118 resultados para tort liability volunteer
Resumo:
Summary of Project AWARE in 2010 on the Nishnabotna River.
Resumo:
Summary of Project AWARE, a volunteer river cleanup, which was held on the Turkey River in 2011.
Resumo:
Summary of Project AWARE, volunteer river cleanup, which was held on the Iowa River in 2012.
Resumo:
Summary of Project AWARE, volunteer river cleanup, held in 2013 on the Des Moines River.
Resumo:
Summary of Project AWARE on the Big Sioux River in 2014. Project AWARE is a volunteer river cleanup event.
Resumo:
Summary of the IOWATER Program and workshops offered.
Resumo:
The Crop Progress and Condition Report is made possible by the dedication of our volunteer Crop Progress Reporters. A review of Iowa crop land with charts and graphs.
Resumo:
The Dry Run Creek Watershed received a biological impairment in 2002 after sampling conducted by the Department of Natural Resources revealed a lack in the diversity and abundance of aquatic life along a 2.8 mile reach of stream along the Southwest Branch. Among the primary stressors identified were hydrologic change, increased stormsewer inputs, lack of available habitat, and sedimentation. Goals put forth by the Watershed Management Plan and the preliminary Total Maximum Daily Load (TMDL) study center around the reduction in storm sewer inputs. The goal set forth by the TMDL is the reduction of connected impervious surface (CIS) to 10% in each of the creek’s subwatersheds as a surrogate for other stressors. Grant funding is being sought for the construction of two bioretention cells and a green roof to treat the first flush of runoff from a new 400 unit student housing structure and connected parking surfaces totaling 5.16 acres. In addition, a monitoring program will continue to be coordinated through a partnership with the Department of Natural Resources IOWATER program and locally led volunteer efforts which will allow us to track the progress of the watershed. Funding for administration, outreach, and assessment will be provided through existing 319 grants. Implementation of these practices will occur in phases over the course of a two year period.
Resumo:
The Hurley Creek Watershed is a micro-watershed of approximately 2,211 acres (3.5 square miles), which drains into the Platte River southwest of Creston. The watershed is 64% urban and 36% rural. The urban area includes the bulk of the town of Creston (population 7,597) and the rural area is just north of Creston, which includes the origin of Hurley Creek. Hurley Creek Watershed was examined for improvements following a citizens group in 2004 determined a need and desire to make McKinley Lake, a 65-acre city-owned lake, a quality fishery and viable swimming lake, as it once was. As part of a major park improvement project over ten-plus years, the watershed improvement project is undertaken to reduce pollution entering the lake. In 2006, IOWATER volunteers, under guidance of the town’s consultants, sampled the stream in 8 locations throughout the year, a total of 92 samples. The samples, along with visual inspections of the creek, found three major impairments: 1) high E. Coli levels, 2) severe erosion, and 3) storm water management. Using the Watershed Project Planning Protocol, the consultant and a volunteer committee of interested citizens determined that five physical and three administrative actions should be undertaken. The request will help: identify sources of E. Coli and reduce its delivery into the watershed, control animal access, manage storm water, implement stream-bank stabilization, educate the public, and develop miscellaneous small projects on specific properties.
Resumo:
Summary of Project AWARE on the Wapsipinicon River in 2015.Project AWARE is a volunteer river cleanup event.
Resumo:
Through advocacy, self-empowerment, and education by the Long-Term Care Ombudsman Program, each resident or tenant in a long-term care facility will be treated with dignity and respect and will have his or her rights honored.
Resumo:
Pavement and shoulder edge drop-offs commonly occur in work zones as the result of overlays, pavement replacement, or shoulder construction. The depth of these elevation differentials can vary from approximately one inch when a flexible pavement overlay is applied to several feet where major reconstruction is undertaken. The potential hazards associated with pavement edge differentials depend on several factors including depth of the drop-off, shape of the pavement edge, distance from traveled way, vehicle speed, traffic mix, volume, and other factors. This research was undertaken to review current practices in other states for temporary traffic control strategies addressing lane edge differentials and to analyze crash data and resultant litigation related to edge drop-offs. An objective was to identify cost-effective practices that would minimize the potential for and impacts of edge drop crashes in work zones. Considerable variation in addressing temporary traffic control in work zones with edge drop-off exposure was found among the states surveyed. Crashes related to pavement edge drop-offs in work zones do not commonly occur in the state of Iowa, but some have resulted in significant tort claims and settlements. The use of benefit/cost analysis may provide guidance in selection of an appropriate mitigation and protection of edge drop-off conditions. Development and adoption of guidelines for design of appropriate traffic control for work zones that include edge drop-off exposure, particularly identifying effective use of temporary barrier rail, may be beneficial in Iowa.
Resumo:
This report reflects the efforts of the Long-Term Care Ombudsmen by sharing program highlights, discussing issues encountered and making recommendations by the Office in carrying out its federal mandate to act as an advocate for the residents/tenants of long-term care facilities.
Resumo:
This report reflects the efforts of the Long-Term Care Ombudsmen by sharing program highlights, discussing issues encountered and making recommendations by the Office in carrying out its federal mandate to act as an advocate for the residents and tenants of long-term care facilities.
Resumo:
This communication tool comes from the Office of the State Long-Term Care Ombudsman to long-term care facilities administrators and directors. The Office's objective is to share information regarding various topics of long term care.