123 resultados para Service limited State
Resumo:
Soon after the Illinois Department of Transportation (“Ill. DOT”) requested Amtrak to conduct a feasibility study on proposed Amtrak service between Chicago and the Illinois Quad Cities, the Iowa Department of Transportation (“Iowa DOT”) asked that the study be extended to Iowa City and later to Des Moines. This report examines the feasibility of extending service to Iowa City. The completed report for the proposed Chicago – Quad Cities’ service was delivered to Ill. DOT in early January 2008. It assumes a stand-alone train operation strictly within the State of Illinois and makes no reference to extending the service into the State of Iowa. Therefore, there is no discussion about potential cost sharing allocations for capital improvements or operating losses between the two states which will become a matter of future negotiations between the two jurisdictions. That being said, this report on extending the service to Iowa City is simply an addendum to the Quad Cities report and covers such topics as additional capital infrastructure improvements that would be required in Iowa, impacts on operating expenses, revised ridership and revenue projections, and the like. With one minor exception, the recommended level of capital improvements within Illinois will still be required if the service to Iowa City is initiated. It is thus important for the readers of this report to refer to the Illinois study for detailed information on that state’s portion of the route alternatives.
Resumo:
Audit report on the Regional Utility Service Systems Commission for the year ended June 30, 2011
Resumo:
Coming Into Focus presents a needs assessment related to Iowans with brain injury, and a state action plan to improve Iowa’s ability to meet those needs. Support for this project came from a grant from the Office of Maternal and Child Health to the Iowa Department of Public Health, Iowa’s lead agency for brain injury. The report is a description of the needs of people with brain injuries in Iowa, the status of services to meet those needs and a plan for improving Iowa’s system of supports. Brain injury can result from a skull fracture or penetration of the brain, a disease process such as tumor or infection, or a closed head injury, such as shaken baby syndrome. Traumatic brain injury is a leading cause of death and disability in children and young adults (Fick, 1997). In the United States there are as many as 2 million brain injuries per year, with 300,000 severe enough to require hospitalization. Some 50,000 lives are lost every year to TBI. Eighty to 90 thousand people have moderate to acute brain injuries that result in disabling conditions which can last a lifetime. These conditions can include physical impairments, memory defects, limited concentration, communication deficits, emotional problems and deficits in social abilities. In addition to the personal pain and challenges to survivors and their families, the financial cost of brain injuries is enormous. With traumatic brain injuries, it is estimated that in 1995 Iowa hospitals charged some $38 million for acute care for injured persons. National estimates offer a lifetime cost of $4 million for one person with brain injury (Schootman and Harlan, 1997). With this estimate, new injuries in 1995 could eventually cost over $7 billion dollars. Dramatic improvements in medicine, and the development of emergency response systems, means that more people sustaining brain injuries are being saved. How can we insure that supports are available to this emerging population? We have called the report Coming into Focus, because, despite the prevalence and the personal and financial costs to society, brain injury is poorly understood. The Iowa Department of Public Health, the Iowa Advisory Council on Head Injuries State Plan Task Force, the Brain Injury Association of Iowa and the Iowa University Affiliated Program have worked together to begin answering this question. A great deal of good information already existed. This project brought this information together, gathered new information where it was needed, and carried out a process for identifying what needs to be done in Iowa, and what the priorities will be.
Resumo:
This report provides the status of the Passenger Rail Service Revolving Fund and the development and operation of the midwest regional rail system and the state's passenger rail service.
Resumo:
The creation of three-dimensional (3D) drawings for proposed designs for construction, re-construction and rehabilitation activities are becoming increasingly common for highway designers, whether by department of transportation (DOT) employees or consulting engineers. However, technical challenges exist that prevent the use of these 3D drawings/models from being used as the basis of interactive simulation. Use of driving simulation to service the needs of the transportation industry in the US lags behind Europe due to several factors, including lack of technical infrastructure at DOTs, cost of maintaining and supporting simulation infrastructure—traditionally done by simulation domain experts—and cost and effort to translate DOT domain data into the simulation domain.
Resumo:
The creation of three-dimensional (3D) drawings for proposed designs for construction, re-construction and rehabilitation activities are becoming increasingly common for highway designers, whether by department of transportation (DOT) employees or consulting engineers. However, technical challenges exist that prevent the use of these 3D drawings/models from being used as the basis of interactive simulation. Use of driving simulation to service the needs of the transportation industry in the US lags behind Europe due to several factors, including lack of technical infrastructure at DOTs, cost of maintaining and supporting simulation infrastructure—traditionally done by simulation domain experts—and cost and effort to translate DOT domain data into the simulation domain.
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2012
Resumo:
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2012
Resumo:
Audit report on the Regional Utility Service Systems Commission for the year ended June 30, 2012
Resumo:
Audit report on the Appanoose County Service Agency in Centerville, Iowa for the year ended June 30, 2012
Resumo:
The bearing capacity and service life of a pavement is affected adversely by the presence of undrained water in the pavement layers. In cold winter climates like in Iowa, this problem is magnified further by the risk of frost damage when water is present. Therefore, well-performing subsurface drainage systems form an important aspect of pavement design by the Iowa Department of Transportation (DOT). However, controversial findings are also reported in the literature regarding the benefits of subsurface drainage. The goal of this research was not to investigate whether subdrains are needed in Iowa pavements, but to conduct an extensive performance review of primary interstate pavement subdrains in Iowa, determine the cause of the problem if there are drains that are not functioning properly, and investigate the effect of poor subdrain performance due to improper design, construction, and maintenance on pavement surface distresses, if any. An extensive literature review was performed covering national-level and state-level research studies mainly focusing on the effects of subsurface drainage on performance of asphalt and concrete pavements. Several studies concerning the effects of a recycled portland cement concrete (RPCC) subbase on PCC pavement drainage systems were also reviewed. A detailed forensic test plan was developed in consultation with the project technical advisory committee (TAC) for inspecting and evaluating the Iowa pavement subdrains. Field investigations were conducted on 64 selected (jointed plain concrete pavement/JPCP and hot-mix asphalt/HMA) pavement sites during the fall season of 2012 and were mainly focused on the drainage outlet conditions. Statistical analysis was conducted on the compiled data from field investigations to further investigate the effect of drainage on pavement performance. Most Iowa subsurface drainage system outlet blockage is due to tufa, sediment, and soil. Although higher blockage rates reduce the flow rate of water inside outlet pipes, it does not always stop water flowing from inside the outlet pipe to outside the outlet pipe unless the outlet is completely blocked. Few pavement surface distresses were observed near blocked subsurface drainage outlet spots. More shoulder distresses (shoulder drop or cracking) were observed near blocked drainage outlet spots compared to open ones. Both field observations and limited performance analysis indicate that drainage outlet conditions do not have a significant effect on pavement performance. The use of RPCC subbase in PCC pavements results in tufa formation, a primary cause of drainage outlet blockage in JPCP. Several useful recommendations to potentially improve Iowa subdrain performance, which warrant detailed field investigations, were made
Resumo:
The bearing capacity and service life of a pavement is affected adversely by the presence of undrained water in the pavement layers. In cold winter climates like in Iowa, this problem is magnified further by the risk of frost damage when water is present. Therefore, well-performing subsurface drainage systems form an important aspect of pavement design by the Iowa Department of Transportation (DOT). However, controversial findings are also reported in the literature regarding the benefits of subsurface drainage. The goal of this research was not to investigate whether subdrains are needed in Iowa pavements, but to conduct an extensive performance review of primary interstate pavement subdrains in Iowa, determine the cause of the problem if there are drains that are not functioning properly, and investigate the effect of poor subdrain performance due to improper design, construction, and maintenance on pavement surface distresses, if any. An extensive literature review was performed covering national-level and state-level research studies mainly focusing on the effects of subsurface drainage on performance of asphalt and concrete pavements. Several studies concerning the effects of a recycled portland cement concrete (RPCC) subbase on PCC pavement drainage systems were also reviewed. A detailed forensic test plan was developed in consultation with the project technical advisory committee (TAC) for inspecting and evaluating the Iowa pavement subdrains. Field investigations were conducted on 64 selected (jointed plain concrete pavement/JPCP and hot-mix asphalt/HMA) pavement sites during the fall season of 2012 and were mainly focused on the drainage outlet conditions. Statistical analysis was conducted on the compiled data from field investigations to further investigate the effect of drainage on pavement performance. Most Iowa subsurface drainage system outlet blockage is due to tufa, sediment, and soil. Although higher blockage rates reduce the flow rate of water inside outlet pipes, it does not always stop water flowing from inside the outlet pipe to outside the outlet pipe unless the outlet is completely blocked. Few pavement surface distresses were observed near blocked subsurface drainage outlet spots. More shoulder distresses (shoulder drop or cracking) were observed near blocked drainage outlet spots compared to open ones. Both field observations and limited performance analysis indicate that drainage outlet conditions do not have a significant effect on pavement performance. The use of RPCC subbase in PCC pavements results in tufa formation, a primary cause of drainage outlet blockage in JPCP. Several useful recommendations to potentially improve Iowa subdrain performance, which warrant detailed field investigations, were made.
Resumo:
The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from September 12, 2007 to June 30, 2009 for the purposes of assisting in the evaluation component for the two-year Iowa Prisoner Re-Entry Initiative (PRI) Rural Service Delivery Model. This contract was extended to November 2009. The Rural PRI grant period ran from July 1, 2007 to June 30, 2009 and was extended to November 30, 2009. The purpose of the program was to improve community safety by providing pre-release services and successful transition planning and aftercare services to offenders released from state institutions to the Second Judicial District Department of Correctional Services. Participants included all offenders released to the Second Judicial District during the grant period.
Resumo:
This project is part of an effort conducted by the Justice Research and Statistics Association (JRSA) under a grant whose objective is to provide states with descriptions of existing methodologies to collect Domestic Violence (DV) and Sexual Assault (SA) data. JRSA has identified three different methodologies to collect such data: · Incident-based reporting as part of the Uniform Crime Reports · Specialized data collection from law enforcement through a separate data collection system · Specialized data collection coming directly from service providers. One state has been selected as an example of each type of data collection above, with Iowa selected as a representative of states with incident based reporting (IBR) as part of the UCR system.
Resumo:
State of Iowa Appropriations Process. Flow chart of the process.
Resumo:
A publication produced by the Legislative Services Agency. A 12 question quiz of the capital with the answers.