588 resultados para HR Planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this report, sixteen secondary and primary bridge standards for two types of bridges are rated for AASHTO HS20-44 vehicle configuration utilizing Load Factor methodology. The ratings apply only to those bridges which: (1) are built according to the applicable bridge standard plans, (2) have no structural deterioration or damage, and (3) have no added wearing surface in excess of one-half inch integral wearing surface.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the results of surveys to determine studded tire usage in Iowa. Also reported are the results of measurements of transverse pavement profiles at selected locations where the pavement is subjected to a high volume of traffic. The surveys were made in January of each of the years 1969 through 1978 and in each of 27 areas into which the state was divided. Estimates of studded tire usage were also made at various locations on Interstate highways in Iowa. The lowest percentage of studded tires was observed in the initial count during the winter of 1968-69. Two years later the percentage had increased to the maximum (22.6%) and then began a gradual decline. The latest count in January of 1978 indicated 8.5% of the cars had studded tires. The decline in the use of studded tires is attributed to the efforts of the Iowa DOT and others to obtain a ban on studded tires and a continual increase in the use of radial tires with claims of improved traction. The wear measurements were recorded by camera. It was found that studded tires have worn ruts in Iowa pavements as deep as 5/16 inch. The ruts lead to water on the pavement and this causes hydroplaning, as well as splash and spray. The conclusion of the study was that studded tires should be banned in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Improving the aggregate gradation for a portland cement concrete mix may result in higher compressive strengths. With an improved gradation, the cement factor may be reduced to achieve a more economical concrete mix since cement is the most expensive component in a Portland cement concrete mix. This project located on I-80 westbound in Scott County, Iowa examined three different mixes. 1. Standard Class C mix with project aggregates. 2. Standard Class C mix with an improved aggregate gradation. 3. Standard Class C mix with an improved aggregate gradation and 10% cementitious reduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. The research reported here was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is volume 1 of the final report on the Comprehensive Plan for the City of Boone. Contained in this report are reproductions of the important maps and charts prepared in connection with this study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concept of cracking and seating a portland cement concrete (pcc) pavement prior to laying an asphalt cement concrete (acc) surface in order to reduce reflection cracking has been around since the 1950s. With the advent of improved cracking equipment, this method gained renewed interest in the 1970s and 1980s. This project incorporated six test sections of which four were cracked and seated prior to being overlaid. Fremont County decided to utilize only a 0.9 m (3 ft) cracking pattern based on a 30 m (100 ft) trial test section. Pavement cracking appeared to be effective in reducing primarily longitudinal reflectance cracking, but only marginally successful in the reduction of transverse reflective cracking.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Experience has shown that milling machines with carbide tipped teeth have the capability of profiling most asphalt concrete (ac) and portland cement concrete (pcc) pavements. Most standard milling operations today leave a very coarse, generally objectionable surface texture. This research utilized a Cedarapids Wirtgen 1900C mill modified by adding additional teeth. There were 411 teeth at a 5 millimeter transverse spacing (standard spacing is 15 mm) on a 6 ft. 4 in. long drum. The mill was used to profile and texture the surface of one ac and two pcc pavements. One year after the milling operation there is still some noticeable change in tire noise but the general appearance is good. The milling operation with the additional teeth provides an acceptable surface texture with improved Friction Numbers when compared to a nonmilled surface.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Multiplan spreadsheet solutions were developed for a set of hydraulic and highway engineering computations of common interest to county engineers. These include earthwork, vertical and horizontal curves, staking superelevated curves and sign inventories for highways. The hydraulic applications were ditch flow, runoff, culvert size and stage discharge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An automatic system was designed to concurrently measure stage and discharge for the purpose of developing stage-discharge ratings and high flow hydrographs on small streams. Stage, or gage height, is recorded by an analog-to-digital recorder and discharge is determined by the constant-rate tracer-dilution method. The system measures flow above a base stage set by the user. To test the effectiveness of the system and its components, eight systems, with a variety of equipment, were installed at crest-stage gaging stations across Iowa. A fluorescent dye, rhodamine-WT, was used as the tracer. Tracer-dilution discharge measurements were made during 14 flow periods at six stations from 1986 through 1988 water years. Ratings were developed at three stations with the aid of these measurements. A loop rating was identified at one station during rapidly-changing flow conditions. Incomplete mixing and dye loss to sediment apparently were problems at some stations. Stage hydrographs were recorded for 38 flows at seven stations. Limited data on background fluorescence during high flows were also obtained.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was conducted in an attempt to determine the cause of paste strength variability in Iowa fly ashes and to develop test methods to more adequately reflect fly ash physical and chemical characteristics. An extensive three year sampling and testing program was developed and initiated which incorporated fly ash from several Iowa power plants. Power plant design and operating data were collected. The variability was directly linked to power plant maintenance schedules and to sodium carbonate coal pretreatment. Fly ash physical and chemical properties can change drastically immediately before and after a maintenance outage. The concentrations of sulfate bearing minerals in the fly ash increases sharply during shutdown. Chemical, mineralogical, and physical testing indicated that the sodium, sulfate bearing minerals, lime and tricalcium aluminate contents of the fly ashes play important roles in the development of hydration reaction products in fly ash pastes. The weak pastes always contained ettringite as the major reaction product. The strong pastes contained straetlingite and monosulfoaluminate as the major reaction products along with minor amounts of ettringite. Recommendations for testing procedure changes and suggested interim test methods are presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research was conducted to investigate the potential of strengthening continuous bridges by post-tensioning. The study included the following: a literature review, selection and rating of a prototype continuous composite bridge, tests of a one-third-scale continuous composite bridge model, finite element analysis of the bridge model, and tests of a full-scale composite beam mockup for a negative moment region. The study results indicated that the strengthening of continuous, composite bridges is feasible. The primary objective in applyig the post-tensioning should be to provide moments opposite to those produced by live and dead loads. Longitudinal distribution of that post-tensioning always must be considered if only exterior or only interior beams are post-tensioned. Testing and finite element analysis showed that post-tensioning of positive moment regions with straight tendons was more effective than post-tensioning negative moment regions with straight tendons. Changes in tension in tendons may be either beneficial or detrimental when live loads are applied to a strengthened bridge and thus must be carefully considered in design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Roller compacted concrete (RCC) is a zero slump portland cement concrete mixture that has been used since the early 1970's in massive concrete structures. Iowa Highway Research Board project HR-300 was established to determine if this type mix could be used to pave roads on the Iowa road system. Manatt's Inc. of Brooklyn, Iowa agreed to pave an 800 ft. x 22 ft. x 10 in. section of RCC pavement in their Ames construction yard. This report discusses the construction of the test slab and interprets test results conducted during and after construction. It was observed that RCC can be placed with conventional asphalt paving equipment. However, there are several problems with RCC paving which must be resolved before RCC can become a viable paving alternative on Iowa's roadway system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The need for upgrading a large number of understrength and obsolete bridges in the United States has been well documented in the literature. Through the performance of several Iowa DOT projects, the concept of strengthening bridges (simple and continuous spans) by post-tensioning has been developed. The purpose of this project was to investigate two additional strengthening alternatives that may be more efficient than post-tensioning in certain situations. The research program for each strengthening scheme included a literature review, laboratory testing of the strengthening scheme, and a finite-element analysis of the scheme. For clarity the two strengthening schemes are presented separately. In Part 1 of this report, the strengthening of existing steel stringers in composite steel beam concrete-deck bridges by providing partial end restraint was shown to be feasible. Part 2 of this report summarizes the research that was undertaken to strengthen the negative moment regions of continuous, composite bridges. Two schemes were investigated: post-compression of stringers and superimposed trusses within the stringers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An expert system has been developed that provides 24 hour forecasts of roadway and bridge frost for locations in Iowa. The system is based on analysis of frost observations taken by highway maintenance personnel, analysis of conditions leading to frost as obtained from meteorologists with experience in forecasting bridge and roadway frost, and from fundamental physical principles of frost processes. The expert system requires the forecaster to enter information on recent maximum and minimum temperatures and forecasts of maximum and minimum air temperatures, dew point temperatures, precipitation, cloudiness, and wind speed. The system has been used operationally for the last two frost seasons by Freese-Notis Associates, who have been under contract with the Iowa DOT to supply frost forecasts. The operational meteorologists give the system their strong endorsement. They always consult the system before making a frost forecast unless conditions clearly indicate frost is not likely. In operational use, the system is run several times with different input values to test the sensitivity of frost formation on a particular day to various meteorological parameters. The users comment. that the system helps them to consider all the factors relevant to frost formation and is regarded as an office companion for making frost forecasts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The need to upgrade a large number of understrength and obsolete bridges in the U.S. has been well documented in the literature. Through several Iowa DOT projects, the concept of strengthening simple-span bridges by post-tensioning has been developed. The purpose of the project described in this report was to investigate the use of post-tensioning for strengthening continuous composite bridges. In a previous, successfully completed investigation, the feasibility of strengthening continuous, composite bridges by post-tensioning was demonstrated on a laboratory 1/3-scale-model bridge (3 spans: 41 ft 11 in. x 8 ft 8 in.). This project can thus be considered the implementation phase. The bridge selected for strengthening was in Pocahontas County near Fonda, Iowa, on County Road N28. With finite element analysis, a post-tensioning system was developed that required post-tensioning of the positive moment regions of both the interior and exterior beams. During the summer of 1988, the strengthening system was installed along with instrumentation to determine the bridge's response and behavior. Before and after post-tensioning, the bridge was subjected to truck loading (1 or 2 trucks at various predetermined critical locations) to determine the effectiveness of the strengthening system. The bridge, with the strengthening system in place, was inspected approximately every three months to determine any changes in its appearance or behavior. In 1989, approximately one year after the initial strengthening, the bridge was retested to identify any changes in its behavior. Post-tensioning forces were removed to reveal any losses over the one-year period. Post-tensioning was reapplied to the bridge, and the bridge was tested using the same loading program used in 1988. Except for at a few locations, stresses were reduced in the bridge the desired amount. At a few locations flexural stresses in the steel beams are still above 18 ksi, the allowable inventory stress for A7 steel. Although maximum stresses are above the inventory stress by about 2 ksi, they are about 5 ksi below the allowable operating stress; therefore, the bridge no longer needs to be load-posted.