126 resultados para storage costs
Resumo:
This issue review provides information on the Department of Corrections construction and of proposed staffing for additional beds in the prison system and community-based corrections.
Resumo:
This report presents the results of a survey on the use of yellow versus white traffic paint. It was found that in most states the white paint was less expensive than the yellow. A substantial savings could be realized if an all white traffic marking system was permitted by the Federal Highway Administration. Paint costs from each state are presented, as well as by each region.
Resumo:
Audit report on the Iowa Petroleum Underground Storage Tank Board (UST Board) for the year ended June 30, 2014
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.
Resumo:
This report is a study of the costs, benefits and impacts of dredging programs for eight Iowa Lakes: Backbone Lake, Black Hawk Lake, Blue Lake, Five Island Lake, Lake Manawa, Mill Creek Lake, Rock Lake and Silver Lake. The studies were done by Economics Research Associates (ERA) and Engineering Consultants, Inc. (ECI) and was commissioned by the Iowa General Assembly to assist in determining public policy with respect to the dredging of the subject lakes.
Resumo:
The Iowa Department of Natural Resources (IDNR) has requested the Iowa Department of Public Health (IDPH) Hazardous Waste Site Health Assessment Program evaluate future health impacts of exposures at a former aboveground storage tank site located in Rolfe, Iowa. The former aboveground storage tank site is located to the southwest of the intersection of Railroad Street and 300th Avenue in Rolfe, Iowa. This site is undergoing a Targeted Brownfields Assessment conducted by the Contaminated Sites Section of the IDNR. This health consultation addresses potential health risks to people from future exposure to the soil within the property boundary, and any health impacts resulting from contaminated groundwater beneath the site property. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations.