when the applied vertical load reached the ultimate soil frictional resistance (vertical type failure). In very stiff clays, however, the lateral type failure occurs before vertical type failure because the soil is sufficiently stiff to force a plastic hinge to form in the pile as the specified lateral displacement is applied. Preliminary results from this investigation showed that the vertical load-carrying capacity of H piles is not significantly affected by lateral displacements of 2 inches in soft clay, stiff clay, loose sand, medium sand and dense sand. However, in very stiff clay (average blow count of 50 from standard penetration tests), it was found that the vertical load carrying capacity of the H pile is reduced by about 50 percent for 2 inches of lateral displacement and by about 20 percent for lateral displacement of 1 inch. On the basis of the preliminary results of this investigation, the 265-feet length limitation in Iowa for integral abutment concrete bridges appears to be very conservative.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The highway departments of the states which use integral abutments in bridge design were contacted in order to study the extent of integral abutment use in skewed bridges and to survey the different guidelines used for analysis and design of integral abutments in skewed bridges. The variation in design assumptions and pile orientations among the various states in their approach to the use of integral abutments on skewed bridges is discussed. The problems associated with the treatment of the approach slab, backfill, and pile cap, and the reason for using different pile orientations are summarized in the report. An algorithm based on a state-of-the-art nonlinear finite element procedure previously developed by the authors was modified and used to study the influence of different factors on behavior of piles in integral abutment bridges. An idealized integral abutment was introduced by assuming that the pile is rigidly cast into the pile cap and that the approach slab offers no resistance to lateral thermal expansion. Passive soil and shear resistance of the cap are neglected in design. A 40-foot H pile (HP 10 X 42) in six typical Iowa soils was analyzed for fully restrained pile head and pinned pile head. According to numerical results, the maximum safe length for fully restrained pile head is one-half the maximum safe length for pinned pile head. If the pile head is partially restrained, the maximum safe length will lie between the two limits. The numerical results from an investigation of the effect of predrilled oversized holes indicate that if the length of the predrilled oversized hole is at least 4 feet below the ground, the vertical load-carrying capacity of the H pile is only reduced by 10 percent for 4 inches of lateral displacement in very stiff clay. With no predrilled oversized hole, the pile failed before the 4-inch lateral displacement was reached. Thus, the maximum safe lengths for integral abutment bridges may be increased by predrilling. Four different typical Iowa layered soils were selected and used in this investigation. In certain situations, compacted soil (> 50 blow count in standard penetration tests) is used as fill on top of natural soil. The numerical results showed that the critical conditions will depend on the length of the compacted soil. If the length of the compacted soil exceeds 4 feet, the failure mechanism for the pile is similar to one in a layer of very stiff clay. That is, the vertical load-carrying capacity of the H pile will be greatly reduced as the specified lateral displacement increases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Troxler 3241-B Asphalt Content Gauge is intended for rapidly determining the bitumen content of bituminous paving mixtures. A 300 Millicurie Americuium 241: Beryllium source emitts neutrons which are affected by the hydrogen in the mix. The affected neutrons are detected by Helium 3 detectors, counted and computed into a percentage bitumen of the asphalt mix. The current methods of determining the bitumen content of bituminous paving mixtures requires the use of potentially hazardous chemicals and several hours of testing time. When extracted aggregates are not needed, determination of the bitumen content of a paving mixture by the nuclear method may be easier, quicker and potentially safer. The objective of the project is to study the accuracy of the Troxler 3241-B Nuclear Asphalt Content Gauge in measuring the asphalt cement (AC) content of asphalt concrete mixtures produced with different asphalt cements and different aggregates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bureau of Nutrition and Health Promotion part of the Iowa Department of Public Health produces of weekly newsletter about the Iowa WIC Program for the State of Iowa citizen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Des Moines River Plat Maps.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The report describes the state of the art video equipment used and experiences gained from the 6,800 mile field test. The first objective of this project was to determine if laser disc equipment could capture and store usable roadway images while operating in a mobile environment. The second objective was to evaluate methods of using optical disc storage and retrieval features to enhance highway planning and design function. Several highway departments have attempted to use video technology to replace the traditional 16 and 35 mm film format used in photologging. These attempts have met with limited success because of the distortion caused by video technology not being capable of dealing with highway speeds. The distortion has caused many highway signs to be unreadable and, therefore, clients have labeled the technology unusable. Two methods of using optical laser disc storage and retrieval have been successfully demonstrated by Wisconsin and Connecticut Departments of Transportation. Each method provides instantaneous retrieval and linking of images with other information. However, both methods gather the images using 35 mm film techniques. The 35 mm film image is then transferred to laser disc. Eliminating the film conversion to laser disc has potential for saving $4 to $5 per logging mile. In addition to a cost savings, the image would be available immediately as opposed to delays caused by film developing and transferring to laser disc. In June and November of 1986 Iowa DOT staff and cooperating equipment suppliers demonstrated the concept of direct image capture. The results from these tests were promising and an FHWA Demonstration program established. Since 1986 technology advancements have been incorporated into the design that further improve the image quality originally demonstrated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study investigates the properties imparted to extruded asphalt curb mixes by five different additives. The AC used in these mixes was also tested with various amounts of the additives. All of the additives stiffened the AC as indicated by a reduction of penetration and increased viscosity. Only the powdered asphalts, gilsonite and Witcurb improved the Marshall stability and the indirect tensil strength enough to justify their use in curb mixes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three comparable hot mixed asphalt paving mixes were produced using two different aggregates produced from reclaimed portland cement concrete paving and one from a crushed limestone aggregate. These were subjected both dry and soaked to indirect tensile tests to determine the wet strength retention. One mix made from reclaimed concrete demonstrated a slightly better strength retention than the limestone mix and the other less. Satisfactory asphalt paving mixes can be produced from reclaimed concrete pavements but the increased asphalt demand (about 1%) negates part of the potential savings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Portland cement concrete is an outstanding structural material but stresses and cracks often occur in large structures due to drying shrinkage. The objective of this research was to determine the change in length due to loss of moisture from placement through complete drying of portland cement concrete. The drying shrinkage was determined for four different combinations of Iowa DOT structural concrete mix proportions and materials. The two mix proportions used were an Iowa DOT D57 (bridge deck mix proportions) and a water reduced modified C4 mix. Three 4"x 4"x 18" beams were made for each mix. After moist curing for three days, all beams were maintained in laboratory dry air and the length and weight were measured at 73°F ± 3°F. The temperature was cycled on alternate days from 73°F to 90°F through four months. From four months through six months, the temperature was cycled one day at 73°F and six days at 130°F. It took approximately six months for the concrete to reach a dry condition with these temperatures. The total drying shrinkage for the four mixes varied from .0106 in. to .0133 in. with an average of .0120 in. The rate of shrinkage was approximately .014% shrinkage per 1% moisture loss for all four mixes. The rate and total shrinkage for all four mixes was very similar and did not seem to depend on the type of coarse aggregate or the use of a retarder.