Resumo:
This project was undertaken to study the relationships between the performance of locally available asphalts and their physicochemical properties under Iowa conditions with the ultimate objective of development of a locally and performance-based asphalt specification for durable pavements. Physical and physicochemical tests were performed on three sets of asphalt samples including: (a) twelve samples from local asphalt suppliers and their TFOT residues, (b) six core samples of known service records, and (c) a total of 79 asphalts from 10 pavement projects including original, lab aged and recovered asphalts from field mixes, as well as from lab aged mixes. Tests included standard rheological tests, HP-GPC and TMA. Some specific viscoelastic tests (at 5 deg C) were run on b samples and on some a samples. DSC and X-ray diffraction studies were performed on a and b samples. Furthermore, NMR techniques were applied to some a, b and c samples. Efforts were made to identify physicochemical properties which are correlated to physical properties known to affect field performance. The significant physicochemical parameters were used as a basis for an improved performance-based trial specification for Iowa to ensure more durable pavements.
Resumo:
This report describes the research completed under the research contract entitled "Development of a Conductometric Test for Frost Resistance of Concrete" undertaken for the Iowa Highway Research Board. The objective of the project was to develop a test method which can be reasonably and rapidly performed in the laboratory and in the field to predict, with a high degree of certainty, the behavior of concrete subjected to the action of alternate freezing and thawing. The significance of the results obtained, and recommendations for use and the continued development of conductometric testing are presented in this final report. In this project the conductometric evaluation of concrete durability was explored with three different test methods. The test methods and procedures for each type of test as well as presentation of the results obtained and their significance are included in the body of the report. The three test methods were: (1) Conductometric evaluation of the resistance of concrete to rapid freezing and thawing, (2) Conductometric evaluation of the resistance of concrete to natural freezing and thawing, and (3) Conductometric evaluation of the pore size distribution of concrete and its correlation to concrete durability. The report also includes recommendations for the continued development of these test methods.
Resumo:
Concretes with service lives of less than 15 years and those with lives greater than 40 years were studied with petrographic microscope, scanning electron microscope, and electron microprobe to determine why these two groups of concrete exhibit such different degrees of durability under highway conditions. Coarse aggregate used in both types of concrete were from dolomite rock, but investigation revealed that dolomite aggregate in the two groups of concretes were much different in several respects. The poorly-performing aggregate is fine-grained, has numerous euhedral and subhedral dolomite rhombohedra, and has relatively high porosity. Aggregate from durable concrete is coarse-grained, with tightly interlocked crystal fabric, anhedral dolomite boundaries, and low porosity. Aggregate in short service life concrete was found to have undergone pervasive chemical reactions with the cement which produced reaction rims on the boundaries of coarse aggregate particles and in the cement region adjacent to aggregate boundaries. Textural and porosity differences are believed to be chiefly responsible for different service lives of the two groups of concrete. The basic reaction that has occurred in the short service life concretes between coarse aggregate and cement is an alkali-dolomite reaction. In the reaction dolomite from the aggregate reacts with hydroxide ions from the cement to free magnesium ions and carbonate ions, and the magnesium ions precipitate as brucite, Mg(OH)2. Simultaneously with this reaction, a second reaction occurs in which product carbonate ions react with portlandite from the cement to form calcite and hydroxide ions. Crystal growth pressures of newly formed brucite and calcite together with other processes, e.g. hydration state changes of magnesium chloride hydrates, lead to expansion of the concretes with resultant rapid deterioration. According to this model, magnesium from any source, either from reacting dolomite or from magnesium road deicers, has a major role in highway concrete deterioration. Consequently, magnesium deicers should be used with caution, and long-term testing of the effects of magnesium deicers on highway concrete should be implemented to determine their effects on durability.
Resumo:
Phase I was initiated as a result of internal Iowa Department of Transportation (Iowa DOT) studies that raised concerns about the quality of embankments being constructed. Some large embankments have recently developed slope stability problems. In addition, pavement roughness has been noted shortly after roads were opened to traffic. This raised the question as to whether the current Iowa DOT embankment construction specifications are adequate. The primary objective of Phase I was to evaluate the quality of embankments being constructed under the current Iowa DOT specifications. The project was initiated in May 1997 with a tour of several embankment projects being constructed around the state. At each of these projects the resident construction engineer, field inspector, and contractor were interviewed with respect to their opinion of the current specifications. From construction observations and discussion during these visits it became obvious that there were problems with the current embankment construction specifications. Six embankment projects were selected for in-depth analysis and to represent the full range of soil types being used across the state. The results of Phase I field and laboratory construction testing and observations and post construction testing are presented in this report. Overall evaluation of the results of Phase I indicate that Iowa is not consistently obtaining a quality embankment constructed under the current Iowa DOT specifications. Based on these results, recommendations are made for Phase II to evaluate alternative specifications and develop rapid field methods for compaction control and soil identification.
Resumo:
This report describes a laboratory evaluation of three asphaltic concrete, plant produced mixtures containing Asphadur. The mixtures represent a type A asphaltic concrete and two type B asphaltic concretes. The type A and one of the type B mixtures were used in pavements and will be evaluated later for durability and serviceability. The second type B mixture was made only for laboratory testing. In each instance, control batches of the same mixtures but without Asphadur were made for comparison. Type A is a high type asphaltic concrete, requires a minimum of 65 percent crushed particles and is generally used for higher traffic volume roads. Type B is used for intermediate or lower traffic volumes and requires a minimum of 30 percent crushed particles.
Resumo:
The objective of the investigation was the development of a test that would readily identify the potential of an aggregate to cause D-cracking because of its susceptivity to critical saturation. A Press-Ur-Meter was modified by replacing the air chamber with a one-inch diameter plastic tube calibrated in milli-. It was concluded that the pore index was sufficiently reliable to determine the D-cracking potential of limestone aggregates in all but a few cases where marginal results were obtained. Consistently poor or good results were always in agreement with established service records or concrete durability testing. In those instances where marginal results are obtained, the results of concrete durability testing should be considered when making the final determination of the D-cracking susceptibility of the aggregate in question. The following applications for the pore index test have been recommended for consideration: concrete durability testing be discontinued in the evaluation process of new aggregate sources with pore index results between 0-20 (Class 2 durability) and over 35 (Class 1) durability; composite aggregates with intermediate pore index results of 20-35 be tested on each stone type to facilitate the possible removal of low durability stone from the production process; and additional investigation should be made to evaluate the possibility of using the test to monitor and upgrade the acceptance of aggregate from sources associated with D-cracking.
Resumo:
The purpose of this project was to determine the optimal hole pattern needed for undersealing work, and also to determine if it is feasible to underseal a roadway with existing longitudinal subdrains without plugging the subdrain system. At the test site the hole pattern had little effect on the grout distribution. It was found that the hole pattern, to be effective, must locate existing voids and that holes must extend at least 2 in. (5 cm) below the underside of the pavement. It appeared that pavements can be undersealed without significant damage to the existing subdrains, but special care is needed to assure that excess grout is not injected into the drainage system. Recommendations are made concerning the hole pattern, grout efflux time, and procedures for minimizing the risk of plugging the subdrains with grout.
Resumo:
This project consisted of slipforming a 4-inch thick econocrete subbase on a 6-mile section of US 63. The project location extends south from one mile south of Denver, Iowa to Black Hawk County Road C-66 and consisted of the reconstruction and new construction of a divided four-lane facility. The econocrete was placed 27.3 feet wide in a single pass. Fly ash was used in this field study to replace 30, 45 and 60 percent of the portland cement in three portland cement econocrete base paving mixes. The three mixes contained 300, 350 and 400 pounds of cementitious material per cubic yard. Two Class "C" ashes from Iowa approved sources were used. The ash was substituted on the basis of one pound of ash for each pound of cement removed. The work was done October 6-29, 1987 and May 25-June 9, 1988. The twelve subbase mixes were placed in sections 2500 to 3000 feet in length on both the north and southbound roadways. Compressive strengths of all mixes were determined at 3 and 28 days of age. Flexural strengths of all mixes were determined at 7 and 14 days. In all cases strengths were adequate. The freeze/thaw durability of the econocrete mixes used was reduced by increased fly ash levels but remained above acceptable limits. The test results demonstrate the feasibility of producing econocrete with satisfactory properties even using fly ash at substitution rates up to 45 percent.
Resumo:
Interest in the use of ground rubber from used tires as a hot asphalt mix binder has been increasing due to the magnitude of the disposal problem posed by the annual addition of millions of waste tires to the refuse stream. This study evaluates, through laboratory means, the performance of asphalt-rubber as a hot mix binder as compared to conventional asphalt. The results indicate that asphalt-rubber outperforms its base asphalt in mixes of identical gradation and comparable void content on tests that are heavily dependent on binder characteristics (resilient modulus and indirect tension). An appreciable increase in rut resistance due to the use of asphalt-rubber is not indicated.
Resumo:
In this report, sixteen secondary and primary bridge standards for two types of bridges are rated for AASHTO HS20-44 vehicle configuration utilizing Load Factor methodology. The ratings apply only to those bridges which: (1) are built according to the applicable bridge standard plans, (2) have no structural deterioration or damage, and (3) have no added wearing surface in excess of one-half inch integral wearing surface.
Resumo:
Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.
Resumo:
The Iowa Department of Transportation (Iowa DOT) currently performs wetland mitigation on a project-by-project basis. At the same time, other agencies like the Iowa Department of Natural Resources and Natural Resource Conservation Service are performing wetland restoration projects, and counties and cities may be mitigating wetland losses as well. This project examined the feasibility of developing cooperative wetland mitigation projects in order to utilize state and local resources more efficiently to benefit both Iowa and local communities. The project accomplished the following objectives: (1) Identified and characterized cooperative wetland mitigation programs nationwide; (2) Developed a needs assessment through a survey of state, county, and large city agencies in Iowa to describe wetland mitigation programs and determine challenges with mitigation and program improvements, including long-term risks associated with maintenance and monitoring programs; (3) Surveyed state, county, and city agencies and organizations to identify resources available for developing cooperative mitigation projects and procedures; (4) Developed a conceptual framework for cooperative wetland mitigation.
Resumo:
Efforts to eliminate rutting on the Interstate system have resulted in 3/4 in. aggregate mixes, with 75 blow Marshall, 85% crushed aggregate mix designs. On a few of these projects paved in 1988-1989, water has appeared on the surfaces. Some conclusions have been reached by visual on-sight investigations that the water is coming from surface water, rain and melting snow gaining entry into the surface asphalt mixture, then coming back out in selected areas. Cores were taken from several Interstate projects and tested for permeability to investigate the surface water theory that supposedly happens with only the 3/4 in. mixtures. All cores were of asphalt overlays over portland cement concrete, except for the Clarke County project which is full depth AC. The testing consisted of densities, permeabilities, voids by high pressure airmeter (HPAM), extraction, gradations, AC content, and film thicknesses. Resilient modulus, indirect tensile and retained strengths after freeze/thaw were also done. All of the test results are about as expected. Permeabilities, the main reason for testing, ranged from 0.00 to 2.67 ft per day and averages less than 1/2 ft per day if the following two tests are disregarded. One test on each binder course came out to 15.24 ft/day, and a surface course at 13.78 ft/day but these are not out of supposedly problem projects.
Resumo:
The objective of this research was to evaluate the quality (angularity, mortar strengths and alkali-silica reactivity) of fine aggregate for Iowa portland cement concrete (PCC) pavements. Sands were obtained from 30 sources representative of fine aggregate across Iowa. The gradation, fineness modulus and mortar strengths were determined for all sands. Angularity was evaluated using a new National Aggregate Association (NAA) flow test. The NAA uncompacted void values are significantly affected by the percent of crushed particles and are a good measure of fine aggregate angularity. The alkali-silica reactivity of Iowa sands was measured by the ASTM P214 test. By P214 many Iowa sands were identified as being reactive while only two were innocuous. More research is needed on P214 because pavement performance history has shown very little alkali-silica reactivity deterioration of pavement. Six of the sands tested by P214 were evaluated using the Canadian Prism Test. None were identified as being reactive by the Canadian Prism Test.
Resumo:
The Iowa Department of Transportation has been determining a present serviceability index (PSI) on the primary highway system since 1968. A CHLOE profilometer has been used as the standard for calibrating the Roadmeters that do the system survey. The current Roadmeter, an IJK Iowa DOT developed unit, is not considered an acceptable Roadmeter for determining the FHWA required International Roughness Index (IRI). Iowa purchased a commercial version of the South Dakota type profile (SD Unit) to obtain IRI. This study was undertaken to correlate the IRI to the IJK Roadmeter and retire the Roadmeter. One hundred forty-seven pavement management sections (IPMS) were tested in June and July 1991 with both units. Correlation coefficients and standard error of estimates were: r' Std. Error PCC pavements 0.81 0.15 Composite pavements 0.71 0.18 ACC pavements 0.77 0.17 The correlation equations developed from this work will allow use of the IRI to predict the IJK Roadmeter response with sufficient accuracy. Trend analysis should also not be affected.