Since the 1980s, the Iowa Department of Transportation has increased its use of recycled Portland Cement Concrete (PCC) as drainable base material below some new pavements. Water flowing out of the longitudinal drains on projects having recycled PCC drainable bases was found to have a high pH value. The high pH water impedes vegetation growth and becomes a contributing factor to soil erosion at the drain outlet. In addition, the high pH water contributes to the growth of crystalline deposits on the drain outlet wire mesh rodent guard and in some cases caused it to become completely blocked. This research determined which of three choices of recycled PCC drainable base material, gradation, and design would give the lowest pH value in the drain discharge water. The drainable base material having its fines separated out and placed as a 2-in. (5.1-mm) bottom layer, below the remaining coarse material, generally gave pH values around 11.2 while other designs tested gave pH values around 11.5.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The overarching goal of the proposed research was to provide a predictive tool for knickpoint propagation within the HCA (Hungry Canyon Alliance) territory. Knickpoints threaten the stability of bridge structures in Western Iowa. The study involved detailed field investigations over two years in order to monitor the upstream migration of a knickpoint on Mud Creek in Mills County, IA and identify the key mechanisms triggering knickpoint propagation. A state-of-the-art laser level system mounted on a movable truss provided continuous measurements of the knickpoint front for different flow conditions. A pressure transducer found in proximity of the truss provided simultaneous measurements of the flow depth. The laser and pressure transducer measurements led to the identification of the conditions at which the knickpoint migration commences. It was suggested that negative pressures developed by the reverse roller flow near the toe of the knickpoint face triggered undercutting of the knickpoint at this location. The pressure differential between the negative pressure and the atmospheric pressure also draws the impinging jet closer to the knickpoint face producing scour. In addition, the pressure differential may induce suction of sediment from the face. Other contributing factors include slump failure, seepage effects, and local fluvial erosion due to the exerted fluid shear. The prevailing flow conditions and soil information along with the channel cross-sectional geometry and gradient were used as inputs to a transcritical, one dimensional, hydraulic/geomorphic numerical model, which was used to map the flow characteristics and shear stress conditions near the knickpoint. Such detailed flow calculations do not exist in the published literature. The coupling of field and modeling work resulted in the development of a blueprint methodology, which can be adopted in different parts of the country for evaluating knickpoint evolution. This information will assist local government agencies in better understanding the principal factors that cause knickpoint propagation and help estimate the needed response time to control the propagation of a knickpoint after one has been identified.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Soil consolidation and erosion caused by roadway runoff have exposed the upper portions of steel piles at the abutments of numerous bridges, leaving them susceptible to accelerated corrosion rates due to the abundance of moisture, oxygen, and chlorides at these locations. This problem is compounded by the relative inaccessibility of abutment piles for close-up inspection and repair. The objective of this study was to provide bridge owners with recommendations for effective methods of addressing corrosion of steel abutment piles in existing and future bridges A review of available literature on the performance and protection of steel piles exposed to a variety of environments was performed. Eight potential coating systems for use in protecting existing and/or new piles were selected and subjected to accelerated corrosion conditions in the laboratory. Two surface preparation methods were evaluated in the field and three coating systems were installed on three piles at an existing bridge where abutment piles had been exposed by erosion. In addition, a passive cathodic protection (CP) system using sacrificial zinc anodes was tested in the laboratory. Several trial flowable mortar mixes were evaluated for use in conjunction with the CP system. For existing abutment piles, application of a protective coating system is a promising method of mitigating corrosion. Based on its excellent performance in accelerated corrosion conditions in the laboratory on steel test specimens with SSPC-SP3, -SP6, and -SP10 surface preparations, glass flake polyester is recommended for use on existing piles. An alternative is epoxy over organic zinc rich primer. Surface preparation of existing piles should include abrasive blast cleaning to SSPC-SP6. Although additional field testing is needed, based on the results of the laboratory testing, a passive CP system could provide an effective means of protecting piles in existing bridges when combined with a pumped mortar used to fill voids between the abutment footing and soil. The addition of a corrosion inhibitor to the mortar appears to be beneficial. For new construction, shop application of thermally sprayed aluminum or glass flake polyester to the upper portion of the piles is recommended.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Joints are always a concern in the construction and long-term performance of concrete pavements. Research has shown that we need some type of positive load transfer across transverse joints. The same research has directed pavement designers to use round dowels spaced at regular intervals across the transverse joint to distribute the vehicle loads both longitudinally and transversely across the joint. The goal is to reduce bearing stresses on the dowels and the two pavement slab edges and erosion of the underlying surface, hence improved long-term joint and pavement structure performance. Road salts cause metal corrosion in doweled joints, excessive bearing stresses hollow dowel ends, and construction processes are associated with cracking pavement at the end of dowels. Dowels are also a cost factor in the pavement costs when joint spacing is reduced to control curling and warping distress in pavements. Designers desire to place adequate numbers of dowels spaced at the proper locations to handle the anticipated loads and bearing stresses for the design life of the pavement. This interim report is the second of three reports on the evaluation of elliptical steel dowels. This report consists of an update on the testing and performance of the various shapes and sizes of dowels. It also documents the results of the first series of performance surveys and draws interim conclusions about the performance of various bar shapes, sizes, spacings, and basket configurations. In addition to the study of elliptical steel dowel performance, fiber reinforced polymers (FRP) are also tested as elliptical dowel material (in contrast to steel) on a section of the highway construction north of the elliptical steel test sections.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Duck Creek watershed has been the target study area of multiple reports by multiple agencies including a 2009 DNR Watershed Master Planning Grant, and the 2011 Duck and Blackhawk Creek Stream Assessment. The information obtained from these reports has lead the City of Davenport to take a micro-watershed approach to identifying the significant contributors to flooding and water quality issues that affect Duck Creek, its tributaries and the surrounding landscape, and devise solutions to mitigate these concerns. The construction of the proposed Littig Area Detention Basin comes as a recommendation from the Comprehensive Stormwater Management Plan for Pheasant, Goose, and Silver Creeks as prepared by James M. Montgomery, Consulting Engineers, Inc. in September 1991. At the time this report was prepared this basin was one of eight regional detention basins proposed in the upstream watersheds to alleviate flooding on tributaries to Duck Creek. The basin is designed and situated to detain runoff from approximately two hundred and twenty-seven (227) acres of previously developed moderate density residential area with intermixed light business and schools. This basin will reduce flow rates entering the receiving waters from the two, five and ten year storm events by an average of eighty-five percent (85%) and reduce flow rates from the twenty-five, fifty, and one hundred year events by a11 average of fifty percent (50%). With this flow rate reduction it is anticipated that streambank erosion in the immediate downstream receiving waters can be reduced or even stopped. The reduction in sediment leaving this upstream area will greatly enhance the water quality further downstream in Goose and Duck Creeks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Little River Lake watershed is a 13,305 acre subwatershed of Little River. The 788 acre lake was listed as a 303d impaired water body in 2008 due to elevated turbidity and algae levels. The Decatur SWCD has prioritized water quality protection efforts within the Little River Lake watershed because 1) portions of this watershed has been identified as the primary contributor of sediment and nutrients to Little River Lake, which provides an essential source of drinking water for Decatur County and the Southern Iowa Rural Water Association; 2) the watershed provides exemplary education and project interpretation opportunities due to its proximity to Little River Lake Recreation Area, and 3) by using targeted and proven soil conservation practices to address water quality deficiencies the probability of successfully attenuating soil erosion and ameliorating water quality impairments is enhanced. The specific goals of this proposal are to: 1. reduce annual sediment, and phosphorous delivery to the lake by 11,280 tons and 14,664 lbs., respectively, via applications of conservation practices on targeted agricultural land; 2. delist the lake as an EPA 303d impaired water body via water quality enhancement; 3. obtain a “Full Support” status for the lake’s aquatic life and recreational use; 4. reduce potable water treatment costs (minimum 50% cost reduction) associated with high suspended solid levels; and 5. restore a viable sport-fish population, thereby bolstering tourism and the economy. To achieve timely project implementation the Decatur SWCD has cooperated with the IDNR Watershed Improvement Section, Fisheries Bureau, and IDALS-DSC to assess extant water quality and watershed conditions, coalesced a diverse team of committed partners and secured matching funding from multiple sources.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 2004, Walnut Creek was placed on the 303d list of Impaired Waters due to a low biotic index (lack of aquatic life) during IDNR stream sampling events. Sediment originating from agriculture, streambank erosion, and channelization were listed as the most likely sources impacting aquatic life. In an effort to address these concerns, a preliminary study was completed of the multi-county watershed to identify priority areas. A Watershed Development & Planning Assistance Grant was then funded by the IDALS-DSC to conduct a detailed assessment of these prioritized sub-watersheds. The impending assessment of the watershed and the stream corridor revealed ample opportunities to address gully, sheet and rill erosion while addressing in-stream water velocity issues that plagued the riparian corridor. A comprehensive plan was developed comprised of a variety of best management practices to address the identified concerns. In 2009, this plan was submitted to the WIRB Board by the East Pottawattamie and Montgomery SWCDs and $489,455 was awarded to address concerns identified during watershed assessment inquiries. Despite adverse weather conditions, which has hampered conservation construction recently, this project has held fast to pre-project goals due to the fortitude of the project sponsors and the overwhelming participation by the watershed landowners. Unfortunately, state budget shortfalls are bringing project progress to a halt. As specified in the original WIRB funding request, practice funding for Year 3 was to come from the Division of Soil Conservation’s Watershed Protection Fund (WSPF). Due to Iowa’s budgetary restraints, the Walnut Creek WSPF application, which was submitted this spring, was not funded since no new applications in the state were funded. If funded again, this grant will serve as the critical step in continuing what is destined to be a true watershed success story.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Part of a phased approach, an intensive information and education program, construction of erosion control practices, and sediment control on construction sites is proposed. These proposed practices will manage sediment runoff and nutrient runoff on agricultural and urban areas. Sediment control “structures” such as waterways, wetlands, modified terraces, grade stabilization structures, sediment basins, and rain gardens is proposed and will be combined with nutrient and pesticide management and reduced tillage to reduce non-point source pollution. A reduction of 15% of the sediment and phosphorus delivered to a water body from priority areas will be looked at as a success in this short-term project focused primarily at education within the project area which is also, for the most part, the top 25% sediment load producing sub-watersheds. In addition, four urban areas have been identified as part of this project as needing immediate assistance. A combination of urban and agricultural conservation practices, shoreline revegetation, and education of landowners will be used to achieve these results on both the urban and the agricultural arena.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Little Clear Lake is a 162 acre natural lake located in the western part of Pocahontas County. The lake has a 375 acre watershed that is gently rolling with nearly 84% of the watershed in row crop production. The lake is listed on the Iowa DNR’s impaired waters list due to nutrients, siltation and exotic species (purple loosestrife). These impairments have been verified with in-lake monitoring and landowner conversations as well as watershed modeling. The watershed models estimates that the average sheet and rill erosion is 1.74 tons/acre/year and sediment delivery is .12 tons/acre/year with a total of 44 tons/year being delivered to Little Clear Lake. The goal of the Little Clear Lake Watershed Protection Plan is to (1) reduce sediment delivery to Little Clear Lake by 60%, or 26.5 tons annually, by installing best management practices within the watershed. Doing this will control nearly 100% of the of the lake’s drainage area; and (2) initiate an information and education campaign for residents within the Little Clear Lake watershed which will ultimately prepare the residents and landowners for future project implementation. In an effort to control sediment and nutrient loading the Little Clear Lake Watershed Protection Plan has included 3 sediment catch basin sites and 5 grade stabilization structures, which function to stabilize concentrated flow areas.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Hurley Creek Watershed is a micro-watershed of approximately 2,211 acres (3.5 square miles), which drains into the Platte River southwest of Creston. The watershed is 64% urban and 36% rural. The urban area includes the bulk of the town of Creston (population 7,597) and the rural area is just north of Creston, which includes the origin of Hurley Creek. Hurley Creek Watershed was examined for improvements following a citizens group in 2004 determined a need and desire to make McKinley Lake, a 65-acre city-owned lake, a quality fishery and viable swimming lake, as it once was. As part of a major park improvement project over ten-plus years, the watershed improvement project is undertaken to reduce pollution entering the lake. In 2006, IOWATER volunteers, under guidance of the town’s consultants, sampled the stream in 8 locations throughout the year, a total of 92 samples. The samples, along with visual inspections of the creek, found three major impairments: 1) high E. Coli levels, 2) severe erosion, and 3) storm water management. Using the Watershed Project Planning Protocol, the consultant and a volunteer committee of interested citizens determined that five physical and three administrative actions should be undertaken. The request will help: identify sources of E. Coli and reduce its delivery into the watershed, control animal access, manage storm water, implement stream-bank stabilization, educate the public, and develop miscellaneous small projects on specific properties.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Big Bear Creek is the upper portion of Bear Creek which drains 26,734 acres and ends at the Highway 136 crossing of Bear Creek. Bear Creek flows into the section of the Maquoketa River, which is on the EPA’s 303(d) List of Impaired Waters. Monitoring by the Iowa DNR indicates that Bear Creek is contributing significant amounts of sediment and nutrients to the Maquoketa River. The primary use of land in the Big Bear Creek Watershed is row crop production. A roadside survey completed by Anamosa Field Office Staff indicated that 123,747 tons/yr. of sediment was being lost due to sheet and rill erosion only. The sediment delivered to Big Bear Creek is 24,447 tons/yr. Based on this data, 34,226 lbs. of Phosphorus is reaching the stream per year. With the added amount of sediment and phosphorus delivery through gully and streambank erosion, one can clearly see that the water quality in Bear Creek is severely impaired. The Big Bear Watershed Project will work to reduce the sediment and phosphorus delivered to the stream by 30% through the installation of practices that trap sediment and reduce erosion.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The focus of this project is "Indian Creek", a tributary to Cedar Creek which eventually empties into the Lower Skunk River. Indian Creek suffers from deteriorated water quality resulting from high volumes of urban stormwater runoff resulting in streambank erosion, combined sewer overflows and chemical and floatable litter pollution from roadways. The "Creative Solution for Indian Creek Water Quality" project will work with a local commercial business to create a model urban project The project will reduce the volume of urban stormwater by 930,000 gallons annually entering Indian Creek as well as reduce the volume of discharge water by 500,000 gallons annually. The local business will develop a system to divert stormwater from l acre of their roof as well as coolant discharge water from their factory into an existing retention pond. In addition, the project will reduce demand on the municipal water supply by 500,000 gallons annually by harvesting water from the retention pond for cooling operations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The urban portion of the Kettle Creek Watershed is experiencing severe bank and bed erosion due to unchecked stormwater runoff and a steep stream slope. The Kettle Creek Urban Watershed Improvement Project will reduce sediment input to the stream by stabilizing the steam bed with rock-riffle stream stabilization structures and stream bank improvements at select locations. Other components of the watershed are being addressed for excess sediment loads including the agricultural portion by constructing sediment detention basins, and the urban stormwater component by separating the existing combined sanitary and stormwater systems. The urban stream erosion factor represents the weak link in the current watershed impairment. The benefits of the all the watershed improvements components will be realized by all the residents of Kettle Creek Watershed as well as the citizens of Ottumwa.