118 resultados para Adjustment Costs


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Density is an important component of hot-mix asphalt (HMA) pavement quality and long-term performance. Insufficient density of an in-place HMA pavement is the most frequently cited construction-related performance problem. This study evaluated the use of electromagnetic gauges to nondestructively determine densities. Field and laboratory measurements were taken with two electromagnetic gauges—a PaveTracker and a Pavement Quality Indicator (PQI). Test data were collected in the field during and after paving operations and also in a laboratory on field mixes compacted in the lab. This study revealed that several mix- and project-specific factors affect electromagnetic gauge readings. Consequently, the implementation of these gauges will likely need to be done utilizing a test strip on a project- and mix-specific basis to appropriately identify an adjustment factor for the specific electromagnetic gauge being used for quality control and quality assurance (QC/QA) testing. The substantial reduction in testing time that results from employing electromagnetic gauges rather than coring makes it possible for more readings to be used in the QC/QA process with real-time information without increasing the testing costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We develop a real option model of the irreversible native grassland conversion decision. Upon plowing, native grassland can be followed by either a permanent cropping system or a system in which land is put under cropping (respectively, grazing) whenever crop prices are high (respectively, low). Switching costs are incurred upon alternating between cropping and grazing. The effects of risk intervention in the form of crop insurance subsidies are studied, as are the effects of cropping innovations that reduce switching costs. We calibrate the model by using cropping return data for South Central North Dakota from 1989 to 2012. Simulations show that a risk intervention that offsets 20% of a cropping return shortfall increases the sod-busting cost threshold, below which native sod will be busted, by 41% (or $43.7/acre). Omitting cropping return risk across time underestimates this sod-busting cost threshold by 23% (or $24.35/acre), and hence underestimates the native sod conversion caused by crop production.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This technical brief summarizes information about the costs and benefits that have been attributed to use of hybrid transit buses as found in the literature. Results from a demonstration project that compared fuel economy and emissions for 12 hybrid buses and 7 control buses for the transit agency for Ames, Iowa and Iowa State University, CyRide, were also included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter covers initial placement, adjustment, and maintenance of utility facilities in, on, above or below the right-of-way of primary highways, including attachments to primary highway structures. It embodies the basic specifications and standards needed to ensure the safety of the highway user and the integrity of the highway. (2012 revision to 2005 policy.)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter covers initial placement, adjustment, and maintenance of utility facilities in, on, above or below the right-of-way of primary highways, including attachments to primary highway structures. It embodies the basic specifications and standards needed, to ensure the safety of the highway user and the integrity of the highway. (2005 revision to 1992 policy.)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review provides background on the establishment of full-time-equivalent, or FTE, positions and examines how FTE positions are used in the state's budgeting process. This issue review also provides historical information regarding FTE positions and personnel costs and the current status and outlook of FTE positions and salary expenditures for fiscal year 2011. In addition, this issue review outlines the new requirements included in Senate File 2088, Government Reorganization Efficiency Act, that will impact FTE levels and expenditure of salary dollars for fiscal 2011.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review examines the change in the number of executive branch employees, supervisors and payroll between January 2011 and August 2012. In recent years, a variety of factors have encouraged a reduction in the number of state employees, salary adjustment that pays for contract-related salary and benefits increases has not been funded, limited departments' ability to pay increasing personnel costs. Early retirement packages have been offered, encouraging higher-paid employees to retire. Beginning in January 2011, the Governor set a goal of reducing the cost of state government by 15 percent, which could impact the number of employees.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review provides updated information on an issue review published in December 2010, concerning the full-time-equivalent, or FTE, positions in state government. The background information provides a general explanation and understanding of the various aspects of FTE positions. This issue review includes year-end FTE and salary data for fiscal year 2011 and compares the data to prior years.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review provides information on the Department of Corrections construction and of proposed staffing for additional beds in the prison system and community-based corrections.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A computer program to adjust roadway profiles has been developed to serve as an aid to the county engineers of the State of Iowa. Many hours are spent reducing field notes and calculating adjusted roadway profiles to prepare an existing roadway for paving that will produce a high quality ride and be as maintenance free as possible. Since the computer is very well adapted to performing long tedious tasks; programming this work for a computer would result in freeing the engineer of these tasks. Freed from manual calculations, the engineer is able to spend more time in solving engineering problems. The type of roadway that this computer program is designed to adjust is a road that at sometime. in its history was graded to a finished subgrade. After a period of time, this road is to receive a finished paved surface. The problem then arises whether to bring the existing roadway up to the de signed grade or to make profile adjustments and comprise between the existing and the design profiles. In order to achieve the latter condition using this program, the engineer needs to give the computer only a minimum amount of information.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the results of a survey on the use of yellow versus white traffic paint. It was found that in most states the white paint was less expensive than the yellow. A substantial savings could be realized if an all white traffic marking system was permitted by the Federal Highway Administration. Paint costs from each state are presented, as well as by each region.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is a study of the costs, benefits and impacts of dredging programs for eight Iowa Lakes: Backbone Lake, Black Hawk Lake, Blue Lake, Five Island Lake, Lake Manawa, Mill Creek Lake, Rock Lake and Silver Lake. The studies were done by Economics Research Associates (ERA) and Engineering Consultants, Inc. (ECI) and was commissioned by the Iowa General Assembly to assist in determining public policy with respect to the dredging of the subject lakes.