The members of the Iowa Concrete Paving Association, the National Concrete Pavement Technology Center Research Committee, and the Iowa Highway Research Board commissioned a study to examine alternative ways of developing transverse joints in portland cement concrete pavements. The present study investigated six separate variations of vertical metal strips placed above and below the dowels in conventional baskets. In addition, the study investigated existing patented assemblies and a new assembly developed in Spain and used in Australia. The metal assemblies were placed in a new pavement and allowed to stay in place for 30 days before the Iowa Department of Transportation staff terminated the test by directing the contractor to saw and seal the joints. This report describes the design, construction, testing, and conclusions of the project.
Resumo:
As truck traffic on Iowa secondary roads has increased, engineers have moved to concrete pavements of greater depths. Early designs included thickened edge pavements and depths of seven inches or greater. The designs typically did not have load transfer devices installed in the transverse joints and relied on aggregate interlock for this purpose. In some cases, aggregate interlock was not adequate to deal with the soils and traffic conditions and faulting of the joints has begun to appear. Engineers are now faced with the need to install or retrofit load transfer in the joints to preserve the pavements. Questions associated with this decision range from the type of dowel material to dowel diameter, spacing, number of bars, placement method, and construction techniques to be used to assure reduction or elimination of faulting. Buena Vista County constructed a dowel bar retrofit project on one mile of road. The plan called for addition of the dowels (2, 3, or 4) in the outer wheel path only and surface grinding in lieu of asphalt overlay. The project included the application of elliptical- and round-shaped dowels in a rehabilitation project. Dowel material types included conventional epoxy-coated steel and fiber-reinforced polymer (FRP). This work involved the determination of relative costs in materials to be used in this type of work and performance of FRP and elliptical-shaped steel dowels in the retrofit work. The results indicate good performance from each of the bar configurations and use the results of ride and deflection testing over the research period to project the benefits that can be gained from each configuration vs. the anticipated construction costs. The reader is cautioned that this project could not relate the number of dowels required to the level of anticipated truck traffic for other roads that might be considered.
Resumo:
Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believed to increase sawing productivity and reduce the cost of the joint sawing operations. However, some early entry sawing joints (transverse joints) in Iowa were found to experience delayed cracking, sometimes up to 30 days. A concern is whether early entry sawing can lead to late-age random cracking. The present study investigated the effects of different sawing methods on random cracking in portland cement concrete (PCC) pavements. The approach was to assess the cracking potential at sawing joints by measuring the strain development of the concrete at the joints using concrete embedment strain gages. Ten joints were made with the early entry sawing method to a depth of 1.5 in., and two strain gages were installed in each of the joints. Another ten joints were made with the conventional sawing method, five of which were sawed to a depth of one-third of the pavement thickness (3.3 in.), and the other five of which were sawed to a depth of one-quarter of the pavement thickness (2.5 in.). One strain gage was installed in each joint made using conventional sawing. In total, 30 strain gages were installed in 20 joints. The results from the present study indicate that all 30 joints cracked within 25 days after paving, though most joints made using early entry sawing cracked later than the joints made using conventional sawing. No random cracking was observed in the early entry sawing test sections two months after construction. Additionally, it was found that the strain gages used were capable of monitoring the deformations at the joints. The joint crack times (or crack initiation time) measured by the strain gages were generally consistent with the visual observations.
Resumo:
The ends of prestressed concrete beams under expansion joints are often exposed to moisture and chlorides. Left unprotected, the moisture and chlorides come in contact with the ends of the prestressing strands and/or the mild reinforcing, resulting in corrosion. Once deterioration begins, it progresses unless some process is employed to address it. Deterioration can lead to loss of bearing area and therefore a reduction in bridge capacity. Previous research has looked into the use of concrete coatings (silanes, epoxies, fiber-reinforced polymers, etc.) for protecting prestressed concrete beam ends but found that little to no laboratory research has been done related to the performance of these coatings in this specific type of application. The Iowa Department of Transportation (DOT) currently specifies coating the ends of exposed prestressed concrete beams with Sikagard 62 (a high-build, protective, solvent-free, epoxy coating) at the precast plant prior to installation on the bridge. However, no physical testing of Sikagard 62 in this application has been completed. In addition, the Iowa DOT continues to see deterioration in the prestressed concrete beam ends, even those treated with Sikagard 62. The goals of this project were to evaluate the performance of the Iowa DOT-specified beam-end coating as well as other concrete coating alternatives based on the American Association of State Highway and Transportation Officials (AASHTO) T259-80 chloride ion penetration test and to test their performance on in-service bridges throughout the duration of the project. In addition, alternative beam-end forming details were developed and evaluated for their potential to mitigate and/or eliminate the deterioration caused by corrosion of the prestressing strands on prestressed concrete beam ends used in bridges with expansion joints. The alternative beam-end details consisted of individual strand blockouts, an individual blockout for a cluster of strands, dual blockouts for two clusters of strands, and drilling out the strands after they are flush cut. The goal of all of the forming alternatives was to offset the ends of the prestressing strands from the end face of the beam and then cover them with a grout/concrete layer, thereby limiting or eliminating their exposure to moisture and chlorides.
Resumo:
There is an ongoing drive towards improvements and achieving success in effective and long term sealing of portland cement concrete pavement contraction joints. A variety of joint sealing products and procedures have been applied in Iowa in search of improvements in seal performance. Hot poured rubberized asphalt products were mainly used for sealing all joints in earlier years for highways. In the 1980s, silicone sealant products were becoming popular, especially for the major highways. As a high level of sealant performance was not achieved from silicones in Iowa conditions, other sealing products were tried. Preformed neoprene compression seals are being tried as a substitution for silicone sealants. Due to high costs of materials and installation with neoprene seals, the search for improvements through other joint sealing products and procedures continued. An agreement was made with Phoenix, North America, Inc., to provide and install preformed Ethylene Propylene Diene Monomer (EPDM) compression joint seals. The research site was a 600 ft (183 m) test section of northbound I-29 in Pottawattamie County, Iowa. Seal installation was done August 20, 1992. Seal performance has been good over the past seven years and the seals are still showing no significant signs of decreasing performance.
Resumo:
At present, there is little fundamental guidance available to assist contractors in choosing when to schedule saw cuts on joints. To conduct pavement finishing and sawing activities effectively, however, contractors need to know when a concrete mixture is going to reach initial set, or when the sawing window will open. Previous research investigated the use of the ultrasonic pulse velocity (UPV) method to predict the saw-cutting window for early entry sawing. The results indicated that the method has the potential to provide effective guidance to contractors as to when to conduct early entry sawing. The aim of this project was to conduct similar work to observe the correlation between initial setting and conventional sawing time. Sixteen construction sites were visited in Minnesota and Missouri over a two-year period. At each site, initial set was determined using a p-wave propagation technique with a commercial device. Calorimetric data were collected using a commercial semi-adiabatic device at a majority of the sites. Concrete samples were collected in front of the paver and tested using both methods with equipment that was set up next to the pavement during paving. The data collected revealed that the UPV method looks promising for early entry and conventional sawing in the field, both early entry and conventional sawing times can be predicted for the range of mixtures tested.
Resumo:
Joints are always a concern in the construction and long-term performance of concrete pavements. Research has shown that we need some type of positive load transfer across transverse joints. The same research has directed pavement designers to use round dowels spaced at regular intervals across the transverse joint to distribute the vehicle loads both longitudinally and transversely across the joint. The goal is to reduce bearing stresses on the dowels and the two pavement slab edges and erosion of the underlying surface, hence improved long-term joint and pavement structure performance. Road salts cause metal corrosion in doweled joints, excessive bearing stresses hollow dowel ends, and construction processes are associated with cracking pavement at the end of dowels. Dowels are also a cost factor in the pavement costs when joint spacing is reduced to control curling and warping distress in pavements. Designers desire to place adequate numbers of dowels spaced at the proper locations to handle the anticipated loads and bearing stresses for the design life of the pavement. This interim report is the second of three reports on the evaluation of elliptical steel dowels. This report consists of an update on the testing and performance of the various shapes and sizes of dowels. It also documents the results of the first series of performance surveys and draws interim conclusions about the performance of various bar shapes, sizes, spacings, and basket configurations. In addition to the study of elliptical steel dowel performance, fiber reinforced polymers (FRP) are also tested as elliptical dowel material (in contrast to steel) on a section of the highway construction north of the elliptical steel test sections.
Resumo:
Construction of an excellent network of primary highways across the State of Iowa has essentially been completed. The major task facing the Iowa Department of Transportation today is the maintenance and rehabilitation of that network. The most commonly utilized rehabilitation practice is asphalt concrete resurfacing. This practice will normally provide a good driving surface for at least 10 additional years. The major problem with asphalt concrete resurfacing is the reflection cracking from underlying cracks and joints in the portland cement concrete (PCC) pavement. Deterioration and spaling occur at these reflection cracks and are the limiting factor of the-effective life of the asphalt concrete resurfacing.
Resumo:
Bridge expansion joints, if not properly designed, constructed, and maintained, often lead to the deterioration of critical substructure elements. Strip seal expansion joints consisting of a steel extrusion and neoprene gland are one type of expansion joint and are commonly used by the Iowa Department of Transportation (DOT). Strip seal expansion joints are susceptible to tears and pull outs that allow water, chlorides, and debris to infiltrate the joint, and subsequently the bearings below. One area of the strip seal that is particularly problematic is where it terminates at the interface between the deck and the barrier rail. The Iowa DOT has noted that the initial construction quality of the current strip seal termination detail is not satisfactory, nor ideal, and a need exists for re-evaluation and possibly re-design of this detail. Desirable qualities of a strip seal termination detail provide a seal that is simple and fast to construct, facilitate quick gland removal and installation, and provide a reliable, durable barrier to prevent chloride-contaminated water from reaching the substructure. To meet the objectives of this research project, several strip seal termination details were evaluated in the laboratory. Alternate termination details may not only function better than the current Iowa DOT standard, but are also less complicated to construct, facilitating better quality control. However, uncertainties still exist regarding the long-term effects of using straight-through details, with or without the dogleg, that could not be answered in the laboratory in the short time frame of the research project.
Resumo:
There are still many vintage portland cement concrete (PCC) pavements, 18 ft wide (5.4 m), dating back to pre-World War II era in use today. Successive overlays have been placed to cover joints and to improve rideability. The average thickness of the existing asphalt cement concrete (ACC) along route E66 in Tama County, Iowa, was 6.13 in. (15.6 cm). The rehabilitation strategy called for widening the base using the top 3 in. (7.6 cm) of the existing ACC by a recycling process involving cold milling and mixing with additional emulsion/rejuvenator. The material was then placed into a widening trench and compacted to match the level of the milled surface. This project was undertaken to develop a rehabilitation methodology to widen these older pavements economically and to have a finished surface capable of carrying traffic with little or no additional work.