89 resultados para Service concepts
Resumo:
Sufficient evidence was not discovered in this brief search to alter the general opinion that the Serviceability (Present Serviceability Index-PSI) - Performance Concepts developed by the AASHO Road Test provides the optimum engineering basis for pavement management. Use of these concepts in Iowa has the additional advantage in that we have a reasonable quantity of historical data over a period of time on the change in pavement condition as measured by PSI's. Some additional benefits would be the ability to better assess our needs with respect to those being recommended to Congress by AASHTO Committees. These concepts have been the basis used for developing policies on dimensions and weight of vehicles and highway needs which the AASHTO Transport Committees have recommended to the United States House Committee on Ways and Means. The first recommendation based on these concepts was made in the mid 1960's. Iowa's participation in the evaluation for this recommendation was under the direction of our present Director of Transportation, Mr. Raymond Kassel. PSI Indexes had to be derived from subjective surface ratings at that time. The most recent recommendation to Congress was made in November of 1977. Based on the rationale expressed above, a pilot study of the major part of the rural interstate system was conducted. The Objective of the study was to measure pavement performance through the use of the Present Serviceability Index (PSI) - Pavement Performance concepts as developed by the AASHO Road Test and to explore the usefulness of this type of data as a pavement management tool. Projects in the vicinity of the major urban centers were not included in this study due to the extra time that would be required to isolate accurate traffic data in these areas. Projects consisting of asphalt surface courses on crushed stone base sections were not included.
Resumo:
Audit report on the Regional Utility Service Systems Commission for the year ended June 30, 2014
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2005
Resumo:
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2005
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2004
Resumo:
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2004
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2015
Resumo:
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2015
Resumo:
The Americans with Disabilities Act (ADA) and the Fair Housing Act (FHA) prohibit discrimination on the basis of disability and govern the use of service or emotional support animals in places where pets may not be permitted. However, courts have been struggling with how to define and treat animals that qualify for protection under each law. This has created confusion as to what rights and duties are owed disabled persons and the animals that live with or accompany them. This essay attempts to clarify these two federal laws with regard to service or emotional support animals and the differing parties‘ rights and interests. It also includes an overview of select state laws that govern assistance animals of all types and our recommendations for enhancing the Iowa Civil Rights Act.
Resumo:
Report on a special investigation of the City of Garwin Ambulance Service for the period July 1, 2010 through March 31, 2015
Resumo:
This report provides the status of the Passenger Rail Service Revolving Fund and the development and operation of the Midwest regional rail system and the state’s passenger rail service.
Resumo:
Iowa Department of Public Health SFY 2015 Annual County Service Contract Listing. This publication strives to identify all service contracts administered by the Iowa Department of Public Health during the period of July 1, 2014 through June 30, 2015. Contracts may have been increased or decreased, and contract titles changed during the published period. Contracts listed in this summary are shown in alphabetical order by contractor within the county. Interdepartmental Agreements with state government agencies are at the back of the listing. Each page is divided into eight columns which identify the following: column 1: the county of the contractor; column 2: the contractor; column 3: the contract number; column 4: the contract title; column 5: the contract amount; column 6: the funding source; column 7: the start date of the contract and column 8: the end date of the contract.
Resumo:
What is the trend in service station sales and how does a change in the traffic pattern affect this trend? This report is a study of service station sales in eight Iowa cities that are experiencing changes in traffic patterns. The cities are: 1. Albia 2. Boone 3. Chariton 4. Decorah 5. Grinnell 6. Jefferson 7. Newton 8. Stuart. The Interstate Highway by-passes Newton, Grinnell and Stuart. Primary highways are being relocated around Boone, Decorah, and Albia. Primary highway relocations have been completed around Chariton and Jefferson.
Resumo:
Audit report on the Appanoose County Service Agency in Centerville, Iowa for the year ended June 30, 2015
Resumo:
The major objective of this research project is to utilize thermal analysis techniques in conjunction with x-ray analysis methods to identify and explain chemical reactions that promote aggregate related deterioration in Portland cement concrete. The first year of this project has been spent obtaining and analyzing limestone and dolomite samples that exhibit a wide range of field service performance. Most of the samples chosen for the study also had laboratory durability test information (ASTM C 666, method B) that was readily available. Preliminary test results indicate that a strong relationship exists between the average crystallite size of the limestone (calcite) specimens and their apparent decomposition temperatures as measured by thermogravimetric analysis. Also, premature weight loss in the thermogravimetric analysis tests appeared to be related to the apparent decomposition temperature of the various calcite test specimens.
Resumo:
The primary objective of this project is to develop a design manual that would aid the county or municipal engineer in making structurally sound bridge strengthening or replacement decisions. The contents of this progress report are related only to Phase I of the study and deal primarily with defining the extent of the bridge problem in Iowa. In addition, the types of bridges to which the manual should be directed have been defined.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests and a supplementary test program. The results reported in this report cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members removed from the two bridges. The field test results of the service loading are compared with theoretical results of the truss analysis.