143 resultados para Fire protection districts


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objective of this study was to evaluate the hydraulic performance of riprap spurs and weirs in controlling bank erosion at the Southern part of the Raccoon River upstream U.S. Highway 169 Bridge utilizing the commercially available model FESWMS and field monitoring. It was found based on a 2 year monitoring and numerical modeling that the design of structures was overall successful, including their spacing and stability. The riprap material incorporated into the structures was directly and favorably correlated to the flow transmission through the structure, or in other words, dictated the permeable nature of the structure. It was found that the permeable dikes and weirs chosen in this study created less volume of scour in the vicinity of the structure toes and thus have less risk comparatively to other impermeable structures to collapse. The fact that the structures permitted the transmission of flow through them it allowed fine sand particles to fill in the gaps of the rock interstices and thus cement and better stabilize the structures. During bank-full flows the maximum scour hole was recorded away from the structures toe and the scourhole size was directly related to the protrusion angle of the structure to the flow. It was concluded that the proposed structure inclination with respect to the main flow direction was appropriate since it provides maximum bank protection while creating the largest volume of local scour away from the structure and towards the center of the channel. Furthermore, the lowest potential for bank erosion also occurs with the present set-up design chosen by the IDOT. About 2 ft of new material was deposited in the area located between the structures for the period extending from the construction day to May 2007. Surveys obtained by sonar and the presence of vegetation indicate that new material has been added at the bank toes. Finally, the structures provided higher variability in bed topography forming resting pools, creating flow shade on the leeward side of the structure, and separation of bed substrate due to different flow conditions. Another notable environmental benefit to rock riprap weirs and dikes is the creation of resting pools, especially in year 2007 (2nd year of the project). The magnitude of these benefits to aquatic habitat has been found in the literature that is directly related to the induced scour-hole volume.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Special investigation of the City of Denison Fire Department for the period July 1, 2005 through March 31, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past, many pier columns were deteriorating due to attack by chlorides. The chloride (from deicers) has attacked the substructures by drainage from the superstructure. Piers supporting grade separation bridges are also subject to chlorides contained in the direct splash from lower level traffic. Repairs of these piers are both difficult and costly. In this project, four different sealants were applied to piers to evaluate their use in the protection of the concrete against chloride-ions. One pier was left untreated to use as a control pier with which to compare the protected piers. This project began in 1980 and was to be completed in 1985, but at that time it was determined further testing was needed to make a more conclusive evaluation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the City of Bloomfield Volunteer Fire Department for the period July 1, 2006 through June 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Gilbert/Franklin Township Fire and Emergency Response Agency for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study was conducted for the purpose of evaluating a new concept for a bank-protection structure: The Iowa Vane . The underlying idea involves countering the torque exerted on the primary flow by its curvature and vertical velocity gradient, thereby eliminating or significantly reducing the secondary flow and thus reducing the undermining of the outer banks and the high-velocity attack on it. The new structure consists of an array of short, vertical, submerged vanes installed with a certain orientation on the channel bed. A relatively small number of vanes can produce bend flows which are practically uniform across the channel. The height of the vanes is less than half the water depth, and their angle with the flow direction is of the order of l0 degrees. In this study, design relations have been established. The relations, and the vanes' overall performance, have been tested in a laboratory model under different flow and sediment conditions. The results are used for the design of an Iowa-Vane bank protection structure for a section of East Nishnabotna River along U.S. Highway 34 at Red Oak, Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The corrosion of reinforcing steel within concrete has always been a problem in construction of bridge decks. With low slump concrete and epoxy rebar, progress has been made in controlling the corrosion. There is concern, however, that the chloride also attacks the substructures, specifically the pier columns. They are subject to chloride attack by chemical deicers in the drainage from the bridge deck. Piers supporting grade separation bridges are also subject to chlorides contained in the direct splash from the lower level traffic. In this project, a field evaluation was conducted to evaluate the effectiveness of commercially available products in preventing chloride intrusion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document was developed for the schools of Iowa to use as a template to enhance current school safety programs; the creation of this document was a partnered effort at the state level between the aforementioned agencies. The purpose of this document is to give school districts and individual schools a planning resource to use when creating their school safety plans. Ultimately, schools can decide how much of this document they would like to incorporate into their current plan. The original document was created by the Minnesota Department of Homeland Security, and its use was granted to Iowa Homeland Security in 2011. Iowa pulled together a panel of experts to make this document specific to Iowa’s schools, and laws. It’s important to note the partnership created by this document is intended to continue through information sharing in relation to critical assets, infrastructure protection, and school safety. Iowa Homeland Security is a representative in the Iowa Department of Public Safety, Division of Intelligence Fusion Center. This partnership allows for streamlined information sharing to the critical infrastructure owner/operators across the state. The current plan for information sharing is through the Iowa Homeland Security and Emergency Management, Threat information and Infrastructure Protection Program (TIIPP) to the Iowa Department of Education for processing and dissemination statewide. Depending on the type of information being released it could be specific to a school, district or the education sector statewide.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This final report to the Iowa Watershed Improvement Review Board by the City of Remsen Utilities consists of accomplishments made by the Remsen Utilities as per this agreement. The City of Remsen Utilities did in fact purchase approximately 27 acres of land lying upstream of the city’s water well field. The land was purchased from Mr. Larry Rodesch and Mr. Rich Harpenau for the purpose of removing nitrates from Remsen’s water source and establishing native prairie grasses to assist in this removal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the City of Woodbine Volunteer Fire Department for the period January 1, 2009 through March 31, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Following is the Operations Manual for the Pennsylvania Ave Bridge over I-235 located in Des Moines, Iowa, which was installed from July 1992 to October 1992. The project uses ELGARD™ 210 Anode Mesh and is divided into 3 zones. Periodic data collection and/or inspection of the cathodic protection system is required to insure proper operation and a long life. This Operation Manual contains a schedule, operation procedures, operation log forms, a rectifier panel drawing, and pertinent reference matenal. Operation procedures and operating records are contained in the body of the manual, while blank operation forms, as built drawings, and pertinent reference material are contained in the appendices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge deck deterioration due to corrosive effect of deicers on reinforcing steel is a major problem facing many agencies. Cathodic protection is one method used to prevent reinforcing steel corrosion. The application of a direct current to the embedded reinforcing steel and a sacrificial anode protects the steel from corrosion. This 1992 project involved placing an Elgard Titanium Anode Mesh Cathodic Protection System on a bridge deck. The anode was fastened to the deck after the Class A repair-work and the overlay was placed using the Iowa Low Slump Dense Concrete System. The system was set up initially at 1 mA/sq ft.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of the 8 Judicial Districts Department of Correctional Services for the period July 1, 2009 through June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge deck and substructure deterioration due to the corrosive effects of deicing chemicals on reinforcing steel is a problem facing many transportation agencies. The main concern is protection of older bridges with uncoated reinforcing steel. Many different methods have been tried over the past years to repair bridge decks. The Iowa system of bridge deck rehabilitation has proven to be very effective. It consists of scarifying the deck surface, removing any deteriorated concrete, and overlaying with low slump dense concrete. Another rehabilitation method that has emerged is cathodic protection. It has been used for many years in the protection of underground pipelines and in 1973 was first installed on a bridge deck. Cathodic protection works by applying an external source of direct current to the embedded reinforcing steel, thereby changing the electrochemical process of corrosion. The corroding steel, which is anodic, is protected by changing it to a cathodic state. The technology involved in cathodic protection as applied to bridge decks has improved over the last 12 years. One company marketing new technology in cathodic protection systems is Raychem Corporation of Menlo Park, California. Their system utilizes a Ferex anode mesh that distributes the impressed direct current over the deck surface. Ferex mesh was selected because it seemed readily adaptable to the Iowa system of bridge deck rehabilitation. The bridge deck would be scarified, deteriorated concrete removed, Ferex anode mesh installed, and overlaid with low slump dense concrete. The Federal Highway Administration (FHWA) promotes cathodic protection under Demonstration Project No. 34, "Cathodic Protection for Reinforced Concrete Bridge Decks."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a Review of the City of Solon Volunteer Fire Department, the Tri-Township Fire Department, and the Solon Firefighters Benevolent Association for the period January 1, 2011 through May 6, 2014