113 resultados para Past experience


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report provides details of IADOT's experience removing and crushing asphaltic concrete and portland cement concrete for recycling. The recycled material was used on interstate highways for the subbase and shoulders. The major problem IADOT encountered on this project was the removal of reinforcing steel from the broken concrete. The contractor used hydraulic powered shears to clip off all protruding steel during the removal and loading of the concrete on the grade. This project took place in 1977.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing safer and more economical bridges at a faster rate with a minimum service life of 75 years and reduced maintenance cost to serve the country’s infrastructure needs. Previous studies have shown that a prefabricated full-depth precast concrete deck system is an innovative technique that accelerates the rehabilitation process of a bridge deck, extending its service life with reduced user delays and community disruptions and lowering its life-cycle costs. Previous use of ultra-high performance concrete (UHPC) for bridge applications in the United States has been considered to be efficient and economical because of its superior structural characteristics and durability properties. Full-depth UHPC waffle deck panel systems have been developed over the past three years in Europe and the United States. Subsequently, a single span, 60-ft long and 33-ft wide prototype bridge with full-depth prefabricated UHPC waffle deck panels has been designed and built for a replacement bridge in Wapello County, Iowa. The structural performance characteristics and the constructability of the UHPC waffle deck system and its critical connections were studied through an experimental program at the structural laboratory of Iowa State University (ISU). Two prefabricated full-depth UHPC waffle deck (8 feet by 9 feet 9 inches by 8 inches) panels were connected to 24-ft long precast girders, and the system was tested under service, fatigue, overload, and ultimate loads. Three months after the completion of the bridge with waffle deck system, it was load tested under live loads in February 2012. The measured strain and deflection values were within the acceptable limits, validating the structural performance of the bridge deck. Based on the laboratory test results, observations, field testing of the prototype bridge, and experience gained from the sequence of construction events such as panel fabrication and casting of transverse and longitudinal joints, a prefabricated UHPC waffle deck system is found to be a viable option to achieve the goals of the AASHTO strategic plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the past several year Kossuth County has had a scheduled maintenance program of bituminous seal coating. This program has been used to maintain the 467 miles of asphaltic concrete surfaced roads in Kossuth County. Since most of the experience that Kossuth County had in seal coating was with cutback asphalt, it was decided to include the use of emulsified asphalt in Kossuth County's 1980 seal coat program. Federal Demonstration Project Funds were requested from the Federal Highway Administration to study the use of emulsified asphalt and funding was granted under Demonstration Project No. 55,:Asphalt Emulsions for Highway Construction." Items studied were design and construction procedure cost of alternate material, energy consumption and environmental considerations. A construction contract was awarded to Everds Brothers, Inc. of Algona, Iowa, on July 1, 1980. There were four bidders on the 54.5 miles of seal coating that was let. A map showing the location of the seal coating projects is shown in Appendix A, and a copy of the contract is shown in Appendix B. The contractor started the project on July 11, 1980 and completed the project on August 1, 1980. Construction inspection and follow-up inspections of the project were conducted by personnel of the Kossuth County Engineer's Office and testing of the materials, friction testing and road rater testing were conducted by the Material's Department of the Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction: As part of the roadside development along the Interstate Highway System, the Iowa State Highway Commission has constructed eight pair of rest area facilities. Furthermore, two pair are presently under construction with an additional two pair proposed for letting in 1967. An additional nine and one-half pairs of rest areas are in the planning phase, a grand total of 45 rest Brea buildings. The facilities existing were planned and designed in a relatively short period of time. The rest area facilities are unusual in terms of water use, water demand rates, and the fact that there are no applicable guidelines from previous installations. Such facilities are a pioneering effort to furnish a service -which the travelling public desires and will use. The acceptance and current use of the existing facilities shows that the rest areas do provide a service the public will use and appreciate. The Iowa State Highway Commission is to be congratulated for this· pioneering effort. However there are problems, as should be expected when design of a new type of facility has no past operating experience to use as a guide. Another factor which enters is that a rest area facility is quite different and rather unrelated to engineering in the highway field of practice. Basically, the problems encountered can be resolved into several areas, namely 1) maintenance problems in equipment due to 2) insufficient capacity of several other elements of the water systems, and 3) no provisions for water quality control. This study and report is supposed to essentially cover the review of the rest areas, either existing and under construction or letting. However, the approach used has been somewhat different. Several basic economically feasible water system schemes have been developed which are· adaptable to the different well capacities and different water qualities encountered. These basic designs are used as a guide in recommending modifications to the existing rest area water systems, anticipating that the basic designs will be used for future facilities. The magnitude of the problems involved is shown by the fact that the projected water use and demand variations of each rest area building is equivalent to the water supply for a community of about 100 people. The problems of proper operation and maintenance of an eventual thirty to forty-five such facilities are gigantic. For successful operation the rest area water systems must have a high degree of standardization and interchangeability of all elements of the water systems, even if it means a limited degree of over-design in some rest area facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

3D engineered modeling is a relatively new and developing technology that can provide numerous benefits to owners, engineers, contractors, and the general public. This manual is for highway agencies that are considering or are in the process of switching from 2D plan sets to 3D engineered models in their highway construction projects. It will discuss some of the benefits, applications, limitations, and implementation considerations for 3D engineered models used for survey, design, and construction. Note that is not intended to cover all eventualities in all states regarding the deployment of 3D engineered models for highway construction. Rather, it describes how one state—Iowa—uses 3D engineered models for construction of highway projects, from planning and surveying through design and construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document looks at some of Iowa’s more comprehensive, statewide water planning efforts that addressed all aspects of water or a major water issue such as water quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for the Iowa Veterans Home. To provide a continuum of care to Iowa’s veterans and their spouses in an environment focusing on individualized services to enhance their quality of life.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Heart disease is the number one cause of death for both men and women nationally as well as in the state of Iowa, while stroke is the third leading cause of death. These two diseases are often grouped together under the broader term ―cardiovascular disease‖ (CVD), which accounts for one-third of all deaths within the state. Ongoing efforts to increase prevention of, and improve care for, those who experience CVD have resulted in a decline in the number of deaths in Iowa caused by these conditions. In 1991, the death rate as a result of cardiovascular disease was 344.9 per 100,000 people; by 2006, that number had fallen to 239.9. Deaths as a result of stroke have also dropped, from 74.7 in 1991 to 57.4 in 2006.1 Although progress has been made; these illnesses are still major causes of death and serious disability for many Iowans. Despite the fact that some progress has been made through past efforts, current data show that the journey must continue to achieve the long, quality filled lives that Iowans deserve, free of chronic disease. Up to this point, there has been a lack of involvement by stakeholders against heart disease and stroke in Iowa. Causes of CVD are largely known and preventable, and more must be done to educate and spread this information throughout the state. This comprehensive statewide plan is a call to action to improve prevention, treatment, and management of heart disease and stroke in Iowa. Through the commitment and collaborative efforts of many, the Iowa Comprehensive Heart Disease and Stroke Plan 2010-2014 provides a guide to improve the health status of all Iowans. The people of Iowa have a long history of working together to do the right thing. We must rise to the challenge of lowering the incidence of heart disease and stroke through early and ongoing education that stresses prevention and healthy lifestyle choices, medical services that provide evidence-based, effective treatment and long term care management without disparity, and environmental policies that support the prevention of heart disease and stroke in our schools, work sites, and communities. This strategic plan is a guide to improving cardiovascular health in Iowa through 2014.