66 resultados para customer need
Resumo:
A bi-monthly bulletin to keep the department/agency management teams of state government better informed. We hope to consolidate most of the service update messages we send throughout the month and keep you updated about the work of the Customer Councils. If yours is one of the many departments who participated in the second annual DAS customer satisfaction survey recently, we thank you for taking the time to give us this important feedback. We look forward to sharing survey results with you, and pledge to consider responses carefully as we work to determine benchmarks and set future priorities.
Resumo:
Retention elections are intended to focus on the professional competency of Iowa’s judges rather than the popularity of individual rulings. In a retention election, voters decide whether a judge should be retained or removed from office. If a judge receives a majority of “yes” votes, the judge serves another full term. If a judge receives a majority of “no” votes, the judge is removed from office at the end of the year.
Resumo:
A bi-monthly bulletin to keep the department/agency management teams of state government better informed. We hope to consolidate most of the service update messages we send throughout the month and keep you updated about the work of the Customer Councils. If yours is one of the many departments who participated in the second annual DAS customer satisfaction survey recently, we thank you for taking the time to give us this important feedback. We look forward to sharing survey results with you, and pledge to consider responses carefully as we work to determine benchmarks and set future priorities.
Resumo:
The purpose of this project was to determine the feasibility of using pavement condition data collected for the Iowa Pavement Management Program (IPMP) as input to the Iowa Quadrennial Need Study. The need study, conducted by the Iowa Department of Transportation (Iowa DOT) every four years, currently uses manually collected highway infrastructure condition data (roughness, rutting, cracking, etc.). Because of the Iowa DOT's 10-year data collection cycles, condition data for a given highway segment may be up to 10 years old. In some cases, the need study process has resulted in wide fluctuations in funding allocated to individual Iowa counties from one study to the next. This volatility in funding levels makes it difficult for county engineers to plan and program road maintenance and improvements. One possible remedy is to input more current and less subjective infrastructure condition data. The IPMP was initially developed to satisfy the Intermodal Surface Transportation Efficiency Act (ISTEA) requirement that federal-aid-eligible highways be managed through a pavement management system. Currently all metropolitan planning organizations (MPOs) in Iowa and 15 of Iowa's 18 RPAs participate in the IPMP. The core of this program is a statewide data base of pavement condition and construction history information. The pavement data are collected by machine in two-year cycles. Using pilot areas, researchers examined the implications of using the automated data collected for the IPMP as input to the need study computer program, HWYNEEDS. The results show that using the IPMP automated data in HWYNEEDS is feasible and beneficial, resulting in less volatility in the level of total need between successive quadrennial need studies. In other words, the more current the data, the smaller the shift in total need.
Resumo:
Contact list for Iowa Department of Transportation
Resumo:
The primary objective of this project was to determine the effect of bridge width on deck cracking in bridges. Other parameters, such as bridge skew, girder spacing and type, abutment type, pier type, and number of bridge spans, were also studied. To achieve the above objectives, one bridge was selected for live-load and long-term testing. The data obtained from both field tests were used to calibrate a three-dimensional (3D) finite element model (FEM). Three different types of loading—live loading, thermal loading, and shrinkage loading—were applied. The predicted crack pattern from the FEM was compared to the crack pattern from bridge inspection results. A parametric study was conducted using the calibrated FEM. The general conclusions/recommendations are as follows: -- Longitudinal and diagonal cracking in the deck near the abutment on an integral abutment bridge is due to the temperature differences between the abutment and the deck. Although not likely to induce cracking, shrinkage of the deck concrete may further exacerbate cracks developed from thermal effects. -- Based upon a limited review of bridges in the Iowa DOT inventory, it appears that, regardless of bridge width, longitudinal and diagonal cracks are prevalent in integral abutment bridges but not in bridges with stub abutments. -- The parametric study results show that bridge width and skew have minimal effect on the strain in the deck bridge resulting from restrained thermal expansion. -- Pier type, girder type, girder spacing, and number of spans also appear to have no influence on the level of restrained thermal expansion strain in the deck near the abutment.