62 resultados para população final
Resumo:
When concrete deterioration begins to occur in highway pavement, repairs become necessary to assure the rider safety, extend its useful life and restore its riding qualities. One rehabilitation technique used to restore the pavement to acceptable highway standards is to apply a thin portland cement concrete (PCC) overlay to the existing pavement. First, any necessary repairs are made to the existing pavement, the surface is then prepared, and the PCC overlay is applied. Brice Petrides-Donohue, Inc. (Donohue) was retained by the Iowa Department of Transportation (IDOT) to evaluate the present condition with respect to debonding of the PCC overlay at fifteen sites on Interstate 80 and State Highway 141 throughout the State of Iowa. This was accomplished by conducting an infrared thermographic and ground penetrating radar survey of these sites which were selected by the Iowa Department of Transportation. The fifteen selected sites were all two lanes wide and one-tenth of a mile long, for a total of three lane miles or 190,080 square feet. The selected sites are as follows: On Interstate 80 Eastbound, from milepost 35.25 to 35.35, milepost 36.00 to 36.10, milepost 37.00 to 37.10, milepost 38.00 to 38.10 and milepost 39.00 to 39.10, on State Highway 141 from milepost 134.00 to 134.10, milepost 134.90 to milepost 135.00, milepost 135.90 to 136.00, milepost 137.00 to 137.10 and milepost 138.00 to 138.10, and on Interstate 80 Westbound from milepost 184.00 to 184.10, milepost 185.00 to 185.10, milepost 186.00 to 186.10, milepost 187.00 to 187.10, and from milepost 188.00 to 188.10.
Resumo:
After some success with a small asphalt pavement recycling project in 1975, Kossuth County, Iowa programmed a much larger undertaking during the 1976 construction season. The work performed in 1975 indicated that a quality product could be produced with some modifications to conventional equipment. As anticipated , the major problem encountered was the excessive air pollution created during the heating and mixing process. As part of its 1976 road program, Kossuth County developed plans for recycling sixteen miles of existing asphalt pavements using the "hot mix" recycling process. One project, ten miles in length, was selected by the Federal Highway Authority as part of "Demonstration Project No. 39, Recycling Asphalt Pavements." The FHWA provided a $29,500 grant t o the project to be used for project testing and evaluation. Cooperation and input into the work proposed for 1976 was received from many sources. The people and organizations contributing were the Federal Highway Authority, the Iowa Department of Environmental Quality, the Federal Environmental Protection Agency, several contractors, and personnel from the Kossuth County Engineer's Office.