120 resultados para Pre-Retirement
Resumo:
Report on the Iowa Public Employees’ Retirement System (IPERS) for the year ended June 30, 2004
Resumo:
Report on the Iowa Public Employees’ Retirement System (IPERS) for the year ended June 30, 2005
Resumo:
Report on the Iowa Public Employees’ Retirement System (IPERS) for the year ended June 30, 2006
Resumo:
Report on the Iowa Public Employees’ Retirement System (IPERS) for the year ended June 30, 2008
Resumo:
Report on the Iowa Public Employees’ Retirement System (IPERS) for the year ended June 30, 2011
Resumo:
Report on the Iowa Public Employees’ Retirement System (IPERS) for the year ended June 30, 2012
Resumo:
There is an increased interest in constructing Pre-Cast (PC) Twin and Triple Reinforced Concrete Box (RCB) culverts in Iowa due to the efficiency associated with their production in controlled environment and decrease of the construction time at the culvert sites. The design of the multi-barrel PC culverts is, however, based on guidelines for single-barrel cast-inplace (CIP) culverts despite that the PC and CIP culverts have different geometry. There is scarce information for multiplebarrel RCB culverts in general and even fewer on culverts with straight wingwalls as those designed by Iowa DOT. Overall, the transition from CIP to PC culverts requires additional information for improving the design specifications currently in use. Motivated by the need to fill these gaps, an experimental study was undertaken by IIHR-Hydroscience & Engineering. The goals of the study are to document flow performance curves and head losses at the culvert entrance for a various culvert geometry, flow conditions, and settings. The tests included single-, double- and triple-barrel PC and CIP culverts with two span-to-rise ratios set on mild and steep slopes. The tests also included optimization of the culvert geometry entrance by considering various configurations for the top bevel. The overall conclusion of the study is that by and large the current Iowa DOT design specifications for CIP culverts can be used for multi-barrel PC culvert design. For unsubmerged flow conditions the difference in the hydraulic performance curves and headloss coefficients for PC and CIP culverts are within the experimental uncertainty. Larger differences (specified by the study) are found for submerged conditions when the flow is increasingly constricted at the entrance in the culvert. The observed differentiation is less important for multi-barrel culverts as the influence of the wingwalls decreases with the increase of the number of barrels.
Resumo:
Comprehensive annual financial report of the Iowa Public Employees’ Retirement System for the Fiscal Year ended June 30, 2010
Resumo:
A guide to IPERS programs and services for Iowa state legislators.
Resumo:
Audit report on the Iowa Judicial Retirement System for the year ended June 30, 2013
Resumo:
Audit report on the Peace Officers' Retirement, Accident and Disability System for the year ended June 30, 2013
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report