249 resultados para Highway
Resumo:
This report describes the highway construction program, actual expenditures of the program and contractual obligations of the program for FY 2014.
Resumo:
The planning, construction and maintenance of its highways is the state's second highest business, next only to education. Of the nearly 113,090 miles of roads and streets in Iowa, the 10,271 miles in the Interstate and primary system are the direct responsibility of the Highway Commission.From its central headquarters in Ames, the Commission coordinates its statewide activities through facilities located in each of the 99 counties. These include six district offices, 47 resident offices and 165 maintenance garages.
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa State Highway Commission exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway.
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa State Highway Commission exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1973 revision to 1970 policy.)
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa Department of Transportation exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1985 revision to 1973 policy.)
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa Department of Transportation exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1990 revision to 1985 policy.)
Resumo:
This chapter covers initial placement, adjustment, improvement, relocation, replacement and maintenance of utility facilities in, on, above or below the right-of-way over of primary highways, including attachments to primary highway structures. It embodies the basic specifications and standards needed, to ensure the safety of the highway user and the integrity of the highway. (1992 revision to 1990 policy.)
Resumo:
The Highway Safety Manual is the national safety manual that provides quantitative methods for analyzing highway safety. The HSM presents crash modification factors related to work zone characteristics such as work zone duration and length. These crash modification factors were based on high-impact work zones in California. Therefore there was a need to use work zone and safety data from the Midwest to calibrate these crash modification factors for use in the Midwest. Almost 11,000 Missouri freeway work zones were analyzed to derive a representative and stratified sample of 162 work zones. The 162 work zones was more than four times the number of work zones used in the HSM. This dataset was used for modeling and testing crash modification factors applicable to the Midwest. The dataset contained work zones ranging from 0.76 mile to 9.24 miles and with durations from 16 days to 590 days. A combined fatal/injury/non-injury model produced a R2 fit of 0.9079 and a prediction slope of 0.963. The resulting crash modification factors of 1.01 for duration and 0.58 for length were smaller than the values in the HSM. Two practical application examples illustrate the use of the crash modification factors for comparing alternate work zone setups.
Resumo:
This report, entitled Iowa Highway Research and Development Activities FY2014 is submitted in compliance with Iowa Code sections 310.36 and 312.3A, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in process on June 20, 2014. It is also a report on projects completed during the fiscal year beginning July 1, 2013 and ending June 30, 2014. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at: http://www.iowadot.gov/research/pdf/IHRBAnnualReport.pdf.
Resumo:
Brief summaries of achievement and important events of the Iowa State Highway Commission and transportation engineering in Iowa, between 1904 and 1971.
Resumo:
The booklet tells the history of the construction of the Iowa Highway 376 Bridge within the context of significant modernization and expansion of the highway system in Iowa in the 1950s. Curvy, narrow highways were widened and straightened and narrow iron truss bridges were replaced with more modern concrete and steel structures, changing the landscape of rural Iowa. Bridge engineer Herbert A Arthur, who designed the Iowa Highway 376 Bridge, was a prolific bridge engineer in the 1950s. This booklet serves to inform the public of this significant aspect of Iowa transportation history.
Resumo:
The goal of this project was to provide an objective methodology to support public agencies and railroads in making decisions related to consolidation of at-grade rail-highway crossings. The project team developed a weighted-index method and accompanying Microsoft Excel spreadsheet based tool to help evaluate and prioritize all public highway-rail grade crossings systematically from a possible consolidation impact perspective. Factors identified by stakeholders as critical were traffic volume, heavy-truck traffic volume, proximity to emergency medical services, proximity to schools, road system, and out-of-distance travel. Given the inherent differences between urban and rural locations, factors were considered, and weighted, differently, based on crossing location. Application of a weighted-index method allowed for all factors of interest to be included and for these factors to be ranked independently, as well as weighted according to stakeholder priorities, to create a single index. If priorities change, this approach also allows for factors and weights to be adjusted. The prioritization generated by this approach may be used to convey the need and opportunity for crossing consolidation to decision makers and stakeholders. It may also be used to quickly investigate the feasibility of a possible consolidation. Independently computed crossing risk and relative impact of consolidation may be integrated and compared to develop the most appropriate treatment strategies or alternatives for a highway-rail grade crossing. A crossing with limited- or low-consolidation impact but a high safety risk may be a prime candidate for consolidation. Similarly, a crossing with potentially high-consolidation impact as well as high risk may be an excellent candidate for crossing improvements or grade separation. The results of the highway-rail grade crossing prioritization represent a consistent and quantitative, yet preliminary, assessment. The results may serve as the foundation for more rigorous or detailed analysis and feasibility studies. Other pertinent site-specific factors, such as safety, maintenance costs, economic impacts, and location-specific access and characteristics should be considered.
Resumo:
The Iowa Department of Transportation (DOT) is responsible for approximately 4,100 bridges and structures that are a part of the state’s primary highway system, which includes the Interstate, US, and Iowa highway routes. A pilot study was conducted for six bridges in two Iowa river basins—the Cedar River Basin and the South Skunk River Basin—to develop a methodology to evaluate their vulnerability to climate change and extreme weather. The six bridges had been either closed or severely stressed by record streamflow within the past seven years. An innovative methodology was developed to generate streamflow scenarios given climate change projections. The methodology selected appropriate rainfall projection data to feed into a streamflow model that generated continuous peak annual streamflow series for 1960 through 2100, which were used as input to PeakFQ to estimate return intervals for floods. The methodology evaluated the plausibility of rainfall projections and credibility of streamflow simulation while remaining consistent with U.S. Geological Survey (USGS) protocol for estimating the return interval for floods. The results were conveyed in an innovative graph that combined historical and scenario-based design metrics for use in bridge vulnerability analysis and engineering design. The pilot results determined the annual peak streamflow response to climate change likely will be basin-size dependent, four of the six pilot study bridges would be exposed to increased frequency of extreme streamflow and would have higher frequency of overtopping, the proposed design for replacing the Interstate 35 bridges over the South Skunk River south of Ames, Iowa is resilient to climate change, and some Iowa DOT bridge design policies could be reviewed to consider incorporating climate change information.
Resumo:
Although extensive research has been conducted on urban freeway capacity estimation methods, minimal research has been carried out for rural highway sections, especially sections within work zones. This study attempted to fill that void for rural highways in Kansas, by estimating capacity of rural highway work zones in Kansas. Six work zone locations were selected for data collection and further analysis. An average of six days’ worth of field data was collected, from mid-October 2013 to late November 2013, at each of these work zone sites. Two capacity estimation methods were utilized, including the Maximum Observed 15-minute Flow Rate Method and the Platooning Method divided into 15-minute intervals. The Maximum Observed 15-minute Flow Rate Method provided an average capacity of 1469 passenger cars per hour per lane (pcphpl) with a standard deviation of 141 pcphpl, while the Platooning Method provided a maximum average capacity of 1195 pcphpl and a standard deviation of 28 pcphpl. Based on observed data and analysis carried out in this study, the suggested maximum capacity can be considered as 1500 pcphpl when designing work zones for rural highways in Kansas. This proposed standard value of rural highway work zone capacity could be utilized by engineers and planners so that they can effectively mitigate congestion at or near work zones that would have otherwise occurred due to construction/maintenance.
Resumo:
The Iowa State Highway Commission initiated this research to evaluate a new lowering device for tower luminaires and a new concept of tower luminaire light distribution. Lighting at the West interchange of I-80, I-35, and I-235 in Polk County was also designated as an FHWA experimental project. As highway lighting has become more widely used, highway officials recognized the increasing importance of reducing safety hazards and improving aesthetic appearance of lighting installations. Also, lighting construction, energy, and maintenance costs were absorbing a larger share of the maintenance budget. A search began for a method of lighting whereby the fixed objects by the roadside could be eliminated or reduced in number, the costs could be reduced and the quality of lighting improved over existing methods. Lack of design data in this area illustrated the need for research.