78 resultados para multibody application


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period June 18, 2012 through July 11, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa State University of Science and Technology Room and Board System for the period of April 9, 2012 through May 1, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the University of Iowa Hospitals and Clinics’ GE Centricity System for the period May 28, 2012 through July 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Unless specifically exempted, a certificate of registration is required to operate an aircraft in Iowa (in addition to being registered with the FAA). Aircraft registration laws are defined in Iowa Code Chapter 328. A general summary follows: Iowa residents and businesses must register an aircraft unless it is continuously located and operated beyond the boundaries of the state. Nonresident owners of aircraft providing the intrastate transportation of persons or property for compensation, the furnishing of services for compensation, or intrastate transportation of merchandise in Iowa, must register aircraft with the Iowa DOT prior to conducting those operations. Other visitors are exempt from registering aircraft in Iowa as long as their aircraft are not operated or controlled in the state for more than 30 days a year. Annual registration fees are based on aircraft age, original manufactured list price, and its type of use (personal or business). A one-time six percent use tax on the purchase price of the aircraft is collected at the time of registration. Aircraft registration fees (and aviation fuel taxes) are deposited into a State Aviation Fund to help fund aviation programs in Iowa such as airport development projects, the automated weather observing system (AWOS), runway markings, and windsocks

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Key factors that provide context for the state's Maternal and Child Health (MCH) annual report and state plan are highlighted in this overview. This section briefly outlines Iowa's demographics, population changes, economic indicators and significant public initiatives. Major strategic planning efforts affecting development of program activities are also identified.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s Human Resource Information System (HRIS), Payroll System and Integrated Information for Iowa System (I/3) for the period March 26, 2012 through April 27, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Workforce Development (IWD) MyIowaUI and Unemployment Insurance Benefit systems for the period April 16, 2012 through May 4, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Any transportation infrastructure system is inherently concerned with durability and performance issues. The proportioning and uniformity control of concrete mixtures are critical factors that directly affect the longevity and performance of the portland cement concrete pavement systems. At present, the only means available to monitor mix proportions of any given batch are to track batch tickets created at the batch plant. However, this does not take into account potential errors in loading materials into storage silos, calibration errors, and addition of water after dispatch. Therefore, there is a need for a rapid, cost-effective, and reliable field test that estimates the proportions of as-delivered concrete mixtures. In addition, performance based specifications will be more easily implemented if there is a way to readily demonstrate whether any given batch is similar to the proportions already accepted based on laboratory performance testing. The goal of the present research project is to investigate the potential use of a portable x-ray fluorescence (XRF) technique to assess the proportions of concrete mixtures as they are delivered. Tests were conducted on the raw materials, paste and mortar samples using a portable XRF device. There is a reasonable correlation between the actual and calculated mix proportions of the paste samples, but data on mortar samples was less reliable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the University of Northern Iowa Student Information System for the period June 12, 2012 through July 16, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Workforce Development’s MyIowaUI and Unemployment Insurance Benefits systems for the period April 29, 2013 through May 10, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the State University of Iowa ePost and Effort Reporting systems for the period May 29, 2013 through July 19, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Transportation’s Vehicle Registration and Title System for the period April 16, 2012 through May 15, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 20, 2013 through July 12, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Transportation’s Vendor Payment System for the period March 11, 2013 through April 12, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.