143 resultados para contracting authority
Resumo:
Audit report on the Iowa Water Pollution Control Works Financing Program and the Iowa Drinking Water Facilities Financing Program, joint programs of the Iowa Finance Authority and the Iowa Department of Natural Resources for the year ended June 30, 2012
Resumo:
Audit report on the Iowa State Fair Authority for the year ended October 31, 2012
Resumo:
Audit report on the Great River Regional Waste Authority for the year ended June 30, 2012
Resumo:
Audit report on the Waste Authority of Jackson County (formerly known as the Jackson County Sanitary Disposal Agency) for the year ended June 30, 2012
Resumo:
Report on the Iowa Economic Development Authority for the year ended June 30, 2012
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.
Resumo:
Audit report on the Iowa Agricultural Development Authority for the year ended June 30, 2013
Resumo:
Audit report on the Iowa Lottery Authority for the year ended June 30, 2013
Resumo:
Audit report on the Council Bluffs Airport Authority for the year ended June 30, 2013
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report