64 resultados para Lorentz connections
Resumo:
Each year approximately thirty to forty thousand children and youth come to the attention of Iowa’s child welfare and juvenile justice systems and, of those, four to five thousand enter foster care to address child safety or public safety. For most, foster care is a short-term placement designed to allow time to address the reason for removal and to receive the support and services necessary for children to return to their family and community. Unfortunately, too many children and youth remain in foster care too long. Too many youth exit care through emancipation rather than to a permanent family and enduring relationship. Too many young people never realize the security of connections to adults who will be there for a lifetime. When our system fails to find forever families for youth in foster care, long-term outcomes are bleak. A young person’s permanency status is inextricably intertwined with their overall well being.
Resumo:
The Iowa Department of Transportation's Access Management Task Force was established as part of the Iowa Department of Transportation's overall Safety Management System (SMS) effort. The goal of the Access Management Task Force is to develop a program designed to educate and market the concept and benefits of access management to landowners and developers, professional planners and engineers, planning and zoning staff members, appointed and elected officials, and motorists. Access management is pursued through the design and control of driveways, curb cuts, turning movements, interior circulation of parking lots, and public street connections and intersections. Usually, state highways or major urban and suburban arterial streets are the targets of access management projects. Access management is also a concern on main county roads when there is a transition from a rural environment to a town or city.
Resumo:
The current means and methods of verifying that high-strength bolts have been properly tightened are very laborious and time consuming. In some cases, the techniques require special equipment and, in other cases, the verification itself may be somewhat subjective. While some commercially available verification techniques do exist, these options still have some limitations and might be considered costly options. The main objectives of this project were to explore high-strength bolt-tightening and verification techniques and to investigate the feasibility of developing and implementing new alternatives. A literature search and a survey of state departments of transportation (DOTs) were conducted to collect information on various bolt-tightening techniques such that an understanding of available and under-development techniques could be obtained. During the literature review, the requirements for materials, inspection, and installation methods outlined in the Research Council on Structural Connections specification were also reviewed and summarized. To guide the search for finding new alternatives and technology development, a working group meeting was held at the Iowa State University Institute for Transportation October 12, 2015. During the meeting, topics central to the research were discussed with Iowa DOT engineers and other professionals who have relevant experiences.
Resumo:
In 1957, the Iowa State Highway Commission, with financial assistance from the aluminum industry, constructed a 220-ft (67-m) long, four-span continuous, aluminum girder bridge to carry traffic on Clive Road (86th Street) over Interstate 80 near Des Moines, Iowa. The bridge had four, welded I-shape girders that were fabricated in pairs with welded diaphragms between an exterior and an interior girder. The interior diaphragms between the girder pairs were bolted to girder brackets. A composite, reinforced concrete deck served as the roadway surface. The bridge, which had performed successfully for about 35 years of service, was removed in the fall of 1993 to make way for an interchange at the same location. Prior to the bridge demolition, load tests were conducted to monitor girder and diaphragm bending strains and deflections in the northern end span. Fatigue testing of the aluminum girders that were removed from the end spans were conducted by applying constant-amplitude, cyclic loads. These tests established the fatigue strength of an existing, welded, flange-splice detail and added, welded, flange-cover plates and horizontal web plate attachment details. This part, Part 2, of the final report focuses on the fatigue tests of the aluminum girder sections that were removed from the bridge and on the analysis of the experimental data to establish the fatigue strength of full-size specimens. Seventeen fatigue fractures that were classified as Category E weld details developed in the seven girder test specimens. Linear regression analyses of the fatigue test results established both nominal and experimental stress-range versus load cycle relationships (SN curves) for the fatigue strength of fillet-welded connections. The nominal strength SN curve obtained by this research essentially matched the SN curve for Category E aluminum weldments given in the AASHTO LRFD specifications. All of the Category E fatigue fractures that developed in the girder test specimens satisfied the allowable SN relationship specified by the fatigue provisions of the Aluminum Association. The lower-bound strength line that was set at two standard deviations below the least squares regression line through the fatigue fracture data points related well with the Aluminum Association SN curve. The results from the experimental tests of this research have provided additional information regarding behavioral characteristics of full-size, aluminum members and have confirmed that aluminum has the strength properties needed for highway bridge girders.