98 resultados para fed funds rate


Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the key statistics that Iowa Corrections maintains to measure the success of our efforts is the three-year return-to-prison rate for offenders leaving prison and reentering the community. As the chart below shows, the rate for the three-year period from FY 2009 through FY 2012 is the lowest since this measure has been calculated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Office of Auditor of State's letter reporting the results of its evaluation of whether the Office of Secretary of State may appropriately use funds received under the Help America Vote Act

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa's county road system serves many critical functions in a changing environment. Many counties with very different social, economic, and demographic circumstances do not have adequate resources to provide the desired level of service on their secondary road systems. How the state's Road Use Tax Fund (RUTF) is distributed among counties is therefore of great importance. This report presents the results of a year-long study of how to distribute RUTF resources among Iowa's 99 counties. The project was undertaken at the request of county engineers who wish to replace the current method of allocation with one that is more stable, comprehensible, and predictable. This report describes the current allocation method, examines how other states distribute road funds to counties, and discusses potential allocation factors that could be included in a revised procedure. The process undertaken to narrow the range of possible formulas and determine the one to recommend is summarized. Finally, the report presents the allocation formula recommended by the project advisory committee, along with how it would operate.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report discusses the asphalt pavement recycling project designated Project HR-188 in Kossuth County, Iowa. Specific objectives were: (a) to determine the effectiveness of drum mixing plant modifications designed to control air pollution within limits specified by the Iowa Department of Environmental Quality; (b) to assess the impact of varying the proportions of recycled and virgin aggregates, (c) to assess the impact of varying the production rate of the plant, and (d) to assess the impact of varying the mixing temperature. The discussion includes information on the proposed use of research funds, project location and description, the project planning conference, plan development, bid letting, asphalt plant configuration, actual plant operation, why this method is successful, probable process limitations, pollution results, recycled pavement test results, and the cost of virgin vs. recycled asphalt pavements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2002, Senate File 2318, Insurance Premium Tax Reduction Act, the Iowa General Assembly approved a reduction in the insurance premium tax rate from 2 percent to 1 percent. The reduction was phased in at the rate of 1/4 percent annual increments over a five-year period, beginning with life and health insurance policy payments made on or after January 1st, 2003. Calendar year 2007 was the first year all premiums were taxed at 1 percent and fiscal year 2008 was the first full fiscal year at the 1 percent rate. Insurance premiums tax is paid only by insurance companies. The companies that benefit from the tax reduction are uniquely identified in government employment statistics. This allows for a unique opportunity to evaluate both the revenue impact and the employment impact of the tax rate reduction in Senate File 2318. This issue review focuses on the General Fund revenue impact of the rate reduction and the Iowa employment trends for the insurance industry since the rate reduction legislation was approved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A two-stage mixing process for concrete involves mixing a slurry of cementitious materials and water, then adding the slurry to coarse and fine aggregate to form concrete. Some research has indicated that this process might facilitate dispersion of cementitious materials and improve cement hydration, the characteristics of the interfacial transition zone (ITZ) between aggregate and paste, and concrete homogeneity. The goal of the study was to find optimal mixing procedures for production of a homogeneous and workable mixture and quality concrete using a two-stage mixing operation. The specific objectives of the study are as follows: (1) To achieve optimal mixing energy and time for a homogeneous cementitious material, (2) To characterize the homogeneity and flow property of the pastes, (3) To investigate effective methods for coating aggregate particles with cement slurry, (4) To study the effect of the two-stage mixing procedure on concrete properties, (5) To obtain the improved production rates. Parameters measured for Phase I included: heat of hydration, maturity, and rheology tests were performed on the fresh paste samples, and compressive strength, degree of hydration, and scanning electron microscope (SEM) imaging tests were conducted on the cured specimens. For Phases II and III tests included slump and air content on fresh concrete and compressive and tensile strengths, rapid air void analysis, and rapid chloride permeability on hardened concrete.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Based on previous National Bridge Inventory data, the state of Iowa has nearly 20,000 bridges on low-volume roads (LVRs). Thus, these bridges are the responsibility of the county engineers. Of the bridges on the county roads, 24 percent are structurally deficient and 5 percent are functionally obsolete. A large number of the older bridges on the LVRs are built on timber piling with timber back walls. In many cases, as timber abutments and piers age, the piling and back wall planks deteriorate at a rate faster than the bridge superstructure. As a result, a large percentage of the structurally deficient bridges on LVRs are classified as such because of the condition of the timber substructure elements. As funds for replacing bridges decline and construction costs increase, effective rehabilitation and strengthening techniques for extending the life of the timber substructures in bridges with structurally sound superstructures has become even more important. Several counties have implemented various techniques to strengthen/repair damaged piling, however, there is minimal data documenting the effectiveness of these techniques. There are numerous instances where cracked and failed pilings have been repaired. However, there are no experimental data on the effectiveness of the repairs or on the percentage of load transferred from the superstructure to the sound pile below. To address the research needs, a review and evaluation of current maintenance and rehabilitation methods was completed. Additionally, a nationwide survey was conducted to learn the methods used beyond Iowa. Field investigation and live-load testing of bridges with certain Iowa methods was completed. Lastly, laboratory testing of new strengthening and rehabilitation methods was performed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.