101 resultados para ECONOMIC SURVEYS
Resumo:
Audit report on the Cedar County Economic Development Commission for the year ended June 30, 2011
Resumo:
There have been a multitude of programs providing assistance to the state of Iowa in the past 18 months. Springtime 2008 disasters resulted in tornado damage and widespread flood damage to large fractions of the state. In consequence, there was a very large flow of federal and state resources dedicated to assisting community and statewide recovery efforts. The nation was in recession as well and continued to be in recession through much of 2009. A sizeable amount of assistance found its way to Iowa under the American Recovery and Reinvestment Act of 2009 in the forms of infrastructure stimulus spending, income supports and other safety net spending for households, and stabilization assistance for essential public services like education. On top of that, the state of Iowa authorized the I Jobs program as an additional infrastructure development program, and as a jobs stimulus program. The total amount of spending for all types of programs, disaster or economic recovery related, is perhaps as high as $7.5 billion over the next few years.
Resumo:
Report on applying agreed-upon procedures of Kossuth Connections, Algona, Iowa, and the Iowa Commission on Volunteer Services within the Iowa Department of Economic Development, now known as the Iowa Economic Development Authority, for the period October 2010 through June 2011
Resumo:
Report on the Iowa Department of Economic Development for the year ended June 30, 2011
Resumo:
Agreed-upon procedures report of the Iowa Economic Development Authority for the quarter ended March 31, 2012
Resumo:
Audit report on the Cedar County Economic Development Commission for the year ended June 30, 2012
Resumo:
Report on the Iowa Economic Development Authority for the year ended June 30, 2012
Resumo:
A newly completed study commissioned by the Iowa Office of Energy Independence shows increased jobs, tax revenue and economic activity as a result of Iowa Power Fund projects. The analysis is divided into two parts. Part I assesses the specific impacts of projects that have been funded directly. Part II offers an analysis of the long term impacts when projects are successfully replicated.
Resumo:
Agency Performance Plan, Iowa Department of Economic Development
Resumo:
A newly completed study commissioned by the Iowa Office of Energy Independence shows increased jobs, tax revenue and economic activity as a result of Iowa Power Fund projects. The analysis is divided into two parts. Part I assesses the specific impacts of projects that have been funded directly. Part II offers an analysis of the long term impacts when projects are successfully replicated.
Resumo:
Audit report on the Cedar County Economic Development Commission for the year ended June 30, 2013
Resumo:
Portable (roll-out) stop signs are used at school crossings in over 300 cities in Iowa. Their use conforms to the Code of Iowa, although it is not consistent with the provisions of the Manual on Uniform Traffic Control Devices adopted for nationwide application. A survey indicated that most users in Iowa believe that portable stop signs provide effective protection at school crossings, and favor their continued use. Other non-uniform signs that fold or rotate to display a STOP message only during certain hours are used at school crossings in over 60 cities in Iowa. Their use does not conform to either the Code of Iowa or the Manual on Uniform Traffic Control Devices. Users of these devices also tend to favor their continued use. A survey of other states indicated that use of temporary devices similar to those used in Iowa is not generally sanctioned. Some unsanctioned use apparently occurs in several states, however. A different type of portable stop sign for school crossings is authorized and widely used in one state. Portable stop signs similar to those used in Iowa are authorized in another state, although their use is quite limited. A few reports in the literature reviewed for this research discussed the use of portable stop signs. The authors of these reports uniformly recommended against the use of portable or temporary traffic control devices. Various reasons for this recommendation were given, although data to support the recommendation were not offered. As part of this research, field surveys were conducted at 54 locations in 33 communities where temporary stop control devices were in use at school crossings. Research personnel observed the obedience to stop control and measured the vehicular delay incurred. Stopped delay averaged 1.89 seconds/entering vehicle. Only 36.6 percent of the vehicles were observed to come to a complete stop at the study locations controlled by temporary stop control devices. However, this level of obedience does not differ from that observed at intersections controlled by permanent stop signs. Accident experience was compiled for 76 intersections in 33 communities in Iowa where temporary stop signs were used and, for comparative purposes, at 76 comparable intersections having other forms of control or operating without stop control. There were no significant differences in accident experience An economic analysis of vehicle operating costs, delay costs, and other costs indicated that temporary stop control generated costs only about 12 percent as great as permanent stop control for a street having a school crossing. Midblock pedestrian-actuated signals were shown to be cost effective in comparison with temporary stop signs under the conditions of use assumed. Such signals could be used effectively at a number of locations where temporary stop signs are being used. The results of this research do not provide a basis for recommending that use of portable stop signs be prohibited. However, erratic patterns of use of these devices and inadequate designs suggest that improved standards for their use are needed. Accordingly, nine recommendations are presented to enhance the efficiency of vehicular flow at school crossings, without causing a decline in the level of pedestrian protection being afforded.
Resumo:
This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (bentonite) as a dust palliative for limestone surfaced secondary roads. It had been postulated that the electrically charged surfaces of the clay particles could interact with the charged surfaces of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates and also to band the fine particulates to larger (+#200) limestone particles. Laboratory testing using soda ash dispersed bentonite treatment of limestone fines indicated significant improvement of compressive strength and slaking characteristics. It was recommended that the project proceed to field trials and test roads were constructed in Dallas and Adair counties in Iowa. Soda ash dispersed bentonite solutions can be field mixed and applied with conventional spray distribution equipment. A maximum of 1.5% bentonite(by weight of aggregate)can be applied at one time. Higher applications would have to be staged allowing the excess moisture to evaporate between applications. Construction of higher application treatments can be accomplished by adding dry bentonite to the surfacing material and then by dry road mixing. The soda ash water solution can then be spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 3 to 4 inch slump concrete. Two motor graders working in tandem can provide rapid mixing for both methods of construction. Calcium and magnesium chloride treatments are 2 to 3 times more effective in dust reduction in the short term (3-4 months) but are prone to washboarding and potholing due to maintenance restrictions. Bentonite treatment at the 2-3% level is estimated to provide a 30-40% dust reduction over the long term(18-24 months). Normal maintenance blading operations can be used on bentonite treated areas. Vehicle braking characteristics are not adversely affected up to the 3.0% treatment level. The bentonite appears to be functioning as a banding agent to bind small particulates to larger particles and is acting to agglomerate fine particles of limestone. This bonding capability appears recoverable from environmental effects of winter, and from alternating wet and dry periods. The bentonite appears to be able to interact with new applications of limestone maintenance material and maintains a dust reduction capability. Soda ash dispersed bentonite treatment is approximately 10 times more cost effective per percent dust reduction than conventional chloride treatments with respect to time. However,the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced 30-40% after treatment there is still dust being generated and the traveling public or residents may not perceive the reduction.
Resumo:
The middle Mississippian (Meramec Series) units include the Spergen Formation, the St. Louis Limestone and the Ste. Genevieve Formation which outcrop sporadically within a curvilinear subcrop band trending through southeastern and central Iowa. Studies of these units as they occur in Iowa have been cursory in the past, especially with regard to the lowermost occurring Meramecan unit, the Spergen Formation. The Spergen Formation, as it occurs in southeastern Iowa is being considered as a desirable concrete aggregate source. At present, the depth of occurrence, thickness variations and geographic extent are very poorly known and the nature of lithologic variation in Iowa is obscure. Due to a paucity of information of its thickness, extent and nature of rapid lateral facies variations, the full economic potential of the unit has not been realized in some areas of southeastern Iowa. This is especially disheartening in view of the decline of acceptable concrete aggregate source materials in southeastern Iowa. This report is an attempt to synthesize subsurface and surface data in order to present a more coherent picture of the depth, thickness and lithologic variations of the Spergen Formation. Recommendations have been made for the exploration of specific areas within the field area for future development of surface quarrying and subsurface mining operations where thickness, lithology and depth characteristics deem consideration. Due to the lack of adequate data points in some quadrants of the field area, some of the recommendations are drawn on rather tenuous grounds, but a concerted effort has been made to be conservative in these judgements.
Resumo:
Report on the Iowa Economic Development Authority for the year ended June 30, 2013