144 resultados para Off-road race car
Resumo:
In response to local concerns, the Iowa Department of Transportation (DOT) requested a road safety audit (RSA) for the IA Highway 28 corridor through the City of Norwalk in Warren County, Iowa, from the south corporate limits of Norwalk through the IA 5 interchange in Polk County, Iowa. The audit included meeting with City staff to discuss concerns, review crash history and operational issues, observe the route under daylight and nighttime conditions, and analyze available data. This report outlines the findings and recommendations of the audit team for addressing the safety concerns and operational matters along this corridor.
Resumo:
To date there have been few investigations of the substructures in low-volume road (LVR) bridges. Steel sheet piling has the potential to provide an economical alternative to concrete bridge abutments, but it needs investigation with regard to vertical and lateral load resistance, construction methods, and performance monitoring. The objectives of this project were to develop a design approach for sheet pile bridge abutments for short-span low-volume bridges, formulate an instrumentation and monitoring plan to evaluate performance of sheet pile abutment systems, and understand the cost and construction effort associated with building the sheet pile bridge abutment demonstration project. Three demonstration projects (Boone, Blackhawk, and Tama Counties) were selected for the design, construction, and monitoring of sheet pile abutments bridges. Each site was unique and required site-specific design and instrumentation monitoring. The key findings from this study include the following: (1) sheet pile abutment bridges provide an effective solution for LVR bridges, (2) the measured stresses and deflection were different from the assumed where the differences reflect conservatism in the design and the complex field conditions, and (3) additional research is needed to optimize the design.
Resumo:
Iowa has about 22,936 bridges on low-volume roads (LVRs). Based on the National Bridge Inventory data, 22 percent of the LVR bridges in Iowa are structurally deficient, while 5 percent of them are functionally obsolete. The substructure components (abutment and foundation elements) are known to be contributing factors for some of these poor ratings. Steel sheet piling was identified as a possible long-term option for LVR bridge substructures; but, due to lack of experience, Iowa needed investigation with regard to vertical and lateral load resistance, construction methods, design methodology, and load test performance. This project was initiated in January 2007 to investigate use of sheet pile abutments. *************Tech Transfer Summary. For full report see: http://publications.iowa.gov/id/eprint/14832*************
Resumo:
This report, the Full Report, is the culmination of the Task Force’s responsibilities as set out in Executive Order 5, dated October 30, 2007. The Executive Order specifies a number of goals and report requirements.There is a commonly held perception that the use of detention may serve as a deterrent to future delinquency. Data in this report reflect that approximately 40% of youth detained in 2006 were re-detained in 2006. Research conducted by national experts indicates that, particularly for low risk/low level offenders, that the use of detention is not neutral, and may increase the likelihood of recidivism. Comparable data for Iowa are not available (national data studied for this report provide level of risk, but risk level related to detention is not presently available for Iowa). The Task Force finds no evidence suggesting that recidivism levels (as related to detention risk) in Iowa should be different than found in other states. Data in this report also suggest that detention is one of the juvenile justice system’s more costly sanctions ($257 - $340 per day). Other sites and local jurisdictions have been able to redirect savings from the reduced use of juvenile detention to support less costly, community-based detention alternatives without compromising public safety.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
The work of the Department of Natural Resources impacts the lives of all Iowans. Iowans deserve a clean environment and quality natural areas for public use and enjoyment. This report reflects the progress made during fiscal year 2013 (FY13) toward our goals and provides information regarding the condition of our state’s natural resources and the effectiveness of our programs. In FY13, we continued to improve collaboration with other executive branch agencies. The DNR and DOT work very closely on the issuance of permits needed for road and bridge constructions, but recently we have also been working together to meet the administrative needs of the agencies. The DNR is working closely with the DOT to adopt an Electronic Records Management System used by the DOT. This system will improve accessibility to public documents and reduce the amount of paper files retained in storage. The DNR also continues to improve collaboration with other agencies, such as the Iowa Economic Development Authority as we work closely with them on business development in the state. The DNR strives to continually improve our customer service and how we can meet Iowan’s needs. As an example, the online reservation system for campground reservations has grown over the past eight years so that now 88% of the camping reservations are made online. The DNR continues to improve our online presence and accessibility. In FY13 the Iowa Legislature approved paying off the State’s bond debt used to construct Honey Creek Resort State Park. By removing this debt, the DNR will be able to focus more on the future of the Resort, rather than the past debt. Finally, in August of 2012, the DNR was faced with a tragic accident, where a seasonal parks employee died after rolling a mower into a lake. This incident has caused us to establish a Safety Program at the DNR and to review all of our departmental safety trainings, programs, and equipment. By focusing on our employee’s safety and well being, it is another way that we can demonstrate that at the DNR, our employees are our greatest asset.
Resumo:
This booklet contains rules and regulations most likely needed for motorized recreational use in Iowa. However, it is not a complete list of all regulations or laws, nor is it a legal document. For more information, please reference Iowa Code Chapters 321 and 321G and Iowa Administrative Code, Chapter 571.
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Resumo:
This is a story about a highway project near the small town of Wever, Iowa, and an American Indian village that existed at the location prior to the Europeans' arrival. The culture that lived in this village existed in a 10 state region of the Upper Midwest and may have been the ancestors of tribes living in the Midwest when European explorers entered the region. An archaeological recovery of information from the site was undertaken by the Iowa Department of Transportation because four-lane construction of U.S. 61 could not be accomplished without destroying most of the site. This site proved to be one of the richest archaeological finds in the State of Iowa. ǂc Iowa Department of Transportation.
Resumo:
This Executive Summary presents a brief summary of the main research report, "The Economics of Reducing the County Road System: Three Case Studies in Iowa" (DOT/OST/P-34/86-035). The case studies are described, as well as the analytic methodology and research findings.
Resumo:
This research project looked at the economic benefits and costs associated with alternative strategies for abandoning low volume rural highways and bridges. Three test counties in Iowa were studied, each 100 square miles in size: Hamilton County having a high agricultural tax base and a high percentage of paved roads and few bridges; Shelby County having a relatively low agricultural tax base, hilly terrain and a low percentage of paved road and many bridges; and Linn County having a high agricultural tax base, a high percentage of paved roads and a large number of non-farm households. A questionnaire survey was undertaken to develop estimates of farm and household travel patterns. Benefits and costs associated with the abandonment of various segments of rural highway and bridge mileages in each county were calculated. "Benefits" calculated were reduced future reconstruction and maintenance costs, whereas "costs" were the added cost of travel resulting from the reduced mileage. Some of the findings suggest limited cost savings from abandonment of county roads with no property access in areas with large non-farm rural population; relatively high cost savings from the abandonment of roads with no property access in areas with small rural population; and the largest savings from the conversion of public dead-end gravel roads with property or residence accesses to private drives.
Resumo:
Iowa Counties have been experiencing significant tort claim liability due to the signing of local roads. One such problem is relative to the real or alleged need for signing at uncontrolled intersections of local roads. It has been assumed that the standard CROSS ROAD sign, which calls for a yellow diamond with a black cross, was sufficient to provide the necessary warning that a driver may be approaching an intersection which requires special precautionary driving attention. However, it is possible that this sign on a through highway might conflict with the legal status of the local county road. In light of this situation, it seemed worthwhile to know the extent to which uncontrolled local road intersections were perceived as a potential liability problem; the degree to which the standard CROSS ROAD sign communicated to the driver the message a county engineer wanted at these local road intersections; and whether there were any better signing alternatives available to communicate this hazard to the driver in this situation.
Resumo:
Iowa's county road system serves many critical functions in a changing environment. Many counties with very different social, economic, and demographic circumstances do not have adequate resources to provide the desired level of service on their secondary road systems. How the state's Road Use Tax Fund (RUTF) is distributed among counties is therefore of great importance. This report presents the results of a year-long study of how to distribute RUTF resources among Iowa's 99 counties. The project was undertaken at the request of county engineers who wish to replace the current method of allocation with one that is more stable, comprehensible, and predictable. This report describes the current allocation method, examines how other states distribute road funds to counties, and discusses potential allocation factors that could be included in a revised procedure. The process undertaken to narrow the range of possible formulas and determine the one to recommend is summarized. Finally, the report presents the allocation formula recommended by the project advisory committee, along with how it would operate.
Resumo:
Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: (1) Design criteria and levels of maintenance; (2) Consistency in the use of standards among jurisdictions; (3) Consolidation of maintenance operations at one jurisdiction level; and (4) Jurisdicational authority for roads; The issues formed the background for Research Project HR-265.