138 resultados para Viability chart for the highway implantation
Resumo:
In order to determine the adequacy with which safety problems on low-volume rural roadways were addressed by the four states of Federal Region VII (Iowa, Kansas, Missouri, and Nebraska), a review was made of the states' safety policies. After reviewing literature dealing with the identification of hazardous locations, evaluation methodologies, and system-wide safety improvements, a survey of the states' safety policies was conducted. An official from each state was questioned about the various aspects and procedures dealing with safety improvements. After analyzing and comparing the remarkably diverse policies, recommendations were made in the form of a model safety program. This program included special modifications that would help remediate hazards on low-volume rural roadways. Especially encouraged is a system-wide approach to improvement which would cover all parts of the highway system, not just urban and high-volume roadways.
Resumo:
In June 1988, 1341 employees of the Iowa State Department of Transportation (DOT) were surveyed via a mailed questionnaire. The sample was selected such that conclusions about all DOT employees, male employees, female employees, majority employees; minority employees, employees under age 40, and employees 40 years of age or older could be made. These sampling characteristics were chosen in order to facilitate comparisons between current DOT employee attitudes and employee attitudes evaluated in 1984. In addition, the sample size and response rates were sufficiently high that conclusions could be made about each of the six districts, the Ames Highway Division, and the Ames complex, excluding the Highway Division. Altogether fifty-five percent (or 739) questionnaires were· returned. Thirty additional employees voluntarily completed the survey, resulting in a final sample size of 769. The survey covered topics related to job satisfaction, work environment or climate, skill utilization, sexual harassment, communication and information adequacy, and morale. The first four topics were evaluated in 198- while the last two were unique to this survey.
Resumo:
The Iowa Statewide Recreational Trails Plan was developed in response to the State Legislature's recognition of the increased public demand for quality outdoor recreational facilities and the numerous benefits associated with the development and usage of trail systems. The plan presents a statewide trails system that will serve as a basis for trail planning efforts throughout the state. Included are design guidelines for each of the major trail modes contained within the plan including bike, hiking, cross-country skiing, snowmobiling, off-road vehicles, and equestrian, as well as for locating trails within the highway right-of-way. Also included are estimates of implementation costs and financing alternatives. This report contains the complete plan. Separately bound documents include the Executive Summary and two additional appendices: (1) Trails Plan Resource Inventory and (2) Summary of Public Comments and Summary of Technical Advisory Committee Comments.
Resumo:
The study analyzes the need for a four-lane highway between St. Louis and St. Paul, and finds it to be needed; it analyzes the highway's feasibility, and finds it to be feasible; it analyzes alternative design standards and suggests that it be built to expressway standards; and, the study evaluates alternative routes and presents four "finalist" routes for your consideration.
Resumo:
The Equipment and Vehicle Revolving Fund report covers all equipment and vehicle purchases through the highway materials and equipment revolving fund during FY 2016.
Resumo:
This report was prepared by a committee of city, county and state representatives. The committee met throughout 2002 with the purpose of reviewing and making recommendations to improve the efficiency and operation of Iowa's road and street system. This report is referenced in SF 451 and in Code Section 306.8A.
Resumo:
Annual Highway Safety Evaluation Report for the Governor's Traffic Safety Bureau, Iowa Department of Public Safety
Resumo:
Annual Highway Safety Evaluation Report for the Governor's Traffic Safety Bureau, Iowa Department of Public Safety
Resumo:
The Seedling Mile in Linn County, Iowa, was part of the Lincoln Highway Association’s so-called “object lesson” program that sought to graphically demonstrate, in the paving of selected one-mile demonstration sections, the benefits of concrete paving to improving road travel across the nation. Constructed in 1918-19, this Seedling Mile became much more than an object lesson and served as something of a battleground between two municipalities—Marion and Cedar Rapids—in their struggle over the county seat and their place on the Lincoln Highway. The Seedling Mile eventually became part of a continuously paved section of the Lincoln Highway between Chicago and Cedar Rapids, with the whole of the Lincoln Highway in Iowa paved in some fashion by the 1930s. In 2002, Linn County reconstructed Mt. Vernon Road from the City of Mt. Vernon to the west end of the Seedling Mile impacting the historic road section. An agreement between concerned government agencies resulted in this publication in partial mitigation of the impact to this historic road section under the guidelines of the National Historic Preservation Act.
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2006
Resumo:
This publication is a guide for parents and guardians of teenagers learning to drive. It should be used with the Iowa Driver’s Manual to aid you in instructing your new driver about how to safely and responsibly operate a motor vehicle. Since the task of driving is affected by changing conditions, this manual does not attempt to cover all situations that may arise. Under Iowa’s graduated driver licensing system young drivers must complete 20 hours of supervised drive time with their parents or guardians during the instruction permit stage and 10 hours during the intermediate license stage. Even though your teenager is taking or has completed driver education in school, there is a great deal of benefit to be obtained from you providing this additional practice time. Learning from your experience and under your guidance, your teenager will apply the rules of the road and more fully understand the risks involved in driving. This will require time and patience on your part, but the effort will result in you knowing that your teenager will be better able to cope with the demands of safe driving. In the back of this manual you will find several pages of diagrams. Use these diagrams to illustrate different driving situations for your teenage driver. Consider taking a notepad and pencil along during your practice sessions for additional drawings. This manual also contains a chart to log your supervised drive time. As your new driver advances through the graduated system you will be required to certify to an Iowa driver’s license examiner that you completed the minimum number of hours of supervised drive time. By becoming involved in the learning driver’s educational process, you are contributing to Iowa’s overall highway safety effort and helping your teenager develop safe driving habits that will last a lifetime.
Resumo:
This report, entitled “Iowa Highway Research Board Research and Development Activities FY 2010” is submitted in compliance with Sections 301.35 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. T is a report of the status of research and development projects in progress on June 20, 2010. It is also a report on projects completed during the fiscal year beginning July 1, 2009, and ending June 30, 2010. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Technology Bureau, Highway Division, Iowa Department of Transportation. All approved reports are also online for viewing at www.iowadot.gov/operationsresearch/reports.aspx
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2007
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2008
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2009