72 resultados para over firing
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period June 18, 2012 through July 11, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa State University of Science and Technology Room and Board System for the period of April 9, 2012 through May 1, 2012
Resumo:
Report on a review of selected general and application controls over the University of Iowa Hospitals and Clinics’ GE Centricity System for the period May 28, 2012 through July 30, 2012
Resumo:
Audit report on internal control over financial reporting and on compliance and other matters of the State of Iowa for the year ended June 30, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s Human Resource Information System (HRIS), Payroll System and Integrated Information for Iowa System (I/3) for the period March 26, 2012 through April 27, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Workforce Development (IWD) MyIowaUI and Unemployment Insurance Benefit systems for the period April 16, 2012 through May 4, 2012
Resumo:
The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated high performance concrete (HPC) bridge elements that are connected, in place, utilizing advanced material closure-pours and quick-to-install connection details. The Keg Creek Bridge is the first bridge in the US to utilize moment-resisting ultra-high performance concrete (UHPC) joints in negative moment regions over piers. Through laboratory and live load field testing, performance of these transverse joints as well as global bridge behavior is quantified and examined. The effectiveness of the structural performance of the bridge is evaluated to provide guidance for future designs of similar bridges throughout the US.
Resumo:
Report on a review of selected general and application controls over the University of Northern Iowa Student Information System for the period June 12, 2012 through July 16, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Workforce Development’s MyIowaUI and Unemployment Insurance Benefits systems for the period April 29, 2013 through May 10, 2013
Resumo:
Report on a review of selected general and application controls over the State University of Iowa ePost and Effort Reporting systems for the period May 29, 2013 through July 19, 2013
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Vehicle Registration and Title System for the period April 16, 2012 through May 15, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 20, 2013 through July 12, 2013
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Vendor Payment System for the period March 11, 2013 through April 12, 2013
Resumo:
Reflective cracking of asphalt resurfacing has been a concern for a long time. Years ago wire mesh was used to control widening cracks. More recently it has been fabrics or fiberglass. In 1986, part of the proposed fabric was deleted from projects in different parts of Iowa with various histories and designs. These projects were monitored in 1988, 1989, 1990 and 1992 with only the thin (3 inch) overlays on newly widened pavements showing a significantly greater percentage of cracks in the areas where the fabric was deleted.
Resumo:
Report on a review of selected general and application controls over the Iowa State University of Science and Technology student financial aid system for the period of April 22, 2013 through May 17, 2013