215 resultados para interactive highway safety design


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sign vandalism has traditionally been a vexing problem for Iowa counties. The extent of the cost and incidence of these acts have never been fully ascertained, but a 1990 survey indicated that they cost Iowa counties more than 1.5 million dollars annually. In 1990, the Iowa Legislature recognized the seriousness of the problem and strengthened the existing sign vandalism law by increasing the penalty for illegal possession of a traffic control device from a simple to a serious misdemeanor. However, the courts must be willing to prosecute vandals to the magnitude provided in the Iowa Code. An educational campaign begun in 1987 involving over 200 Iowa school districts to educate students on the seriousness of the problem evidently did not have the effect of dramatically reducing the overall cost of sign vandalism in Iowa. This study sought to define the scope of the problem and possibly offer some effective countermeasures to combat sign vandalism and theft in Iowa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

When concrete deterioration begins to occur in highway pavement, repairs become necessary to assure the rider safety, extend its useful life and restore its riding qualities. One rehabilitation technique used to restore the pavement to acceptable highway standards is to apply a thin portland cement concrete (PCC) overlay to the existing pavement. First, any necessary repairs are made to the existing pavement, the surface is then prepared, and the PCC overlay is applied. Brice Petrides-Donohue, Inc. (Donohue) was retained by the Iowa Department of Transportation (IDOT) to evaluate the present condition with respect to debonding of the PCC overlay at fifteen sites on Interstate 80 and State Highway 141 throughout the State of Iowa. This was accomplished by conducting an infrared thermographic and ground penetrating radar survey of these sites which were selected by the Iowa Department of Transportation. The fifteen selected sites were all two lanes wide and one-tenth of a mile long, for a total of three lane miles or 190,080 square feet. The selected sites are as follows: On Interstate 80 Eastbound, from milepost 35.25 to 35.35, milepost 36.00 to 36.10, milepost 37.00 to 37.10, milepost 38.00 to 38.10 and milepost 39.00 to 39.10, on State Highway 141 from milepost 134.00 to 134.10, milepost 134.90 to milepost 135.00, milepost 135.90 to 136.00, milepost 137.00 to 137.10 and milepost 138.00 to 138.10, and on Interstate 80 Westbound from milepost 184.00 to 184.10, milepost 185.00 to 185.10, milepost 186.00 to 186.10, milepost 187.00 to 187.10, and from milepost 188.00 to 188.10.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa DOT, created by the Iowa Legislature, began operating July 1, 1975. The newly formed Department of Transportation had a staff of 4,568 full-time equivalents (FTEs). These employees and their responsibilities came from the Highway Commission, Reciprocity Board, Aeronautics Commission, and parts of the Commerce Commission, Department of Revenue and Finance, Department of Public Safety and the Energy Policy Council. The Iowa DOT continually looks at ways to become more efficient in serving our customers. As a result, the current workforce equals approximately 2,818 full-time employees. The seven transportation commissioners set policy for the department and are appointed by the governor, with no more than four from one political party. Membership on the commission is gender-balanced. Commissioners are confirmed by the Iowa Senate and serve on a staggered basis for four-year terms. Commission meetings are usually held monthly in Ames. The meetings are open to the public and follow a printed agenda.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The project described herein has led to a convenient, computer-based expert system for identifying and evaluating potentially effective erosion- and sedimentation-control measures for use in roadway construction throughout Iowa and elsewhere in the Midwest. The expert system is intended to be an accessible and efficient practical resource to aid state, county, and municipal engineers in the selection of the best management practices for preventing unwanted erosion and sedimentation at roadway construction sites, during and after construction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Timber material repair and replacement cost for timber bridges is a considerable expense to highway agencies in Iowa, especially to county road departments. To address these needs, the objectives of this investigation was to study the field effectiveness of various treatment alternatives used on Iowa roadway projects and to determine if the current specifications and testing are adequate for providing proper wood preservation. To satisfy the research needs, the project scope involved a literature review, identification of metrics, questionnaire survey of Iowa counties, onsite inspections, and a review of current specifications and testing procedures. Based on the preservative information obtained, the following general conclusions were made: Copper naphthenate is recommended as the plant-applied preservative treatment for timber bridges. Best Management Practices should be followed to ensure quality treatment of timber materials. Bridge maintenance programs need to be developed and implemented. The Iowa Department of Transportation specifications for preservative treatment are the regulating specification for bridges constructed with state or federal funding in Iowa and are also recommended for all other bridges.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

State highway map of Iowa for 2010, produced by Iowa Department of Transportation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) requested a road safety audit (RSA) of the US 59/IA 9 intersection in northwestern Iowa, just south of the Minnesota border, to assess intersection environmental issues and crash history and recommend appropriate mitigation to address the identified safety issues at the intersection. Although the number of crashes at the location has not been significantly higher than the statewide average for similar intersections, the severity of these crashes has been of concern. This RSA was unique in that it included intersection video observation and recorded traffic conflict data analysis, along with the daylight and nighttime field reviews. This report outlines the findings and recommendations of the RSA team for addressing the safety concerns at this intersection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In most highway asset management exercises, real estate used in alignments is considered to be an asset class that does not depreciate. Although the treatment of right of way assets as non-depreciable real property may be appropriate as an accounting exercise, the fact is that the real estate contained in transportation corridors can in fact lose value from a traffic service point of view. Such facilities become functionally obsolete in that they no longer serve the purpose that was intended when they were planned, designed, and built. This report is intended to begin a discussion of the topic of how highway alignments ought be valued as assets as opposed to how they generally are valued, at either book value or replacement value, given it can be shown that some highway alignments do in fact depreciate in value.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document is intended to be a guide for planning-level decisions concerning safety issues and subsequent potential improvements at rural expressway intersections. It is NOT a design guide. It simply presents the gamut of safety treatment options and available strategies that have been employed in an attempt to reduce the number and severity of collisions at unsignalized rural expressway intersections.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abstract: As a part of an innovation project funded by the Federal Highway Administration (FHWA) Highways for LIFE program, a full-depth precast, ultra-high-performance concrete (UHPC) waffle deck panel and appropriate connections suitable for field implementation of waffle decks were developed. Following a successful full-scale validation test on a unit consisting of two panels with various types of connections under laboratory conditions, the waffle deck was installed successfully on a replacement bridge in Wapello County, Iowa. The subsequent load testing confirmed the desirable performance of the UHPC waffle deck bridge. Using the lessons from the completed project and outcomes from a series of simple and detailed finite element analyses of waffle decks, this report was developed to serve as a guide for broadening the design and installation of the UHPC waffle deck panel in new and existing bridges. Following an introduction to UHPC and waffle deck panels and a summary of completed work, this document presents information on waffle deck design, design of connections, redecking using waffle deck panels, and guidance on precast fabrication, construction, and installation of UHPC waffle deck panels.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa State Highway Commission has adopted a number of rigid safety requirements that the Bureau of Public Roads has set forth as standards for road construction. One of these safety requirements is the elimination of two piers on Interstate grade separations, thus leaving two long spans. These longer spans lower the ability of prestressed concrete beams to compete economically with steel beams. In an effort to be more competitive, the prestressing companies have been studying the use of lightweight aggregate in structural concrete.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Soil slope instability concerning highway infrastructure is an ongoing problem in Iowa, as slope failures endanger public safety and continue to result in costly repair work. Volume I of this current study summarizes research methods and findings, while Volume II provides procedural details for incorporating into practice an infrequently-used testing technique–borehole shear tests. Volume III of this study of field investigation of fifteen slopes in Iowa demonstrates through further experimental testing how lateral forces develop along stabilizing piles to resist slope movements. Results establish the feasibility of an alternative stabilization approach utilizing small-diameter pile elements. Also, a step-by-step procedure that can be used by both state and county transportation agencies to design slope reinforcement using slender piles is documented. Initial evidence of the efficiency and cost-effectiveness of stabilizing nuisance slope failures with grouted micropiles is presented. Employment of the remediation alternative is deemed more appropriate for stabilizing shallow slope failures. Overall, work accomplished in this research study included completing a comprehensive literature review on the state of the knowledge of slope stability and slope stabilization, the preparation and performance of fourteen full-scale pile load tests, the analysis of load test results, and the documentation of a design methodology for implementing the technology into current practices of slope stabilization. Recommendations for further research include monitoring pilot studies of slope reinforcement with grouted micropiles, supplementary experimental studies, and advanced numerical studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Several accidents, some involving fatalities, have occurred on U.S. Highway 30 near the Archer Daniels Midland Company (ADM) Corn Sweeteners plant in Cedar Rapids, Iowa. A contributing factor to many of these accidents has been the large amounts of water (vapor and liquid) emitted from multiple sources at ADM's facility located along the south side of the highway. Weather and road closure data acquired from IDOT have been used to develop a database of meteorological conditions preceding and accompanying closure of Highway 30 in Cedar Rapids. An expert system and a FORTRAN program were developed as aids in decision making with regard to closure of Highway 30 near the plant. The computer programs were used for testing, evaluation, and final deployment. Reports indicate the decision tools have been successfully implemented and were judged to be helpful in forecasting road closures and in reducing costs and personnel time in monitoring the roadway.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The SoftPlotter, a soft photogrammetric software and Silicon Graphics workstation, was used to evaluate the accuracy of soft photogrammetry and identify applications of this technology to highway engineering. A comparative study showed that SoftPlotter compares well with other software such as Socket and Integraph. The PC software TNTMips is inexpensive but needs further development to be comparable to SoftPlotter. The Campus Project showed that soft photogrammetry is accurate for traditional photogrammetric applications. It is also accurate for producing orthophoto and base maps for Geographic Information Systems (GISs). The Highway Project showed that soft photogrammetry is accurate for highway engineering and that the technical staff at the Iowa Department of Transportation (IA DOT) can be easily trained in this new technology. The research demonstrated that soft photogrammetry can be used with low-flight helicopter photography for large-scale mapping in highway engineering. The researchers recommend that research be conducted to test the use of digital cameras instead of the traditional aerial cameras in helicopter photography. Research that examines the use of soft photogrammetry with video logging imagery for inventory and GIS studies in highway maintenance is also recommended. Research is also warranted into the integration of soft photogrammetry with virtual reality, which can be used in three-dimensional designing and visualization of highways and subdivisions in real time. The IA DOT owns one analytical plotter and two analogue plotters. The analytical plotter is used for aerial triangulation, and the analogue plotters are used for plotting. However, neither is capable of producing orthophotos. Therefore, the researchers recommend that the IA DOT purchase soft photogrammetric workstations for orthophoto production, and if and when required, use it for aerial triangulation and plotting. In the future, the analogue plotters may become obsolete. At that time, the researchers recommend that the analogue plotters be phased out and replaced by soft photogrammetric workstations.