90 resultados para Electronic transition intensities
Resumo:
IPI is comprised of three divisions. Private Sector funds are handed over to the General Fund. Traditional Industries and Farms funds are managed by IPI. The auditor of the state provides oversight on policies, procedures, and compliance with state law. Each year, the auditor is responsible for providing the Governor, legislature, Director of Corrections, and the public the findings of their comprehensive audits. IPI has received a clean bill of health and has not been cited for any violations in ten (10) years. IPI operates under the guidance of an advisory board, comprised of seven members. The advisory board meets at least four (4) times per year at a location of the board‟s choice, generally at a different prison each quarter. The board reviews the financials, policies, approves any new private sector ventures and offers comprehensive guidance on issues that will impact correctional industries as well as the public and local businesses. Each member serves for two (2) years and may be re-appointed. IPI has found that retaining board members has helped immensely with the continuity of transition and has afforded IPI with superb leadership and guidance. IPI is 100% self-funding. We receive no appropriations from the general fund. We hire our staff, pay their salaries, and pay the stipend of the offenders. We pay for our raw materials, equipment, and construct our buildings all from the proceeds of our sales. We operate with a revolving fund and retain any earnings at year-ends. The retained earnings are used for expansion of our work programs.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.
Resumo:
This brochure explains Iowa's laws concerning the use of cell phones and other electronic communication devices while driving.
Resumo:
The closing of the RIO does not mean that the recovery process is complete for Iowa families and communities. The recovery process will continue for many years to come, and the Rebuild Iowa Transition Strategy has been drafted to provide a comprehensive set of recommended action steps to help the state complete long-term recovery efforts while better preparing the state for future disasters. This report begins with a review of the twelve major Rebuild Iowa Advisory Commission (RIAC) recommendations which have guided RIO’s work, followed by a summary of the major accomplishments toward each recommendation. Complete, detailed information on all the work that has been accomplished toward the RIAC recommendations can be found in the RIO’s Quarterly Reports. The identification of remaining needs and issues serves as the basis for the transition strategy.
Resumo:
Pseudoephedrine (PSE) is a common medicine used to treat colds and allergies. It is also a common ingredient, or precursor, used to manufacture methamphetamine, an illegal Schedule II drug under Iowa law. Prior to 2005, pseudoephedrine could be purchased over-the-counter, in any amount. Since PSE is the one ingredient needed in all methods of meth manufacturing, it was readily available to meth cooks.
Resumo:
• Examine current pile design and construction procedures used by the Iowa Department of Transportation (DOT). • Recommend changes and improvements to these procedures that are consistent with available pile load test data, soils information, and bridge design practice recommended by the Load and Resistance Factor Design (LRFD) approach.
Resumo:
The primary objectives of the Electronic Bulletin Board System (BBS) project were to: (1) Provide an electronic communication tool which would link city and county engineering offices to each other and to other governmental agencies for messaging and data sharing; (2) Provide a dial-up site for reference information or files accessible on-demand; and (3) Provide a "stepping stone" to the world of electronic data transfer, recognizing that most local government employees face a huge complex of technology with limited knowledge of computers and communications tools. The system was designed to be as simple as possible, and to require minimal equipment and software cost to the users. The original system was an Apex 386/25 computer with MS-DOS 5.0 software and the final configuration was an HP Vectra XM Pentium 90 with MS-NT 3.51 and Mustang - Wildcat 5.0 software. The users of the BBS were county engineers and their staff, offices in the central office of the Iowa Department of Transportation (DOT) and Resident Construction Engineers at the Iowa DOT. Much of the activity was between the county engineers, and their staffs, and the Iowa DOT offices with which they have ongoing business activities. The BBS contained files for mapping, Internet e-mail service, Accident Location Analysis System (ALAS) data, Iowa DOT bid lettings, and Autocad and Intergraph maps and standards. The 800 line calls were recorded and gave the best indication of the usage and the trends that were being followed. The usage tended to be higher in the winter months when design activities are occurring and lower in the summer months when the construction is in progress. The project was judged a success. The BBS did provide a "stepping stone" to the world of electronic data transfer.
Resumo:
The most abundant clay mineral group in Iowa soils is montmorillonite, most commonly calcium-saturated (Hanway et al, 1960). The calcium montmorillonite-water system was therefore selected for detailed X-ray study. Montmorillonite is unusual among minerals in that it has an expanding lattice in the c direction. That is, upon wetting with water, the individual silicate layers separate to allow entry of water, and the mineral expands. Characteristics of this expansion are readily studied by means of X-ray diffraction: the X-ray diffraction angle gives the average layer-to-layer "d001" spacing for any given moisture condition; the sharpness of the diffraction peak is a measure of uniformity of the d001 spacing; and the intensity of the peak relates to uniformity of the d001 spacing and in addition to the electron density distribution within the repeating elements. The latter is embodied in the "structure factor".
Resumo:
This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.
Resumo:
During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom developed WPMS solutions on Iowa DOT bridge projects. At the end of the first year of research, a Request for Proposals (RFP) was developed and issued by the Iowa DOT for the selection of a commercial WPMS to pilot test on multiple bridge projects. During the second year of research, the responses to the RFP issued during the first year of research were evaluated and a solution was selected. The selected solution, Attolist, was customized, tested, and implemented during the fall of 2009. Beginning in the winter of 2010, the solution was implemented on Iowa DOT projects. Researchers worked to assist in the training, implementation, and performance evaluation of the solution. Work will continue beyond the second year of research to implement Attolist on an additional pilot project. During this time, work will be completed to evaluate the impact of WPMS on Iowa DOT bridge projects.
Resumo:
Often, road construction causes the need to create a work zone. In these scenarios, portable concrete barriers (PCBs) are typically installed to shield workers and equipment from errant vehicles as well as prevent motorists from striking other roadside hazards. For an existing W-beam guardrail system installed adjacent to the roadway and near the work zone, guardrail sections are removed in order to place the portable concrete barrier system. The focus of this research study was to develop a proper stiffness transition between W-beam guardrail and portable concrete barrier systems. This research effort was accomplished through development and refinement of design concepts using computer simulation with LS-DYNA. Several design concepts were simulated, and design metrics were used to evaluate and refine each concept. These concepts were then analyzed and ranked based on feasibility, likelihood of success, and ease of installation. The rankings were presented to the Technical Advisory Committee (TAC) for selection of a preferred design alternative. Next, a Critical Impact Point (CIP) study was conducted, while additional analyses were performed to determine the critical attachment location and a reduced installation length for the portable concrete barriers. Finally, an additional simulation effort was conducted in order to evaluate the safety performance of the transition system under reverse-direction impact scenarios as well as to select the CIP. Recommendations were also provided for conducting a Phase II study and evaluating the nested Midwest Guardrail System (MGS) configuration using three Test Level 3 (TL-3) full-scale crash tests according to the criteria provided in the Manual for Assessing Safety Hardware, as published by the American Association of Safety Highway and Transportation Officials (AASHTO).
Resumo:
This issue review provides an overview of the electronic documents management system, or EDMS project.
Resumo:
This issue review provides an overview of the electronic document management system, or EDMS, project, withing the judicial branch and courts.
Resumo:
This document summarizes the conclusions and recommendations of the Library Services Advisory Council who were appointed by Governor Terry E. Branstad to develop a coordinated, cost-effective and comprehensive plan for the implementation of an electronic statewide library and information services program.
Resumo:
For well over 100 years, the Working Stress Design (WSD) approach has been the traditional basis for geotechnical design with regard to settlements or failure conditions. However, considerable effort has been put forth over the past couple of decades in relation to the adoption of the Load and Resistance Factor Design (LRFD) approach into geotechnical design. With the goal of producing engineered designs with consistent levels of reliability, the Federal Highway Administration (FHWA) issued a policy memorandum on June 28, 2000, requiring all new bridges initiated after October 1, 2007, to be designed according to the LRFD approach. Likewise, regionally calibrated LRFD resistance factors were permitted by the American Association of State Highway and Transportation Officials (AASHTO) to improve the economy of bridge foundation elements. Thus, projects TR-573, TR-583 and TR-584 were undertaken by a research team at Iowa State University’s Bridge Engineering Center with the goal of developing resistance factors for pile design using available pile static load test data. To accomplish this goal, the available data were first analyzed for reliability and then placed in a newly designed relational database management system termed PIle LOad Tests (PILOT), to which this first volume of the final report for project TR-573 is dedicated. PILOT is an amalgamated, electronic source of information consisting of both static and dynamic data for pile load tests conducted in the State of Iowa. The database, which includes historical data on pile load tests dating back to 1966, is intended for use in the establishment of LRFD resistance factors for design and construction control of driven pile foundations in Iowa. Although a considerable amount of geotechnical and pile load test data is available in literature as well as in various State Department of Transportation files, PILOT is one of the first regional databases to be exclusively used in the development of LRFD resistance factors for the design and construction control of driven pile foundations. Currently providing an electronically organized assimilation of geotechnical and pile load test data for 274 piles of various types (e.g., steel H-shaped, timber, pipe, Monotube, and concrete), PILOT (http://srg.cce.iastate.edu/lrfd/) is on par with such familiar national databases used in the calibration of LRFD resistance factors for pile foundations as the FHWA’s Deep Foundation Load Test Database. By narrowing geographical boundaries while maintaining a high number of pile load tests, PILOT exemplifies a model for effective regional LRFD calibration procedures.